BLD-Footing | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Annie Coates
|
BLD-Footing | 8/30/2015 | 8/31/2015 | 8/31/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Annie Coates
|
BLD-Footing | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Annie Coates
|
Issue PAID IN FULL permit | | | 8/6/2015 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 7/14/2015 | 7/14/2015 | 7/21/2015 | | DONE |
Brian McGowan
|
|
|
walk in basement
|
OVERRIDE | | | 7/17/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 7/17/2015 | | 7/17/2015 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/17/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/17/2015 | | DONE |
Christina Prado
|
|
|
Called Annie to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 7/17/2015 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/14/2015 | 7/14/2015 | 7/14/2015 | A | FAIL |
Tisha Gallop
|
|
|
need all structural plans to verify loads even though framing is not part of scope of work
|
Application received | | 7/14/2015 | | | |
|
|
|
as per Sue Cummings no P & Z review needed
|