BLD-Final | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Jim Storey
|
|
|
Garage access code it 0713. Please let me know if there are any questions. Thx Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 10/13/2015 | 10/14/2015 | 10/14/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Framing/Rough-in | 10/10/2015 | 10/12/2015 | 10/12/2015 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by steve hanson brace a02 web ok to insulate.
|
BLD-Wall Bracing | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Foundation | 8/20/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Conference | 8/18/2015 | 8/18/2015 | 8/18/2015 | A | DEFR |
Jim Storey
|
|
|
Erosion control inspection. Phone #: ###-#### Inspection requested via web by Lucas Christian to esc long
|
Issue PAID IN FULL permit | | | 8/14/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/13/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 7/29/2015 | 7/29/2015 | 8/13/2015 | | DONE |
Brian McGowan
|
|
|
First review completed
|
Routing - PLAN CHECK | 8/11/2015 | | 8/13/2015 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 8/13/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/13/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2015 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/13/2015 | | DONE |
|
|
|
all requirements met
|
Inspection Record Card- Bld | | | 8/13/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2015 | | DONE |
|
|
|
Spoke with Steve informing him that his permit is ready.
|
Plan resubmittals received | | | 8/11/2015 | | DONE |
|
|
|
Two copies of sheets 2,4,5,6 and 10. Taken to Brian M
|
1st review completed | | | 8/3/2015 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/23/2015 | | 8/3/2015 | | FAIL |
Brian McGowan
|
|
|
Balloon frame engineering needed at entry/stairway.
Header over garage door insufficient in StruCalc.
Two story foundation walls should be 8"x24" cont. conc. on 19"x8" cont. conc. footings and called out on plans.
Type of roofing to be installed is not specified.
|
Plan assigned to (LEG) Tisha | 7/16/2015 | | 7/29/2015 | | DEFR |
Tisha Gallop
|
|
|
7/30
|
Routing - MECHANICAL | 7/20/2015 | | 7/23/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/17/2015 | | 7/20/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 7/16/2015 | | 7/17/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2015 | | 7/17/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2015 | | DONE |
|
|
|
|
Application received | | | 7/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 14 2015 3:39PM
|