BLD-Final | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/6/2015 | 11/12/2015 | 11/12/2015 | A | NR |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Needs blower door test.
|
BLD-Energy code compliance | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2015 | 9/17/2015 | 9/17/2015 | P | PASS |
Mike Jordan
|
|
|
Joe-would like as early poss Phone #: ###-####. All framing issues resolved.
|
BLD-Framing/Rough-in | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | CANC |
Phil Shearer
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | FAIL |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Complete lateral bracing on T2,T6,T7 and T10 trusses. The interior bearing points on T6,T7,T8,T9 and T10 trusses have been missed. Provide fix from truss engineer.(Trusses backwards?) Foam all top plate penetrations at 1/2 inch gas line penetrations and at exterior wall. A mech permit and inspection is required for the gas fireplace prior to energy code inspection.
|
BLD-Wall Bracing | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Dave Hannah
|
|
|
Shear // Joe Phone #: ###-####
|
BLD-Footing | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PART |
Dave Hannah
|
|
|
Matt Phone #: ###-#### grade and setbacks ok
|
BLD-Footing | 8/12/2015 | 8/13/2015 | 8/14/2015 | P | FAIL |
Dave Hannah
|
|
|
Matt Phone #: ###-#### subgrade north side needs to dug out
|
Issue PAID IN FULL permit | | | 8/11/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/3/2015 | | |
|
|
|
|
Telephone call | | | 8/3/2015 | | DONE |
|
|
|
called Joseph- left message that permit is ready for pick up and fees due
|
Permit Ready to Issue | | | 8/3/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Plan assigned to (AJS) | 7/31/2015 | 7/31/2015 | 7/31/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 7/31/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 7/31/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/16/2015 | | 7/31/2015 | | DEFR |
Tisha Gallop
|
|
|
7/30
|
Routing - PLAN CHECK | 7/31/2015 | | 7/31/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 7/17/2015 | | 7/28/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/17/2015 | | 7/17/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 7/16/2015 | | 7/17/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2015 | | 7/17/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2015 | | DONE |
|
|
|
|
Application received | | 7/16/2015 | | | |
|
|
|
|