Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-02486
StatusIssued
Name LURRE CONSTRUCTION
Site Address 3550 E WARM SPRINGS
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit is for engineered 4’ to 9’ retaining walls for the Privada Estates Subdivision. All work for the engineered retaining wall to be constructed per the approved plans, attached engineering and current local codes. Note special inspection required. **JG** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing8/27/20158/28/20158/28/2015APASS
DetailsPhil Shearer
Lance Phone #: ###-####
PubWorks Subgrade Approval8/28/20158/28/20158/28/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  8/27/2015  
Plan assigned to (JG) 7/16/20158/27/2015 PASS
DetailsJavier Guzman
1st review completed, retaining walls for subdivision Pending planning
Inspection Record Card- Bld  8/27/2015 DONE
Telephone call  8/27/2015 DONE
Left a message for Lance informing him that we would need to know who the RP is going to be and the fee amount due
Issue PAID IN FULL permit  8/27/2015 DONE
Routing - PLANNING8/26/2015 8/27/2015 PASS
DetailsTodd Tucker
A variance (CVA15-00040) allowed retaining walls over 3' in height in the front setback. CFH15-00050 approved the retaining walls in the hillside.
Routing - PLAN CHECK  8/27/2015 PASS
DetailsJavier Guzman
Case Summary (BLD)  8/27/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/27/2015 DONE
Permit Ready to Issue  8/27/2015 DONE
***ALL REQUIRMENTS MET 8-27-15 //CEV NEED RP
Plan resubmittals received  8/26/2015 DONE
DetailsChristina Prado
Received one sets of approved CVA letter and two sets of footing sub grade approval letter; Plans stamped and taken to JG for further review
Routing - PLAN CHECK8/19/2015 8/21/2015 PASS
DetailsJavier Guzman
Plan resubmittals received  8/19/2015 DONE
received (2) copies of: Engineer Letter, Statement of Special Inspections, Structural Calculations
Routing - PLAN CHECK  8/3/2015 FAIL
DetailsJavier Guzman
emailed appicants review report
1st review completed  8/3/2015 FAIL
DetailsJavier Guzman
Routing - Erosion and Sediment7/27/2015 7/27/2015 PASS
DetailsEvan Jenkins
New 6" Retaining walls for subdivision.
Routing - PLANNING7/23/2015 7/24/2015 FAIL
DetailsDavid Moser
Failed, retaining wall over 6 feet in height within setback
Routing PW Grading-Hillside7/16/2015 7/23/2015 PASS
DetailsJason C. Taylor
***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####***Walls are approved for construction. Drainage is acceptable. Jason Taylor ###-####.
Plans ACCEPTED BY PLAN TECH  7/16/2015 DONE
DetailsChristina Prado
Intake Approval  7/16/2015 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  7/16/2015 DONE
DetailsChristina Prado
Application received 7/16/2015