BLD-Footing | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Phil Shearer
|
|
|
Lance Phone #: ###-####
|
PubWorks Subgrade Approval | 8/28/2015 | 8/28/2015 | 8/28/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/27/2015 | | |
|
|
|
|
Plan assigned to (JG) | | 7/16/2015 | 8/27/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, retaining walls for subdivision Pending planning
|
Inspection Record Card- Bld | | | 8/27/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/27/2015 | | DONE |
|
|
|
Left a message for Lance informing him that we would need to know who the RP is going to be and the fee amount due
|
Issue PAID IN FULL permit | | | 8/27/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 8/26/2015 | | 8/27/2015 | | PASS |
Todd Tucker
|
|
|
A variance (CVA15-00040) allowed retaining walls over 3' in height in the front setback. CFH15-00050 approved the retaining walls in the hillside.
|
Routing - PLAN CHECK | | | 8/27/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 8/27/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/27/2015 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 8-27-15 //CEV NEED RP
|
Plan resubmittals received | | | 8/26/2015 | | DONE |
Christina Prado
|
|
|
Received one sets of approved CVA letter and two sets of footing sub grade approval letter; Plans stamped and taken to JG for further review
|
Routing - PLAN CHECK | 8/19/2015 | | 8/21/2015 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 8/19/2015 | | DONE |
|
|
|
received (2) copies of: Engineer Letter, Statement of Special Inspections, Structural Calculations
|
Routing - PLAN CHECK | | | 8/3/2015 | | FAIL |
Javier Guzman
|
|
|
emailed appicants review report
|
1st review completed | | | 8/3/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 7/27/2015 | | 7/27/2015 | | PASS |
Evan Jenkins
|
|
|
New 6" Retaining walls for subdivision.
|
Routing - PLANNING | 7/23/2015 | | 7/24/2015 | | FAIL |
David Moser
|
|
|
Failed, retaining wall over 6 feet in height within setback
|
Routing PW Grading-Hillside | 7/16/2015 | | 7/23/2015 | | PASS |
Jason C. Taylor
|
|
|
***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####***Walls are approved for construction. Drainage is acceptable. Jason Taylor ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/16/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/16/2015 | | | |
|
|
|
|