BLD-Final | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Jim Storey
|
|
|
JIm, give me a call before or when you get to the job. My cell is ###-#### Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
DOC - Permit Finaled | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | DEFR |
Jim Storey
|
|
|
JIm, give me a call before or when you get to the job. My cell is ###-#### Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Conference | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | DEFR |
Jim Storey
|
|
|
JIm, give me a call before or when you get to the job. My cell is ###-#### Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen out of time rolled to am
|
BLD-Final | 4/26/2016 | 4/27/2016 | 4/27/2016 | P | FAIL |
Jim Storey
|
|
|
call Dave for Garage Door code ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen handrail continous nose to nose top run/ min 4 inches open at risers. all the rest of house ok
|
PubWorks Occupancy Approval | 4/27/2016 | 4/27/2016 | 4/27/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Grading Inspection | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | NR |
Jim Storey
|
|
|
Final is scheduled for this afternoon. I had talked with someone last week who went out after receiving the letter from our soils engineer last week. They told me that they would be out again Tuesday afternoon to reinspect after we had the street clean and the BMP removed from the gutter drain. I did not know if I needed to order this inspection as well for this afternoon since he had told me he was going out today. Thanks, Kent Mortensen. Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Final | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | NR |
Jim Storey
|
|
|
call Dave for Garage Door code ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Energy code compliance | 2/22/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Jim Storey
|
|
|
Dave''s Cell ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | P | PART |
Jim Storey
|
|
|
Dave''s cell is ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen fire blk ceilling at fireplace/ blk garage pannel
|
BLD-Framing/Rough-in | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | NR |
Jim Sly
|
|
|
Dave''s cell is ###-#### if you have any questions or want to meet him there. Phone #: ###-#### Inspection requested via web by Kent Mortensen No Mech pressure test or Rough-in approval. No inspection performed.
|
Plan Modification Accepted | | | 2/18/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/18/2016 | | 2/18/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | PART |
Jim Storey
|
|
|
Dave''s cell ph ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen engineering change pending 16 oc to 24/
|
BLD-Foundation | 1/7/2016 | 1/8/2016 | 1/8/2016 | A | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 1/6/2016 | 1/7/2016 | 1/7/2016 | P | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | CANC |
Phil Shearer
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PART |
Tony Young
|
|
|
Wall // Mana Phone #: ###-####,, work in progress,, will pour 12/15
|
BLD-Footing | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Jim Storey
|
|
|
Foundation Contractor - Mana Dengsolth - C: ###-#### call Mana before you go out for best time for inspection on footings Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Footing | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | DEFR |
Jim Storey
|
|
|
Foundation Contractor - Mana Dengsolth - C: ###-#### call Mana before you go out for best time for inspection on footings Phone #: ###-#### Inspection requested via web by Kent Mortensen not ready rolled over to am.
|
BLD-Footing | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | NR |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
PubWorks Subgrade Approval | 11/25/2015 | 11/25/2015 | 11/25/2015 | | DONE |
Jason C. Taylor
|
|
|
***Basement footings/slabs only***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
PubWorks Subgrade Approval | 11/23/2015 | 11/23/2015 | 11/23/2015 | | DONE |
Jason C. Taylor
|
|
|
**BLOCK RETAINING WALL ONLY**** letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 9/30/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/15/2015 | 9/15/2015 | 9/30/2015 | | DONE |
Brian McGowan
|
|
|
due 10/5 L2
|
Issue PAID IN FULL permit | | | 9/30/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/21/2015 | | 9/29/2015 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/29/2015 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 9/24/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/24/2015 | | 9/24/2015 | | PASS |
Tisha Gallop
|
|
|
per bjm - pending ESC and Fire approval
|
Routing - FIRE | 9/18/2015 | 9/14/2015 | 9/21/2015 | | PASS |
Scott Arellano
|
|
|
Approved. No comments attached. See small documents for WUI defensible space code alternate approval.
|
Routing - Erosion and Sediment | 9/18/2015 | | 9/18/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 4,430 sq. ft., one story with a basement level (main story 2,241 sq. ft., basement level 2,189 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 139 sq. ft. of covered patio/porch and a 850 sq. ft. attached garage
|
Routing - MECHANICAL | 9/15/2015 | | 9/18/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/15/2015 | | 9/15/2015 | | PASS |
David Moser
|
|
|
CFH15-00042
|
Plan assigned to (LEG) Tisha | 9/14/2015 | | 9/15/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 9/14/2015 | | 9/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/14/2015 | | 9/14/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/14/2015 | | PASS |
|
|
|
all submittal requirments met
|
Recd Pcfee & Taken To Pln CK | | | 9/14/2015 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | | | 9/14/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Intake Approval | | | 7/16/2015 | | FAIL |
Carlos Velazquez
|
|
|
Needs; planning & zoning approval letter
|
Application received | | 7/16/2015 | | | |
|
|
|
|