Permit Information
Permit NumberBLD15-02487
StatusFinaled
Name MORTENSEN CONSTRUCTION
Site Address 3444 E SWEETWATER DR
Project Name 
Customer NumberCFH15-00042
ePlanReviewNo
Description
Permit for the construction of a new 4,430 sq. ft., one story with a basement level (main story 2,241 sq. ft., basement level 2,189 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 139 sq. ft. of covered patio/porch, 212 sq. ft. covered deck and a 850 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. //LEG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/3/20165/4/20165/4/2016APASS
DetailsJim Storey
JIm, give me a call before or when you get to the job. My cell is ###-####
Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen
DOC - Permit Finaled5/4/20165/4/20165/4/2016PPASS
DetailsJim Storey
BLD-Final5/3/20165/3/20165/3/2016PDEFR
DetailsJim Storey
JIm, give me a call before or when you get to the job. My cell is ###-####
Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen
BLD-Conference5/3/20165/3/20165/3/2016PDEFR
DetailsJim Storey
JIm, give me a call before or when you get to the job. My cell is ###-####
Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen out of time rolled to am
BLD-Final4/26/20164/27/20164/27/2016PFAIL
DetailsJim Storey
call Dave for Garage Door code ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen handrail continous nose to nose top run/ min 4 inches open at risers. all the rest of house ok
PubWorks Occupancy Approval4/27/20164/27/20164/27/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Grading Inspection4/26/20164/26/20164/26/2016PNR
DetailsJim Storey
Final is scheduled for this afternoon. I had talked with someone last week who went out after receiving the letter from our soils engineer last week.
They told me that they would be out again Tuesday afternoon to reinspect after we had the street clean and the BMP removed from the gutter drain.
I did not know if I needed to order this inspection as well for this afternoon since he had told me he was going out today.
Thanks, Kent Mortensen. Phone #: ###-#### Inspection requested via web by Kent Mortensen
BLD-Final4/26/20164/26/20164/26/2016PNR
DetailsJim Storey
call Dave for Garage Door code ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen
BLD-Energy code compliance2/22/20162/23/20162/23/2016PPASS
DetailsJim Storey
Dave''s Cell ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen
BLD-Framing/Rough-in2/18/20162/19/20162/19/2016PPART
DetailsJim Storey
Dave''s cell is ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen fire blk ceilling at fireplace/ blk garage pannel
BLD-Framing/Rough-in2/17/20162/18/20162/18/2016ANR
DetailsJim Sly
Dave''s cell is ###-#### if you have any questions or want to meet him there. Phone #: ###-#### Inspection requested via web by Kent Mortensen
No Mech pressure test or Rough-in approval. No inspection performed.
Plan Modification Accepted  2/18/2016 DONE
new manual j report
Routing - MECHANICAL2/18/2016 2/18/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing1/29/20162/1/20162/1/2016APART
DetailsJim Storey
Dave''s cell ph ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen engineering change pending 16 oc to 24/
BLD-Foundation1/7/20161/8/20161/8/2016APASS
DetailsJim Storey
Mana Phone #: ###-####
BLD-Footing1/6/20161/7/20161/7/2016PPASS
DetailsJim Storey
Mana Phone #: ###-####
BLD-Footing1/5/20161/6/20161/6/2016ACANC
DetailsPhil Shearer
Mana Phone #: ###-####
BLD-Foundation12/14/201512/14/201512/14/2015PPART
DetailsTony Young
Wall // Mana Phone #: ###-####,, work in progress,, will pour 12/15
BLD-Footing12/7/201512/8/201512/8/2015APASS
DetailsJim Storey
Foundation Contractor - Mana Dengsolth - C: ###-####
call Mana before you go out for best time for inspection on footings Phone #: ###-#### Inspection requested via web by Kent Mortensen
BLD-Footing12/7/201512/7/201512/7/2015PDEFR
DetailsJim Storey
Foundation Contractor - Mana Dengsolth - C: ###-####
call Mana before you go out for best time for inspection on footings Phone #: ###-#### Inspection requested via web by Kent Mortensen not ready rolled over to am.
BLD-Footing12/3/201512/3/201512/3/2015PNR
DetailsJim Storey
Mana Phone #: ###-####
PubWorks Subgrade Approval11/25/201511/25/201511/25/2015 DONE
DetailsJason C. Taylor
***Basement footings/slabs only***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.

PubWorks Subgrade Approval11/23/201511/23/201511/23/2015 DONE
DetailsJason C. Taylor
**BLOCK RETAINING WALL ONLY**** letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  9/30/2015  
Plan assigned to (BJM)9/15/20159/15/20159/30/2015 DONE
DetailsBrian McGowan
due 10/5 L2
Issue PAID IN FULL permit  9/30/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/30/2015 DONE
Permit Ready to Issue  9/30/2015 DONE
Routing - PLAN CHECK9/21/2015 9/29/2015 PASS
DetailsBrian McGowan
Case Summary (BLD)  9/29/2015 DONE
DetailsBrian McGowan
1st review completed  9/24/2015 DONE
DetailsBrian McGowan
Routing - PLAN CHECK9/24/2015 9/24/2015 PASS
DetailsTisha Gallop
per bjm - pending ESC and Fire approval
Routing - FIRE9/18/20159/14/20159/21/2015 PASS
DetailsScott Arellano
Approved. No comments attached. See small documents for WUI defensible space code alternate approval.
Routing - Erosion and Sediment9/18/2015 9/18/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

Permit for the construction of a new 4,430 sq. ft., one story with a basement level (main story 2,241 sq. ft., basement level 2,189 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 139 sq. ft. of covered patio/porch and a 850 sq. ft. attached garage
Routing - MECHANICAL9/15/2015 9/18/2015 PASS
DetailsTroy James
Routing - PLANNING9/15/2015 9/15/2015 PASS
DetailsDavid Moser
CFH15-00042
Plan assigned to (LEG) Tisha9/14/2015 9/15/2015 DEFR
DetailsTisha Gallop
Routing - PUBLIC WORKS9/14/2015 9/15/2015 PASS
DetailsJennifer Bruner
Routing - Addressing9/14/2015 9/14/2015 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  9/14/2015 DONE
Intake Approval  9/14/2015 PASS
all submittal requirments met
Recd Pcfee & Taken To Pln CK  9/14/2015 DONE
Routing PW Grading-Hillside  9/14/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Intake Approval  7/16/2015 FAIL
DetailsCarlos Velazquez
Needs; planning & zoning approval letter
Application received 7/16/2015