Third Notice | | 3/15/2016 | 4/7/2016 | | DONE |
|
|
|
This permit finaled on the web by Vaughn Pruett
|
Third Notice | | 2/16/2016 | 3/10/2016 | | DONE |
|
|
|
sent with a letter
|
Third Notice | | 1/19/2016 | 2/11/2016 | | DONE |
|
|
|
|
Third Notice | | 12/15/2015 | 1/14/2016 | | DONE |
|
|
|
|
Second Notice | | 11/19/2015 | 12/10/2015 | | DONE |
|
|
|
mailed 12-11-15
|
First Notice | | 11/8/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
Permanent Occupancy | | | 10/29/2015 | | DONE |
|
|
|
|
BLD-Final | 9/4/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Phil Shearer
|
|
|
Vaughn Phone #: ###-####
|
FIRE-Final Inspection | 9/4/2015 | 9/8/2015 | 9/8/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | PART |
Phil Shearer
|
|
|
OK for temp
|
Temporary Occupancy | 8/25/2015 | 11/23/2015 | 8/25/2015 | | DONE |
Kristal Soland
|
|
|
|
BLD-Final | 8/20/2015 | 8/24/2015 | 8/24/2015 | A | NR |
Phil Shearer
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 8/24/2015 | 8/24/2015 | 8/24/2015 | P | PART |
Troy Cobbley
|
|
|
*Per Scott Arellano* TCO is authorized with interior exit signage completion and structural field inspector verification of signage. Exterior exit discharge lighting shall be completed prior to final sign off.
Troy Cobbley - I actually performed two inspections here today. The first inspection I noted that I need verification that the fire alarm system has been activated, all ceiling tile installed and all exit signs/emergency lights/exit discharge lights installed and functional. Upon my return visit in the afternoon I found tha the fire alarm system is now active but ceiling tile and lights have not been completed. Per electrician the lights will not be finished until tomorrow afternoon.
|
FIRE-Final Inspection | 8/22/2015 | 8/22/2015 | 8/22/2015 | A | PART |
Thomas Walsh
|
|
|
Fire life-safety inspection for new charter school. Many EM lights not operating, including all exit discharge lights. Contractor should check the plans for all indicated EM lights and repair/replace as needed. Fire extinguishers are OK, EVAC plans are not posted. There should be a ceiling in the main electrical room (pendant sprinkler). Exit door hardware looks OK, however there is a gate panic pad that needs to be repaired to make it easier to open the gate. The Fire Dept. should be requested to come out and confirm that the keys in the Knox Box will open up the main entry door. Fire alarm system testing is completed, however off site monitoring is nat active yet, since there is work going on the building that will produce dust, thus causing unwanted alarms. Fire alarm monitoring wil be confirmed at final inspection. Final fire life-safety inspection will be required prior to occupancy. Please schedule a fina lfir inspection when all the discrepancies above have been corrected.
|
FIRE-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final yet. I went over life safety requirements with the general contractor. I noted that there is not water to the building yet and the fire sprinkler system is not complete. The fire alarm system appears to be partially installed and also is not connected to the not installed fire sprinkler riser. Walls have been framed but without coverings and doors.
|
BLD-Framing/Rough-in | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Phil Shearer
|
|
|
Vaughn// please call 30min prior Phone #: ###-####
|
Print Occupancy Form | | | 8/19/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/19/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 7/27/2015 | 7/27/2015 | 8/13/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed witing for PZ hearing to start review Village charter school
|
Routing - PLAN CHECK | 8/13/2015 | | 8/13/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2015 | | DONE |
|
|
|
***ALL REQUIREMENTS MET*** Needs; ACHD approval, GC Form, Revised Certificate of Value
|
Routing - PLAN CHECK | 8/5/2015 | | 8/10/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 8/10/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 8/5/2015 | 8/5/2015 | 8/7/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - MECHANICAL | 8/5/2015 | | 8/7/2015 | | PASS |
Troy James
|
|
|
No mechanical work shown. Redl lined plan sheet with note.
|
Routing - PLANNING | 8/5/2015 | | 8/6/2015 | | PASS |
Brent Moore
|
|
|
Do no issues permit until appeal period ends on August 13th.
|
Routing - Addressing | 8/5/2015 | | 8/5/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/5/2015 | | 8/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 7/27/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 7/27/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Jose, I am sending this project back to you. It has passed per screen at this point. As discussed we will start the plan review after the hearing and review it during the appeal period. Please send the task back to me the day after the hearing for review.
Thank you
Adele
|
Intake Approval | | | 7/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete a lighting com check for the new occupancy classification of the building.
7/23/15 see change mark on lighting com check.
|
Intake Approval | | | 7/21/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete a lighting com check for the new occupancy classification of the building.
|
Application received | | | 7/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 20 2015 8:40AM
|
Routing - PLAN CHECK | 7/27/2015 | | | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Jose, I am sending this project back to you. It has passed per screen at this point. As discussed we will start the plan review after the hearing and review it during the appeal period. Please send the task back to me the day after the hearing for review.
Thank you
Adele
|