Permanent Occupancy | | | 9/9/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | PASS |
Phil Shearer
|
|
|
Dean Phone #: ###-####
|
FIRE-Final Inspection | 8/24/2015 | 8/24/2015 | 8/24/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | NR |
Jim Sly
|
|
|
Dean Phone #: ###-#### Need fire final 1st.
|
FIRE-Final Inspection | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit signs as per plans, provide emergency lighting at the north exit door, remove or repair the non-functional exit sign in the shop area, provide automatic flush bolts for the inactive leaf of the main exit. I verified with Katie that sprinkler protection would not be required per the IFC.
|
Issue PAID IN FULL permit | | | 8/5/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 7/23/2015 | 7/23/2015 | 7/28/2015 | | PASS |
Javier Guzman
|
|
|
TAYLOR-MADE UPHOLSTERY
|
Routing - PLAN CHECK | 7/23/2015 | | 7/28/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/28/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/28/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/28/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Telephone call | | | 7/28/2015 | | DONE |
|
|
|
Emailed Dean because phone didn't ring at all.
|
Print Occupancy Form | | | 7/28/2015 | | DONE |
|
|
|
|
Routing - FIRE | 7/23/2015 | 7/23/2015 | 7/23/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Plan assigned to (CDM) | 7/22/2015 | 7/22/2015 | 7/23/2015 | | DEFR |
Carl D Madsen
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/22/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/22/2015 | | PASS |
|
|
|
approved by Carl M.
|
First Notice | | 9/19/2015 | | | |
|
|
|
|
Application received | | 7/22/2015 | | | |
|
|
|
|