Permit Information
Permit NumberBLD15-02560
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 10700 W JEWELL LN
Project NameCordillera Phase 2 Building 2
Customer NumberBLD15-02559
ePlanReviewNo
Description
(CORDILLERA DEVELOPMENT PHASE 2 - BLDG 2) revisons to footing calculations and 310 form. **10/8/15 ajs**To construct a new 3,680 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  9/30/2016 DONE
Permanent Occupancy  9/30/2016 DONE
Meeting  9/30/2016 DONE
BLD-Final9/16/20169/19/20169/19/2016APASS
DetailsMike Jordan
Dave Phone #: ###-####
Zoning Approval9/9/20169/9/20169/9/2016 DONE
DetailsAndrea Tuning
Telephone call  8/30/2016 DONE
called to talk to Dave about the temp c of o. He's meeting with Andrea T. about the bond then will send the email to Jason Blais
Telephone call  8/25/2016 DONE
called Dave to let know his temp c of o expires next week and he needs to contact Carlo because the bond is expired
BLD-Aging Inspection7/20/20167/20/20167/20/2016 PASS
DetailsMike Jordan
Temporary Occupancy5/31/20168/29/20165/29/2016 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 90 day extension
Temporary Occupancy2/26/20165/26/20162/26/2016 DONE
DetailsBrittany Hill
FIRE-Final Inspection2/24/20162/24/20162/25/2016PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final2/24/20162/25/20162/25/2016APART
DetailsMike Jordan
Kelly Phone #: ###-####. OK for temp occ. Will be ok for perm occ. once zoning signs perm.
Zoning Approval Temp2/24/20162/24/20162/24/2016 DONE
DetailsAndrea Tuning
BLD-Final2/22/20162/23/20162/23/2016APEND
DetailsMike Jordan
Kelly Phone #: ###-####. Structural final is ok. Still needs zoning, public works. Fire/life/safety final has failed. Will be ok after above noted inspections have passed.
BLD-Final2/19/20162/19/20162/19/2016PNR
DetailsMike Jordan
Kelly Phone #: ###-####. Needs life/safety, zoning and public works.
FIRE-Final Inspection2/19/20162/19/20162/19/2016PFAIL
DetailsTroy Cobbley
exposed pipe in Laundry Room and ceiling missing at one head in apartments 102 and 104
BLD-Framing/Rough-in1/5/20161/5/20161/5/2016PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Energy code compliance1/5/20161/5/20161/5/2016PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Framing/Rough-in12/31/201512/31/201512/31/2015PFAIL
DetailsMike Jordan
Kelly Phone #: ###-####. Correction notice posted. Ok to insulate.
BLD-Framing/Rough-in12/30/201512/30/201512/30/2015PFAIL
DetailsJim Storey
Kelly Phone #: ###-#### na no plans
BLD-Wall Bracing12/17/201512/17/201512/17/2015PPASS
DetailsJim Sly
Kelly Phone #: ###-####
BLD-Wall Bracing11/12/201511/12/201511/12/2015PPASS
DetailsMike Jordan
Early please - Kelly Phone #: ###-####
BLD-Wall Bracing11/6/201511/6/201511/6/2015PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Wall Bracing10/27/201510/27/201510/27/2015PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
Plan Reviewer's activity  10/8/2015 DONE
DetailsAdele J Schaffeld-Griffin
revisons to footing calculations and 310 form. **10/8/15 ajs**
BLD-Energy code compliance10/7/201510/7/201510/7/2015PPASS
DetailsMike Jordan
Rob Phone #: ###-####. Rigid insulation at stemwall ok.
BLD-Foundation10/2/201510/2/201510/2/2015PPASS
DetailsJim Sly
Manuel Phone #: ###-####
BLD-Footing10/1/201510/1/201510/1/2015PPASS
DetailsJim Sly
Manuel Phone #: ###-####
Issue PAID IN FULL permit  9/21/2015 DONE
OVERRIDE  9/17/2015  
Telephone call  9/17/2015 DONE
called customer and notified him that permit is ready and forms needed
Print Occupancy Form  9/17/2015 DONE
Permit Ready to Issue  9/17/2015 DONE
Needs; GC Form, Rev Cert of Value, Responsible Person
Plan assigned to (AJS)8/10/20158/10/20159/16/2015 PASS
DetailsAdele J Schaffeld-Griffin
New 4 Plex
Pending Assignment by TLW  9/16/2015 PASS
DetailsTim L. Woodard
Routing - Design Review9/16/2015 9/16/2015 PASS
DetailsAndrea Tuning
Routing - PLANNING9/16/2015 9/16/2015 PASS
DetailsAndrea Tuning
1st review completed  9/16/2015 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  9/16/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  9/16/2015 DONE
Routing - PLAN CHECK9/14/2015 9/16/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - FIRE9/14/20159/14/20159/14/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Plan resubmittals received  9/14/2015 DONE
received (2) copies of Horizontal Control Plan (C2)
Routing - PUBLIC WORKS9/8/2015 9/9/2015 PASS
DetailsJennifer Bruner
Routing PW Solid Waste9/8/2015 9/9/2015 PASS
DetailsMegan Durrell
HOA required to sign service agreement for private roads.

Townhouses required to bring carts to Jewell or pay carry-out rates.
Routing PW Sewer Rating9/8/2015 9/8/2015 PASS
DetailsJennifer Bruner
Routing - Addressing9/2/2015 9/8/2015 PASS
DetailsEmily Dixon
Routing - PLANNING Land Div9/2/2015 9/2/2015 PASS
DetailsDave Abo
Routing - FIRE  8/28/2015 FAIL
DetailsScott Arellano
Comments attached to plans
Routing - MECHANICAL8/17/2015 8/25/2015 PASS
DetailsTroy James
Routing - PLUMBING  8/25/2015 PASS
DetailsDaryl Spivey
Plan resubmittals received  8/25/2015 DONE
DetailsChristina Prado
Received two sets of revised plan sheet marked S0.1 as well as two sets response letter; Plan inserted by arch rep and taken to AJS for additional review
Routing - Erosion and Sediment8/14/2015 8/17/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(CORDILLERA SUBDIVISION BLDG #2)
Routing PW Sewer Rating  8/14/2015 FAIL
DetailsBeverly Mountain
Correct address needed
Routing - PUBLIC WORKS8/10/2015 8/14/2015 FAIL
DetailsJennifer Bruner
See PW Solid Waste, and PW Sewer Rating.
Routing - PLANNING8/14/2015 8/14/2015 FAIL
DetailsSusan Riggs
The final plat has not been recorded, can't sign off plans until recorded SUB15-00014.
Routing - Design Review  8/14/2015 FAIL
DetailsAndrea Tuning
The applicant is requried to provide 9 covered bicycle parking spaces.
The planter island adjacent to the south property line is not a minimum of 8-feet in width (measured inside of curb to inside of curb). It also contains a Class I tree. This tree is required to be a Class II tree.
The three trees adjacent to the parking for the boccee court should be replaced with Class II trees.
Provide an effective landscape barrier to the north and south that is comprised of, but not limited to, a mix of evergreen and deciduous trees, shrubs, lawn, or other vegetative groundcover. This landscaping will be required to close 60 percent or more of the vertical surface area and prevent the passage of vision through the buffer within 5 years of planting the buffer.
The four trees adjacent to Five Mile Road shall be replaced with Class II or Class III trees.
Routing PW Solid Waste8/13/2015 8/13/2015 FAIL
DetailsMegan Durrell
Need to discuss access issues, private lanes, carports, and adequate service for the number of units.
Routing PW Drainage8/12/2015 8/13/2015 PASS
DetailsJason C. Taylor
Project approved under SUB15-00014 ODI#3559. No inspection or plan review required. Jason Taylor ###-####.
Routing PW Sewer Design8/10/2015 8/12/2015 PASS
DetailsKyle S. Rosenmeyer
Intake Approval  8/7/2015 PASS
planning land division has approved the review of the plans while parcel is still being recorded
Routing - PLANNING Land Div8/7/2015 8/7/2015 FAIL
DetailsDave Abo
Routing - Addressing8/7/2015 8/7/2015 FAIL
DetailsEmily Dixon
Needs parcel number, address shall be 10700 W Jewell Ln.
Intake Approval  7/27/2015 FAIL
Pending "Verification of Legal Lot or Parcel" before we can start review. Plat needs to be approved
Plans ACCEPTED BY PLAN TECH  7/27/2015 DONE
Recd Pcfee & Taken To Pln CK  7/27/2015 DONE
Intake Approval  7/23/2015 FAIL
First Notice 10/10/2016   
Application received 7/23/2015