Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-02575
StatusIssued
Name PRECISION STEEL & GYPSUM INC
Site Address 618 S 8TH ST
Project NameFoothills School
Customer Number 
ePlanReviewYes
Description
**(FOOTHILLS SCHOOL)** Permit is to remodel an existing 25,263 sq. ft. school building. Approval contingent upon adhering to the approved plans on file. Work to include: new installation of select interior non-bearing walls at classroom 113 and room 116 and new doors to help with sound control, reversing the door swing of the existing door at the hallway outside room 113, adding a new exit sign at room 116 above new door, and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered, Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/12/20161/12/20161/15/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection1/13/20161/13/20161/15/2016 PEND
DetailsDave Hannah
FIRE-Final Inspection8/28/20158/31/20158/31/2015PFAIL
DetailsJim Page
Newly installed door swings in the wrong direction, door needs to be reversed to have panick hardware in door going with the path of egress instead of against the path of egress.
Inspection Record Card- Bld  8/21/2015 DONE
BLD-Framing/Rough-in8/10/20158/10/20158/10/2015PPASS
DetailsJim Storey
Melissa Phone #: ###-####
Issue PAID IN FULL permit  8/10/2015 DONE
DetailsChristina Prado
Inspection Record Card- Bld  8/10/2015 DONE
DetailsChristina Prado
Permit Ready to Issue  8/3/2015 DONE
DetailsChristina Prado
Need GC & Revised Cert of value for issuance
Plan assigned to (JG)7/24/20157/24/20158/1/2015 PASS
DetailsJavier Guzman
7/30 Foothills School
Routing - PLAN CHECK7/24/2015 8/1/2015 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/1/2015 DONE
1st review completed  8/1/2015 DONE
DetailsJavier Guzman
Intake Approval  7/24/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please complete and upload the 304 form.
Intake Approval  7/24/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing7/24/2015 7/24/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS7/24/2015 7/24/2015 PASS
DetailsJennifer Bruner
Application received  7/23/2015 DONE
Application submitted via PDS Online on Jul 23 2015 5:00PM