BLD-Final | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Jim Storey
|
|
|
Call 30min before for access // Duane Phone #: ###-####
|
DOC - Permit Finaled | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | PASS |
Jim Sly
|
|
|
Wayne Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Jim Sly
|
|
|
would like call ahead; Dwayne Phone #: ###-####
|
BLD-Wall Bracing | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Jim Sly
|
|
|
Duane Phone #: ###-####
|
BLD-Foundation | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Jim Sly
|
|
|
Brian-late PM Phone #: ###-####
|
OVERRIDE | | | 7/28/2015 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 7/28/2015 | 7/28/2015 | 7/28/2015 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/28/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/28/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/28/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/28/2015 | | DONE |
|
|
|
|
Application received | | 7/28/2015 | | | |
|
|
|
|