Case Summary (BLD) | | | 9/16/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 9/16/2016 | | DONE |
|
|
|
|
BLD-Final | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Jim Sly
|
|
|
Vince Phone #: ###-####
|
DOC - Permit Finaled | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Framing/Rough-in | 1/13/2016 | 1/14/2016 | 1/14/2016 | A | NR |
Mike Jordan
|
|
|
Vince Phone #: ###-####. Mech. rough in inspection has failed.
|
BLD-Framing/Rough-in | 1/7/2016 | 1/8/2016 | 1/8/2016 | P | NR |
Phil Shearer
|
|
|
Walter Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/1/2015 | A | NR |
Phil Shearer
|
|
|
Walter Phone #: ###-####
|
BLD-Framing/Rough-in | 10/9/2015 | 10/12/2015 | 10/12/2015 | A | CANC |
Phil Shearer
|
|
|
Vince Phone #: ###-####
|
BLD-Wall Bracing | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | PASS |
Phil Shearer
|
|
|
Vince Phone #: ###-####
|
BLD-Foundation | 8/31/2015 | 9/1/2015 | 9/1/2015 | P | PASS |
Phil Shearer
|
|
|
Sabation Phone #: ###-####
|
BLD-Footing | 8/28/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Dave Hannah
|
|
|
Sebatian Phone #: ###-####
|
BLD-Footing | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | NR |
Phil Shearer
|
|
|
Vince Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/31/2015 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 7/29/2015 | 7/29/2015 | 7/30/2015 | A | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 7/29/2015 | 7/29/2015 | 7/30/2015 | | DONE |
Brian McGowan
|
|
|
Walk in addition
|
Routing - PLAN CHECK | 7/29/2015 | | 7/30/2015 | | PASS |
Brian McGowan
|
|
|
Prescriptive Energy Code provided with plans.
|
1st review completed | | | 7/30/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/30/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/30/2015 | | DONE |
|
|
|
all requirments met
|
Inspection Record Card- Bld | | | 7/30/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/30/2015 | | DONE |
|
|
|
called and let customer know that permit is ready and fees due
|
Routing Walk-In (Zoning) | 7/29/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Colleen T Carroll
|
|
|
Not to be used as an accessory dwelling unit.
|
Routing - MECHANICAL | 7/29/2015 | | 7/29/2015 | | PASS |
Troy James
|
|
|
|
Application received | | 7/29/2015 | | | |
|
|
|
|