Print Statement | | | 6/24/2016 | | DONE |
|
|
|
|
Second Notice | | 5/21/2016 | 6/15/2016 | | DONE |
|
|
|
|
First Notice | | 5/9/2016 | 5/11/2016 | | DONE |
|
|
|
Mailed 5-12-16
|
BLD-Final | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
FIRE-Final Inspection | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspections, exit signs/egress lighting/discharge landing lighting verfied, all operated correctly. Final life fire safety inspection passed/complete.
|
Permanent Occupancy | | | 4/29/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | FAIL |
Jim Page
|
|
|
Exit sign needs to be installed showing egress path of travel at small corridor between the main corridors, middle of building, same area is missing emergency egress light fixture, light needs to be installed. Exit sign in east storage by unit 2108 did not stay illuminated on emergency power, exit sign needs repaired. Discharge landing illumination needs to be tested/verified for proper operation , interior emergency lighting on these fixtures were operable when AC power source was isolated, multiple lights on discharge landings did not illuminate, inoperable discharge landing lights need to be repaired and operating at time of final inspection.
|
PubWorks Occupancy Approval | 4/28/2016 | 4/28/2016 | 4/28/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 4/25/2016 | 4/25/2016 | 4/25/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Energy code compliance | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2016 | 3/15/2016 | 3/16/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 3/3/2016 | 3/3/2016 | 3/3/2016 | A | PASS |
Dave Hannah
|
|
|
Shear // Bob Phone #: ###-####
|
BLD-Wall Bracing | 3/1/2016 | 3/2/2016 | 3/3/2016 | A | PASS |
Dave Hannah
|
|
|
Shear // Bob Phone #: ###-####
|
BLD-Wall cover | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Mike Jordan
|
|
|
for the roof // Bob Phone #: ###-####
|
BLD-Footing | 10/29/2015 | 10/30/2015 | 10/31/2015 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 10/28/2015 | 10/28/2015 | 10/29/2015 | P | CANC |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Footing | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 10/21/2015 | 10/21/2015 | 10/22/2015 | P | PASS |
Dave Hannah
|
|
|
stem wall; Bob Phone #: ###-####
|
BLD-Footing | 10/19/2015 | 10/19/2015 | 10/20/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
Print Occupancy Form | | | 9/28/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2015 | | DONE |
|
|
|
|
Routing PW Flood Plain | 9/18/2015 | | 9/21/2015 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/21/2015 | | DONE |
Christina Prado
|
|
|
Need ACHD for issuance
|
Plan assigned to (TLW) | 8/3/2015 | | 9/21/2015 | | PASS |
Tim L. Woodard
|
|
|
First review completed.
|
Routing Off Site - STRUCTURAL | 9/3/2015 | | 9/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 9/3/2015 | | 9/18/2015 | | PASS |
Jason C. Taylor
|
|
|
Approved in E-Plan. TLW
|
Routing PW Street Lights | 9/3/2015 | | 9/18/2015 | | PASS |
Mike D Hedge
|
|
|
Approved in E-Plan. TLW
|
Routing PW Flood Plain | 9/3/2015 | | 9/18/2015 | | FAIL |
Jim Wyllie
|
|
|
Failed in E-Plan. TLW
|
Plan resubmittals received | | | 9/18/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/18/2015 | | 9/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/3/2015 | | 9/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 9/3/2015 | | 9/10/2015 | | PASS |
Dave Abo
|
|
|
Parcel "A" of ROS 10210
|
Routing - PLANNING | 9/3/2015 | | 9/9/2015 | | PASS |
Cody Riddle
|
|
|
|
Routing - FIRE | 9/3/2015 | 9/3/2015 | 9/4/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Plan resubmittals received | | | 9/3/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/28/2015 | 8/31/2015 | 9/1/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Flood Plain | 8/3/2015 | | 8/28/2015 | | FAIL |
Jim Wyllie
|
|
|
|
Routing PW Geothermal | 8/3/2015 | | 8/28/2015 | | PASS |
Jon R. Gunnerson
|
|
|
|
1st review completed | | | 8/28/2015 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 8/3/2015 | | 8/28/2015 | | FAIL |
Dave Abo
|
|
|
|
Routing - PLAN CHECK | 8/3/2015 | | 8/28/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 8/3/2015 | | 8/28/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 8/3/2015 | | 8/28/2015 | | FAIL |
Mike D Hedge
|
|
|
|
Routing PW Drainage | 8/3/2015 | | 8/7/2015 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Routing PW Solid Waste | 8/3/2015 | | 8/7/2015 | | PASS |
Megan Durrell
|
|
|
Trash enclosure does not meet guidelines. Details not provided in eplan.
|
Routing PW Sewer Design | 8/3/2015 | | 8/6/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Show existing permanent sewer easement in drawing. Easement is 20' wide, offset 3.5' to the north of the center of pipe.
|
Routing - Design Review | 8/3/2015 | | 8/6/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 8/3/2015 | 8/3/2015 | 8/5/2015 | | FAIL |
Katie Marron
|
|
|
Comments attached to case and emailed to architect.
|
Routing - PLUMBING | 8/3/2015 | | 8/5/2015 | | PASS |
Daryl Spivey
|
|
|
|
Routing - PLANNING | 8/3/2015 | | 8/4/2015 | | FAIL |
Cody Riddle
|
|
|
CUP15-00006 required a floodplain development permit prior to building permit issuance.
|
Routing PW Sewer Rating | 8/3/2015 | | 8/4/2015 | | PASS |
Jennifer Bruner
|
|
|
No plumbing fixtures
|
Pending Assignment by TLW | 8/3/2015 | | 8/3/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 8/3/2015 | | 8/3/2015 | | PASS |
Emily Dixon
|
|
|
Buildings will all be addressed 1201 W River St.
|
Routing - PUBLIC WORKS | 8/3/2015 | | 8/3/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/3/2015 | | 8/3/2015 | | PASS |
Evan Jenkins
|
|
|
3 BLD Permits: Site Prep Inspection for Entire Site will occure with BLD15-02530) and Attached ESC Permit
|
Intake Approval | | | 7/31/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 7/29/2015 | | | |
|
|
|
|