BLD-Aging Inspection | 4/20/2016 | 4/20/2016 | 4/21/2016 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/19/2016 | 4/19/2016 | 4/21/2016 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 12/11/2015 | 12/14/2015 | 12/14/2015 | A | DONE |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
BLD-Footing | 12/4/2015 | 12/7/2015 | 12/7/2015 | P | PASS |
Dave Hannah
|
|
|
Pouring at 1:30 for loading dock, Kevin Phone #: ###-####
|
Plan assigned to (AJS) | 11/30/2015 | 11/30/2015 | 11/30/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 11/30/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Add under slab utilities and slab to scope of work. Contractor to submit revised project valuation and trade permits must be pulled and inspected prior to pouring of any concrete
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/30/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
DO NOT RE-ISSUE
|
Permit Ready to Issue | | | 11/30/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2015 | | DONE |
|
|
|
|
BLD-Conference | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PEND |
Dave Hannah
|
|
|
Kevin Phone #: ###-####east side soffit needs new struc. enginneering soffit not built as thought and is not struc sound enought for any addional loading.
|
CHANGE ISSUED DATE | | | 8/26/2015 | | DONE |
Rita DeYoung
|
|
|
|
Override - Parcel Holds | | | 8/26/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/26/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/3/2015 | | |
|
|
|
|
Plan assigned to (AJS) | | 7/29/2015 | 8/3/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Interior demo only Payette Brewing
|
Telephone call | | | 8/3/2015 | | DONE |
|
|
|
called applicant and notified him of the forms needed
|
Routing - PLAN CHECK | 8/3/2015 | | 8/3/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 8/3/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2015 | | DONE |
|
|
|
***ALL REQUIREMENTS MET*** needs Responsible Person, Revised Certificate of Value
|
1st review completed | | | 7/30/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 7/29/2015 | | 7/30/2015 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH15-00209.
|
Routing - PLAN CHECK | 7/30/2015 | | 7/30/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
called and spoke with architect. the engineering calculations show the 2009 IBC instead of the 2012 IBC. He will email me reivsed calculations.
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/29/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/29/2015 | | 7/29/2015 | | PASS |
Evan Jenkins
|
|
|
|
CHANGE STATUS TO (REV) | | | 7/29/2015 | | DONE |
|
|
|
interior demo, not exterior. further review is needed
|
Routing - PLANNING | 7/29/2015 | | 7/29/2015 | | PASS |
Cody Riddle
|
|
|
Cannot issue any permits until the floodplain development permit is issued.
After consulting with Public Works, demolition is okay to proceed.
|
First Notice | 4/20/2016 | 4/20/2016 | | | |
Dave Hannah
|
|
|
|
Application received | | 7/29/2015 | | | |
|
|
|
|