Permanent Occupancy | | | 10/13/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/7/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/21/2015 | 8/24/2015 | 8/24/2015 | P | PASS |
Mike Jordan
|
|
|
Vern Phone #: ###-####. Ok for perm occ.
|
Temporary Occupancy | 8/24/2015 | 11/22/2015 | 8/24/2015 | | DONE |
Kristal Soland
|
|
|
|
FIRE-Final Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PART |
Jim Page
|
|
|
Life fire safety inspection passed/complete (per Troy Cobbley- okay to final once fire permits have been signed off; partial ONLY)
|
BLD-Final | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | NR |
Mike Jordan
|
|
|
vern Phone #: ###-####
|
FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for corrections and their locations. They include the need of a sprinkler monitoring system (per original install drawings there are 164 sprinkler heads), emergency lighting is needed throughout, exit signs provided where shown on the plans, lower fire extinguishers in shop and remove the thumb turn dead bolt from the main exit.
|
Issue PAID IN FULL permit | | | 8/5/2015 | | DONE |
|
|
|
|
Routing - FIRE | 8/4/2015 | 8/4/2015 | 8/4/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Plan assigned to (CDM) | 7/29/2015 | 7/29/2015 | 8/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/30/2015 | | 8/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/4/2015 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/4/2015 | | 8/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 8/4/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/4/2015 | | DONE |
|
|
|
All requirements met
|
Print Occupancy Form | | | 8/4/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2015 | | DONE |
|
|
|
called applicant- told him permit is ready for pick up
|
Routing - PUBLIC WORKS | 7/29/2015 | | 7/30/2015 | | PASS |
Beverly Mountain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/29/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2015 | | DONE |
|
|
|
|
Routing - Addressing | 7/29/2015 | | 7/29/2015 | | PASS |
Emily Dixon
|
|
|
|
First Notice | | 10/23/2015 | | | |
|
|
|
|
Application received | | 7/29/2015 | | | |
|
|
|
|