PubWorks Occupancy Approval | 5/9/2016 | 5/9/2016 | 5/9/2016 | | DONE |
Jason C. Taylor
|
|
|
No Hillside inspection required. JCT
|
BLD-Conference | 5/3/2016 | 5/5/2016 | 5/5/2016 | A | PEND |
Dave Hannah
|
|
|
Overhead shade structure and deck Phone #: ###-#### Inspection requested via web by Sam Johnson needs hillside signoff and paperwork for wood used for deck ok from fire
|
BLD-Aging Inspection | 2/18/2016 | 2/18/2016 | 2/19/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/17/2016 | 2/17/2016 | 2/18/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 10/1/2015 | 10/1/2015 | 10/1/2015 | P | PART |
Tony Young
|
|
|
upper ftgs ok
|
BLD-Footing | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | PEND |
Tony Young
|
|
|
Ben Phone #: ###-####,, need soils report 1st
|
PubWorks Subgrade Approval | 9/30/2015 | 9/30/2015 | 9/30/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PART |
Tony Young
|
|
|
Ben Phone #: ###-####,, retaining wall,, work in progress,, ok
|
BLD-Footing | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Dave Hannah
|
|
|
A.M. inspection for footing and wall re bar. Phone #: ###-#### Inspection requested via web by Sam Johnson
|
BLD-Conference | 9/4/2015 | 9/8/2015 | 9/8/2015 | A | NR |
Tony Young
|
|
|
A.M. inspection for footing and wall re bar. Phone #: ###-#### Inspection requested via web by Sam Johnson
|
BLD-Footing | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | NR |
Mike Jordan
|
|
|
MTI compaction passed Phone #: ###-#### Inspection requested via web by Sam Johnson. Fotting is excavated, but no forms or rebar. Must rescheduke inspection when ready.
|
PubWorks Subgrade Approval | 8/31/2015 | 8/31/2015 | 8/31/2015 | | DONE |
Jason C. Taylor
|
|
|
***Lower Retaining Wall**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/7/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/7/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/6/2015 | | 8/7/2015 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/30/2015 | | 8/7/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 8/4; need eng sheets stamped
|
Plan resubmittals received | | | 8/6/2015 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | | | 8/4/2015 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 8/4/2015 | | FAIL |
|
|
|
|
Telephone call | | | 8/4/2015 | | DONE |
Tisha Gallop
|
|
|
called Sam Johnson/Idaho Landscape Solutions and left vm need engineer stamp on plans.
|
Routing Walk-In (PW Hillside) | 8/3/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | 7/30/2015 | | 7/30/2015 | | PASS |
Andy J. Long
|
|
|
Foothills home deck and retaining wall project; ESC plan waiver submitted and approved. Valid RP designated.
|
Plans ACCEPTED BY PLAN TECH | | | 7/30/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/30/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 7/29/2015 | | | |
|
|
|
|