BLD-Final | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Jim Sly
|
|
|
Roz-please call 15 mintues prior to meet Phone #: ###-####
|
DOC - Permit Finaled | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | NR |
Jim Sly
|
|
|
would like call ahead; Roz Phone #: ###-#### Need to complete sheetrock on house/Garage wall......Up to roof deck. Firestop 2" pvc pipe thru same wall. Fix crack at W. and E. ends of same wall.
|
BLD-Framing/Rough-in | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Jim Sly
|
|
|
Roz// please call before Phone #: ###-####
|
BLD-Foundation | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Jim Sly
|
|
|
Jeremy// pleases call before Phone #: ###-#### Mono pour .......OK
|
Telephone call | | | 8/5/2015 | | DONE |
Tisha Gallop
|
|
|
received phone call from Roz Story (homeowner) changing garage door width to 8 feet instead of 9 feet. Told her not need to come in for that change, it does not affect any structural changes. The wall bracing and header still remain the same because of the portal frame.
|
OVERRIDE | | | 7/30/2015 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/30/2015 | 7/30/2015 | 7/30/2015 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/30/2015 | 7/30/2015 | 7/30/2015 | A | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 7/30/2015 | | 7/30/2015 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/30/2015 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2015 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2015 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 7/30/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/30/2015 | | DONE |
|
|
|
|
Application received | | 7/30/2015 | | | |
|
|
|
|