Third Notice | | 6/15/2016 | 6/28/2016 | | DONE |
|
|
|
This permit finaled on the web by David Moorhouse
|
Third Notice | | 5/16/2016 | 6/10/2016 | | DONE |
|
|
|
|
Second Notice | | 4/22/2016 | 5/11/2016 | | DONE |
|
|
|
mailed 5-12-16
|
First Notice | | 3/20/2016 | 4/12/2016 | | DONE |
|
|
|
sent in mail 4-13-16
|
Permanent Occupancy | | | 3/10/2016 | | DONE |
|
|
|
|
BLD-Final | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Mike Jordan
|
|
|
Could you please call me to meet.
Thanks, Drew 208 ###-#### Phone #: ###-#### Inspection requested via web by David Moorhouse. OK for perm occ. ADA counter provided, shower has been capped off above ceiling and controls and shower head removed.
|
BLD-Final | 3/4/2016 | 3/4/2016 | 3/4/2016 | P | PART |
Mike Jordan
|
|
|
Requesting a final for this afternoon. Please call and I will meet you their. 208 ###-#### Thank you Drew Phone #: ###-#### Inspection requested via web by David Moorhouse. Provide ADA accessible counter, shower provided is not ADA compliant. Contractor has noted that they will cap off water supply and remove control valve and head.
|
FIRE-Final Inspection | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarms, fire extinguishers have current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Mike Jordan
|
|
|
Grid Inspection Please
Thanks, Drew 208 ###-#### Phone #: ###-#### Inspection requested via web by David Moorhouse. ceiling grid ok. Needs to provide listed dampers at ceiling menmbrane and wall at med gas room.
|
BLD-Ceiling Grid Inspection | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | NR |
Mike Jordan
|
|
|
Drew Phone #: ###-####. Needs MEP's rough in inspections first.
|
BLD-Framing/Rough-in | 12/31/2015 | 12/31/2015 | 12/31/2015 | A | PART |
Mike Jordan
|
|
|
Interior wood framed walls ok. Need to provide framing for 1hr. lid in gas room.
|
Print Occupancy Form | | | 10/14/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/14/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/22/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 8/5/2015 | 8/5/2015 | 9/22/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed 9/1Level 3 TI - ePlanReview - Emerald West Family Dentistry
|
Routing - PLAN CHECK | 9/22/2015 | | 9/22/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/22/2015 | | DONE |
|
|
|
need ACHD payment or paid receipt from ACHD, RP, GC & rev cert of val
|
Routing - PLUMBING | 9/10/2015 | | 9/15/2015 | | PASS |
Bill VanDegrift
|
|
|
branched med gas system prohibited below slab
|
Routing - PUBLIC WORKS | 9/14/2015 | | 9/14/2015 | | PASS |
Jennifer Bruner
|
|
|
added Hi/Low drinking fountain at resubmittal.
|
Routing - PLAN CHECK | 9/10/2015 | | 9/14/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Environmental | 8/5/2015 | | 8/26/2015 | | PASS |
Rick Christenson
|
|
|
Must submit application for coverage under City Dental BMP. Contact ###-#### or ###-####.
|
1st review completed | | | 8/26/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/5/2015 | | 8/26/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 8/5/2015 | 8/5/2015 | 8/11/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Sewer Rating | 8/5/2015 | | 8/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 8/5/2015 | | 8/5/2015 | | PASS |
Emily Dixon
|
|
|
Suite 150 added.
|
Routing - PUBLIC WORKS | 8/5/2015 | | 8/5/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 8/5/2015 | | 8/5/2015 | | PASS |
Evan Jenkins
|
|
|
(EMERALD WEST FAMILY DENISTRY) Remodel for a new dental office tenant within a 5,877 sq. ft. space in existing building per approved plans. Work includes interior only saw cutting for new plumbing and water. No exterior work will occur.
Waiver Approved
|
Pending Assignment by JCB | 8/5/2015 | | 8/5/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 8/3/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Application received | | | 7/30/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 30 2015 2:20PM
|
Routing - PLUMBING | 8/5/2015 | | | | FAIL |
Bill VanDegrift
|
|
|
1) indirect waste receptors must be exposed
2) increase venting to 12.56 inches
3) additional cross connection protection may be required
4) NFPA 99C--5.3.10.10.5.1(a) medical gas piping shall be permitted to be installed in the overhead wherever possible.
NFPA 99C--5.3.10.10.7.1 the tube(s) shall be installed in one or more continuous conduits that are of sufficient size to permit subsequent installation, removal and replacement of the gas and or vacuum lines.
NFPA99C--5.3.10.10.7.2-- Each tube pulled into the conduit shall be continuous having no joints within the conduit.
resubmit addressing item #4
|