BLD-Final | 8/20/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Mike Jordan
|
|
|
would like call ahead; Jerry Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | FAIL |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Install all lateral bracing as per truss engineering. Gable end trus shows continous bearing. Provide fix from truss engineer for gable end truss, for T01 trus with beam connection to bottom chord. Also provide addtional 2x on existing roof at overbuild (sleeper)
|
BLD-Footing | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Mike Jordan
|
|
|
Please use side gate to avoid dogs - Jerry Phone #: ###-####
|
Routing Walk-In (Zoning) | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
Sue Cummings
|
|
|
The 25 foot set back in the rear yard is O.K. per Scott Spjute, 8/03/2015. The subdivision was built inder the R8 Zone in the county, and the 25 foot setback was used in the design of the subdivision. B.P.E.
|
Routing Walk-In (BLD) | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 7/31/2015 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2015 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 7/31/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/31/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/31/2015 | | DONE |
|
|
|
|
Application received | | 7/31/2015 | | | |
|
|
|
|