Permit Information
Permit NumberBLD15-02722
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 1789 S BROADWAY AVE Unit: 100
Project NameDirect Orthopedic Care
Customer NumberBLD15-02948, BLD15-02949
ePlanReviewNo
Description
(DIRECT ORTHOPEDIC CARE)(SUITE100) Remodel for a new medical office tenant within an existing 1,793 sq. ft. office space per approved plans. Work to include interior demolition, new exterior accessible parking and route, new interior walls and doors, new lead lined x-ray room, structural roof modifications to support two new HVAC roof top units with structural modifications per plans and calculations, new suspended ceiling work, plumbing work, mechanical work, and electrical work. Please contact the electrical inspection division for NOTE: This building is NOT fire sprinklered. New imaging equipment shall meet NEC requirements. Please contact the City of Boise electrical divisions for requirements for the new equipment. All new interior finish shall meet IBC chapter 8 requirements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/19/201511/11/2015 DONE
This permit finaled on the web by Shawn Metier
First Notice 11/6/201511/9/2015 DONE
Mailed 11-10-15
Zoning Approval10/27/201510/27/201510/27/2015 DONE
DetailsAndrea Tuning
No Zoning Approval.
Permanent Occupancy  10/27/2015 DONE
BLD-Final10/23/201510/26/201510/26/2015PPASS
DetailsJim Storey
John Phone #: ###-#### ok pending p&z
FIRE-Final Inspection10/23/201510/26/201510/26/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Ceiling Grid Inspection10/15/201510/16/201510/16/2015PPASS
DetailsJim Storey
John Phone #: ###-####
BLD-Framing/Rough-in9/24/20159/25/20159/25/2015PPASS
DetailsJim Storey
Framing inspection for cover John Saucerman Phone #: ###-#### Inspection requested via web by Shane Treasure
Place hold on job8/28/2015 8/31/2015 DONE
DetailsBrittany Hill
DO NOT ISSUE WITHOUT BLD15-02949 AND BLD15-02948
Issue PAID IN FULL permit  8/31/2015 DONE
OVERRIDE  8/26/2015  
Plan assigned to (AJS)8/4/20158/4/20158/26/2015 PASS
DetailsAdele J Schaffeld-Griffin
My Review completed 8/31Level 3 TI - Paper - Direct Orthopedic Care
Routing - PLAN CHECK8/25/2015 8/26/2015 PASS
DetailsAdele J Schaffeld-Griffin
Print Occupancy Form  8/26/2015 DONE
Telephone call  8/26/2015 DONE
called Ross- told him permit is ready for pick up and that we still need GC form, RP, and certificate of value before final fees can be added
Plan Reviewer's activity  8/26/2015 DONE
DetailsAdele J Schaffeld-Griffin
Called Ross, I need to review to exit door hardware, his response note that a site visit was made and it appears to meet code does not porivde me with the information I need to complete a review. He will email me the door hardware information.
Case Summary (BLD)  8/26/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/26/2015 DONE
Permit Ready to Issue  8/26/2015 DONE
DetailsChristina Prado
NEED RP, GC AND REVISED CERT OF VALUE///All requirements met
Plan resubmittals received  8/25/2015  
received (2) copies of plans; (A800) Door Schedule, (E3.2) Electrical Plan, Floor Area diagram
1st review completed  8/21/2015 FAIL
Failed plan check
Routing - FIRE8/20/2015 8/21/2015 PASS
DetailsScott Arellano
Comments attached to plans
Routing - PLAN CHECK8/6/2015 8/20/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Plan Reviewer's activity  8/19/2015 DONE
DetailsAdele J Schaffeld-Griffin
email sent to applicant 8/19/15

Ross, This project is a change in office use from standard office to medical office for suite 100. Please contact ACHD in regards to impact fees. If no additional fees will be required please submit that information in writing (an email from them will work). If additional fees will be required they will need to be paid prior to the permit being issues.

Thank you

Adele Schaffeld-Griffin
Plans Examiner II
Planning and Development Services
City of Boise
###-####

Routing - Design Review8/5/2015 8/6/2015 PASS
DetailsSarah Schafer
Sarah Schafer - Exterior site alterations for accessible parking spaces & route

Approved minor site modifications through the building permit.
Routing - PLUMBING8/5/2015 8/5/2015 PASS
DetailsBill VanDegrift
RPBP not required in this location for plumbing.
Routing - Erosion and Sediment8/4/2015 8/5/2015 PASS
DetailsEvan Jenkins
(DIRECT ORTHOPEDIC CARE)(SUITE???) Remodel for a new medical office tenant within an existing 1,793 sq. ft. space per approved plans. Work to include interior demolition, new exterior accessible parking and route, new interior walls and doors, new lead lined x-ray room, structural roof modifications to support two new HVAC roof top units, new suspended ceiling work, plumbing work, mechanical work, and electrical work.
Plan Reviewer's activity  8/4/2015 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
Routing - Addressing8/4/2015 8/4/2015 PASS
DetailsEmily Dixon
Suite 100, 110, & 120 added.
Routing - PUBLIC WORKS8/4/2015 8/4/2015 PASS
DetailsJennifer Bruner
Pending Assignment by JCB8/3/2015 8/4/2015 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  8/3/2015 DONE
Recd Pcfee & Taken To Pln CK  8/3/2015 DONE
Intake Approval  8/3/2015 PASS
DetailsCarl D Madsen
Application received 8/3/2015