Second Notice | | 11/19/2015 | 11/11/2015 | | DONE |
|
|
|
This permit finaled on the web by Shawn Metier
|
First Notice | | 11/6/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
Zoning Approval | 10/27/2015 | 10/27/2015 | 10/27/2015 | | DONE |
Andrea Tuning
|
|
|
No Zoning Approval.
|
Permanent Occupancy | | | 10/27/2015 | | DONE |
|
|
|
|
BLD-Final | 10/23/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### ok pending p&z
|
FIRE-Final Inspection | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Ceiling Grid Inspection | 10/15/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Jim Storey
|
|
|
Framing inspection for cover John Saucerman Phone #: ###-#### Inspection requested via web by Shane Treasure
|
Place hold on job | 8/28/2015 | | 8/31/2015 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSUE WITHOUT BLD15-02949 AND BLD15-02948
|
Issue PAID IN FULL permit | | | 8/31/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/26/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 8/4/2015 | 8/4/2015 | 8/26/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
My Review completed 8/31Level 3 TI - Paper - Direct Orthopedic Care
|
Routing - PLAN CHECK | 8/25/2015 | | 8/26/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Print Occupancy Form | | | 8/26/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/26/2015 | | DONE |
|
|
|
called Ross- told him permit is ready for pick up and that we still need GC form, RP, and certificate of value before final fees can be added
|
Plan Reviewer's activity | | | 8/26/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Called Ross, I need to review to exit door hardware, his response note that a site visit was made and it appears to meet code does not porivde me with the information I need to complete a review. He will email me the door hardware information.
|
Case Summary (BLD) | | | 8/26/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/26/2015 | | DONE |
Christina Prado
|
|
|
NEED RP, GC AND REVISED CERT OF VALUE///All requirements met
|
Plan resubmittals received | | | 8/25/2015 | | |
|
|
|
received (2) copies of plans; (A800) Door Schedule, (E3.2) Electrical Plan, Floor Area diagram
|
1st review completed | | | 8/21/2015 | | FAIL |
|
|
|
Failed plan check
|
Routing - FIRE | 8/20/2015 | | 8/21/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to plans
|
Routing - PLAN CHECK | 8/6/2015 | | 8/20/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 8/19/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
email sent to applicant 8/19/15
Ross, This project is a change in office use from standard office to medical office for suite 100. Please contact ACHD in regards to impact fees. If no additional fees will be required please submit that information in writing (an email from them will work). If additional fees will be required they will need to be paid prior to the permit being issues.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
Planning and Development Services
City of Boise
###-####
|
Routing - Design Review | 8/5/2015 | | 8/6/2015 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - Exterior site alterations for accessible parking spaces & route
Approved minor site modifications through the building permit.
|
Routing - PLUMBING | 8/5/2015 | | 8/5/2015 | | PASS |
Bill VanDegrift
|
|
|
RPBP not required in this location for plumbing.
|
Routing - Erosion and Sediment | 8/4/2015 | | 8/5/2015 | | PASS |
Evan Jenkins
|
|
|
(DIRECT ORTHOPEDIC CARE)(SUITE???) Remodel for a new medical office tenant within an existing 1,793 sq. ft. space per approved plans. Work to include interior demolition, new exterior accessible parking and route, new interior walls and doors, new lead lined x-ray room, structural roof modifications to support two new HVAC roof top units, new suspended ceiling work, plumbing work, mechanical work, and electrical work.
|
Plan Reviewer's activity | | | 8/4/2015 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 8/4/2015 | | 8/4/2015 | | PASS |
Emily Dixon
|
|
|
Suite 100, 110, & 120 added.
|
Routing - PUBLIC WORKS | 8/4/2015 | | 8/4/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Pending Assignment by JCB | 8/3/2015 | | 8/4/2015 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/3/2015 | | DONE |
|
|
|
|
Intake Approval | | | 8/3/2015 | | PASS |
Carl D Madsen
|
|
|
|
Application received | | 8/3/2015 | | | |
|
|
|
|