Permit Information
Permit NumberBLD15-02730
StatusFinaled
Name BENCHMARK CONSTRUCTION INC
Site Address 9543 W EMERALD ST
Project NameEmerald Building
Customer Number 
ePlanReviewYes
Description
(EMERALD BUILDING ELEVATOR ADDITION) The fire sprinkler system is used for fire area, building area, and for story increase. To construct a 213 square foot elevator addition (160 sq. ft. 1st story and 53 sq. ft. 2nd story) to provide an accessible route to serve potentially about 6,516 square feet of the existing 7,939 square foot 2nd story. The elevator will not be available to serve about 1,423 square feet or more of the 2nd story. This building has a total floor area of about 22,169 square feet (13,791 square foot 1st story and 8,378 square foot 2nd story). Work is to include concrete footings, concrete foundations, masonry walls, masonry columns, wood floor joists, wood roof joists, wood floor and roof sheathing, wood stud walls with wood sheathing, interior nonbearing walls, changing a shower room to a toilet room accessible to the disabled, suspended acoustical ceilings, a relocated door, and relocated windows. Special Inspection is required for soils, concrete, masonry, and for wood shear elements. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. A separate fire sprinkler permit shall be obtained prior to beginning any modification or installation work on such system. This permit does NOT establish a Certificate of Occupancy for any tenant. This is a shell permit only. Each tenant is required to apply for and receive their own Certificate of Occupancy before occupancy. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  6/19/2017 DONE
DetailsAdele J Schaffeld-Griffin
Building, Fire, Planning and all trade permits finaled, no cof o issed.
BLD-Final3/11/20163/14/20163/14/2016APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Ok for perm occ.
Zoning Approval3/10/20163/10/20163/10/2016 DONE
DetailsAndrea Tuning
BLD-Final3/3/20163/4/20163/4/2016ANR
DetailsMike Jordan
Call prior to going Phone #: 7942509 >> Inspection requested via mobile web by Clayn. Needs zoning final. Only need to inspect upstairs restroom for ADA compliance. Everything else ok.
Zoning Approval3/4/20163/4/20163/4/2016 PASS
DetailsJosh Wilson
FIRE-Final Inspection3/2/20163/3/20163/3/2016APASS
DetailsJim Page
Previously noted items repaired. Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers have current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Final Inspection3/1/20163/2/20163/2/2016PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit finaled, remove the exit sign directing people to the elevator, repair the non-functional exit signs/emergency lights, provide additional signage for the elevator on the second floor.
BLD-Energy code compliance12/15/201512/15/201512/15/2015PPASS
DetailsJim Sly
As late as possible Phone #: 7942509 >> Inspection requested via mobile web by Clayn
BLD-Framing/Rough-in12/15/201512/15/201512/15/2015PPASS
DetailsJim Sly
As late as possible Phone #: 7942509 >> Inspection requested via mobile web by Clayn
BLD-Conference12/3/201512/3/201512/3/2015PCANC
DetailsMike Jordan
As late as possible Phone #: 7942509 >> Inspection requested via mobile web by Clayn
BLD-Framing/Rough-in12/3/201512/3/201512/3/2015PPASS
DetailsMike Jordan
As late as possible Phone #: 7942509 >> Inspection requested via mobile web by Clayn
BLD-Conference12/1/201512/1/201512/1/2015PCANC
DetailsMike Jordan
Phone #: 7942509 >> Inspection requested via mobile web by Clayn
BLD-Framing/Rough-in12/1/201512/1/201512/1/2015PPASS
DetailsMike Jordan
Phone #: 7942509 >> Inspection requested via mobile web by Clayn. upeer and lower roof framing. Will also get RFI for relocating the upper straps.
BLD-Other11/12/201511/12/201511/12/2015PDEFR
DetailsMike Jordan
We plan on grouting at 2:30pm. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Specil inspector on site.
BLD-Other11/6/201511/9/201511/9/2015APASS
DetailsPhil Shearer
As early as possible Phone #: 7942509 >> Inspection requested via mobile web by Clayn. 0'-8' First lift
BLD-Other11/6/201511/6/201511/6/2015PPART
DetailsMike Jordan
Block/Pre-grout/rebar inspection for 1st 8''. Grout is Monday morning at 8:30am. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Work in progress, 0 to 8ft. elevation. High lift, cleanouts ok. PLacing grout monday morning. Special inspector will be on site.
BLD-Conference11/2/201511/3/201511/3/2015PPART
DetailsMike Jordan
I have the engineers letter approving #5 bar as installed in lieu of the #6 bar specified. We will be trying to pour sometime Tuesday afternoon. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Reviewed engineers RFI. Pending special inspection. work was in progress.
BLD-Conference11/2/201511/2/201511/2/2015PNR
DetailsMike Jordan
Mike,

We anticipate having something from the engineer this morning on the rebar. We would still like to pour the walls this afternoon, if possible. With the engineer''s.response, do we still need MTI for rebar inspection? Do we need MTI for cylinders? What is the best email to send your the engineer"s response?
Thanks Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. No response from engineer of record for in place work or repair.
BLD-Conference10/29/201510/30/201510/30/2015PCANC
DetailsMike Jordan
Please call first. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
BLD-Foundation10/30/201510/30/201510/30/2015PFAIL
DetailsMike Jordan
Please call first. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Provide the missing #6 verts a shown on approved plans, the required horizontal bars with the 180 degree hooks. provide RFI from engineer of record for fix.
BLD-Footing10/27/201510/27/201510/27/2015PPASS
DetailsMike Jordan
BLD-Conference10/26/201510/27/201510/27/2015ADONE
DetailsMike Jordan
Call prior to going Phone #: 2087942509 >> Inspection requested via mobile web by Clayn
Telephone call  10/8/2015 DONE
emailed Dianne about a check we received. The fees have already been paid so as per the request of Tammy Cox I shredded the check and sent her a copy of the for check for her records
Issue PAID IN FULL permit  10/7/2015 DONE
OVERRIDE  9/18/2015  
Plan assigned to (CJW)8/5/20158/5/20159/18/2015 PASS
DetailsCarl Westfall
EMERALD BUILDING ELEVATOR ADDITION (Aug. 24 - 15 days) Level 3 TI - ePlanReview
Routing - PLAN CHECK9/11/2015 9/18/2015 PASS
DetailsCarl Westfall
(9-12-15) Issues resolved except for structural

(9-18-15) Approved by Structural
PLANS/APPL TAKEN TO FRONT DESK  9/18/2015 DONE
Permit Ready to Issue  9/18/2015 DONE
DetailsChristina Prado
**ALL REQUIREMENTS MET AS OF 9-28-15//cdp
Need ACHD, RP, GC & Revised cert of value for issuance--- ONLY NEED ACHD as of 9-22-15- emailed Clayn fees due and let him know we still need ACHD--- KRS
Routing Off Site - STRUCTURAL9/12/2015 9/17/2015 PASS
DetailsCarl Westfall
Dave Haugland
Routing - Design Review9/12/2015 9/15/2015 PASS
DetailsAndrea Tuning
Plan resubmittals received  9/11/2015 DONE
Route to Impact Fee Review9/1/20159/4/20159/8/2015 PASS
DetailsCindy M. Gould
1st review completed  9/1/2015 DONE
Plan resubmittals requested  9/1/2015 DONE
Routing - PLAN CHECK8/5/2015 9/1/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL8/5/2015 8/13/2015 FAIL
DetailsCarl Westfall
Dave Haugland
Routing - FIRE8/5/20158/5/20158/10/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing - Design Review8/5/2015 8/5/2015 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC10-00171
Routing - Addressing8/5/2015 8/5/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/5/2015 8/5/2015 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment8/5/2015 8/5/2015 PASS
DetailsEvan Jenkins
(EMERALD BUILDING ELEVATOR ADDITION) New exterior elevator addition, interior lobby remodel work, new lighting, HVAC diffuser relocation, extend fire sprinklers. 187 SF of Disturbance from construction activity
Plan Reviewer's activity  8/5/2015 DONE
DetailsJason Blais
Emailed architect to contact ACHD to evaluate if any additional impact fees are due. Our Permit Counter will need written verification from ACHD prior to the building permit being issued.
Routing Off Site - STRUCTURAL8/5/2015 8/5/2015 DONE
DetailsKristal Soland
Per JCB- routed to AHJ Engineers for outside structural review
Pending Assignment by JCB8/5/2015 8/5/2015 DONE
DetailsJason Blais
Intake Approval  8/4/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Application received  8/3/2015 DONE
Application submitted via PDS Online on Aug 3 2015 5:05PM