Permit Information
Permit NumberBLD15-02732
StatusFinaled
Name HC COMPANY INC
Site Address 11321 W CHINDEN BLVD
Project NameBuilding 2-3 Link: T.I.
Customer Number 
ePlanReviewYes
Description
(HP – Bldg 2 & 3 link –) Permit is to remodel to an existing office area. Work to include: removal of select nonbearing walls, construction of new select nonbearing walls to make the corridor smaller with a door, create a smaller room, create an open room area with new exterior exit door, relocation of lighting fixtures, repairing existing grid ceiling, minor mechanical ductwork in the ceiling, minor plumbing work in the ceiling and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/19/201511/16/2015 DONE
This permit finaled on the web by Jeff Tonkin
First Notice10/16/201510/16/201511/9/2015 DONE
DetailsJim Sly
Mailed 11-10-15
BLD-Final10/16/201510/16/201510/16/2015PPASS
DetailsJim Sly
Jason Phone #: ###-####
DOC - Permit Finaled10/16/201510/16/201510/16/2015PPASS
DetailsJim Sly
FIRE-Final Inspection10/16/201510/16/201510/16/2015PPASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in8/21/20158/21/20158/21/2015PPASS
DetailsJim Sly
Jason Phone #: ###-####
Issue PAID IN FULL permit  8/20/2015 DONE
Inspection Record Card- Bld  8/20/2015 DONE
Plan assigned to (JG)8/11/20158/11/20158/19/2015 PASS
DetailsJavier Guzman
8/24 HP Building 2 and 3
Routing - PLAN CHECK8/11/2015 8/19/2015 PASS
DetailsJavier Guzman
1st review completed  8/19/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/19/2015 DONE
Permit Ready to Issue  8/19/2015 DONE
needs Revised certificate of value and GC Form ****ALL REQUIRMENTS MET 8-19-15 ///CEV
Intake Approval  8/11/2015 FAIL
DetailsAdele J Schaffeld-Griffin
The 304 form is uploaded and signed, however none of the drawing sheets are signed and stamped. Please stamp and sign the drawings.
Intake Approval  8/11/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing8/11/2015 8/11/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/11/2015 8/11/2015 PASS
DetailsBeverly Mountain
Application received  8/4/2015 DONE
Application submitted via PDS Online on Aug 4 2015 12:23AM