Permit Information
Permit NumberBLD15-02760
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 133 S BROADWAY AVE
Project NameCafe Zupas
Customer Number 
ePlanReviewYes
Description
(CAFE ZUPAS) This permit can NOT be finaled until BLD15-01964 is finaled. Permit for Interior remodel for a new 3,492 sq. ft. assembly restaurant tenant within an existing building per approved plans. Work to include new commercial kitchen and associated mechanical equipment, new Root top units, new ADA restrooms, ceiling systems, new electrical and lighting, new plumbing, exterior modifications to the facade. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/21/20162/26/2016 DONE
This permit finaled on the web by Tara May
First Notice 2/5/20162/11/2016 DONE
mailed 2-12-16
Permanent Occupancy  1/26/2016 DONE
Temporary Occupancy12/1/20152/29/201612/1/2015 DONE
DetailsChristina Prado
BLD-Final11/19/201511/20/201511/20/2015PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Scott Stimpson perm final ok pending pw sign off
FIRE-Final Inspection11/19/201511/20/201511/20/2015APASS
DetailsJim Page
FIR permit inspection for fire sprinklers complete, FIR permit inspection for fire alarms complete. Life fire safety inspection passed/complete.
FIRE-Alarm Testing11/19/201511/19/201511/19/2015ACANC
DetailsJim Page
Spoke to point of contact, Scott phone number ###-####, informed him that core/shell FIR permits for alarms and fire sprinklers need to be completed before final inspection. FIR permits for fire alarms and fire sprinklers need to be complete for tenant space before final life fire safety inspection can be completed. This inspection cancelled and will be scheduled for a later date.
FIRE-Final Inspection11/19/201511/19/201511/19/2015ACANC
DetailsJim Page
Spoke to point of contact, Scott phone number ###-####, informed him that core/shell FIR permits for alarms and fire sprinklers need to be completed before final inspection. FIR permits for fire alarms and fire sprinklers need to be complete for tenant space before final life fire safety inspection can be completed. This inspection cancelled and will be scheduled for a later date.
PubWorks Temp Occupancy Appr11/19/201511/19/201511/19/2015 DONE
DetailsTiffany Lowery
Zoning Approval11/19/201511/19/201511/19/2015 PASS
DetailsJosh Wilson
BLD-Conference11/18/201511/18/201511/18/2015PDONE
DetailsDave Hannah
Ryan Phone #: ###-####
Print Occupancy Form  11/16/2015 DONE
BLD-Ceiling Grid Inspection11/6/201511/6/201511/6/2015PPASS
DetailsDave Hannah
Ryan Phone #: ###-####
Override - Parcel Holds11/6/20151/1/190011/6/2015  
does not apply to this permit
BLD-Ceiling Grid Inspection10/30/201510/30/201511/2/2015PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Scott Stimpson
BLD-Ceiling Grid Inspection11/2/201511/2/201511/2/2015APEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Scott Stimpson
BLD-Ceiling Grid Inspection10/29/201510/30/201510/30/2015AFAIL
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Scott Stimpson
BLD-Framing/Rough-in10/7/201510/8/201510/8/2015PPASS
DetailsDave Hannah
This is for the restrooms and hallway hard lids and soffit framing. Phone #: ###-#### Inspection requested via web by Scott Stimpson
BLD-Framing/Rough-in9/30/201510/2/201510/6/2015PPASS
DetailsDave Hannah
interior partial framing. Phone #: ###-#### Inspection requested via web by Scott Stimpson
BLD-Framing/Rough-in9/23/20159/24/20159/24/2015APART
DetailsJim Sly
Scott Phone #: ###-####
Exterior pop out wall for menu board at front entry.......OK.
OVERRIDE  9/14/2015  
Plan assigned to (AJS)8/7/20158/7/20159/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 3 TI - ePlanReview - Cafe Zupas
Issue PAID IN FULL permit  9/14/2015 DONE
Print Occupancy Form  9/14/2015 DONE
Routing - PLAN CHECK9/10/2015 9/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  9/14/2015 DONE
Permit Ready to Issue  9/14/2015 DONE
***all requirments met 9-14-15//CEV NEED RP, GC form, and Certificate of Value
1st review completed  9/3/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK8/7/2015 9/3/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - C.D.H8/7/2015 8/27/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Environmental8/10/2015 8/14/2015 PASS
DetailsRick Christenson
Need verification on size of grease interceptor and verifiy working condition.
Routing - MECHANICAL8/7/2015 8/14/2015 PASS
DetailsTroy James
Routing - FIRE8/7/20158/7/20158/12/2015 PASS
DetailsScott Arellano
Attached comments and conditions of approval to plans.
Plan Reviewer's activity  8/11/2015 DONE
DetailsJason Blais
No ACHD impact fees or inspection required per email from Austin Miller at ACHD:

Jamin and Lou,

Thank you for your help. With regard to the Café Zupas TI at 111 S. Broadway, there is No Impact Fee Due and an ACHD inspection is not required.

Thank you,

Austin Miller
Ada County Highway District
Planner I, Development Services
3775 Adams Street, Garden City, ID 83714
Phone: ###-####
E-mail: Amiller@achdidaho.org
Routing - Addressing8/7/2015 8/11/2015 PASS
DetailsEmily Dixon
Address corrected to 133 S Broadway Ave.
Routing - PUBLIC WORKS8/7/2015 8/10/2015 PASS
DetailsBeverly Mountain
Routing - PLUMBING8/7/2015 8/10/2015 PASS
DetailsBill VanDegrift
1) vent over length trap arms
2) use island sink venting not AAV
3) additional cross connection protection may be required
4) use trap primers not proseal etc.
5) mixing valves at hand sinks and public lavs must be ASSE 1070
6) RP required upstream of the filtered water systems
Routing PW Sewer Rating8/10/2015 8/10/2015 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment8/7/2015 8/10/2015 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Need to designate RP on permit.
Routing - Design Review8/7/2015 8/10/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00244
Plan Reviewer's activity  8/7/2015 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD to determine if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
Intake Approval  8/7/2015 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Pending Assignment by JCB8/7/2015 8/7/2015 DONE
DetailsJason Blais
Intake Approval  8/6/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please see check list for the additional items needed.
This project will route as a major TI.
Application received  8/5/2015 DONE
Application submitted via PDS Online on Aug 5 2015 10:34AM