Third Notice | | 5/15/2017 | 5/24/2017 | | DONE |
|
|
|
This permit finaled on the web by Jackie Phelps
|
Second Notice | | 4/21/2017 | 5/10/2017 | | DONE |
|
|
|
sent in mail 5-11-17
|
First Notice | | 3/31/2017 | 4/11/2017 | | DONE |
|
|
|
sent in mail 4-12-17
|
Permanent Occupancy | | | 3/21/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed per Scott Arellano
|
BLD-Final | 3/17/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### final ok
|
BLD-Final | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | NR |
Jim Sly
|
|
|
Tom Phone #: ###-#### Need to verify that ACHD has been finaled. Need Fire alarm, Fire sprinkler and Fire/ Life safety Finals, To obtain C of O.
|
BLD-Final | 2/16/2017 | 2/16/2017 | 2/16/2017 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### final ok
|
BLD-Aging Inspection | 2/14/2017 | 2/14/2017 | 2/15/2017 | | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 12/5/2016 | 2/7/2017 | 2/7/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### temp ok/ glazing at 3/4 hr doors
|
Temporary Occupancy | 12/16/2016 | 3/16/2017 | 12/16/2016 | | DONE |
Candy A. Nichols
|
|
|
pending final ele, mech, fire & structural
|
FIRE-Final Inspection | 12/14/2016 | 12/15/2016 | 12/15/2016 | P | PART |
Jim Page
|
|
|
Partial life fire safety inspection complete for TCO, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, emergency lighting including exit discharge has been inspected, knox box is in place. Fuel island is still under construction, fuel island is under this permit and will be inspected when completed. Paint booth is to be built at a later date, paint booth has an FIR permit associated with the fire sprinklers that will remain in issued status until paint booth is complete (FIR16-00716) Exit sign that is in place for the paint shop exit is temporary, permanent exit sign for this area is on order, will verify install at a later date. Fire hydrants located on the northwest and southwestside of compound will need to be rotated so the large discharge is not pointing at bollards, fire hydrant rotation will be verified during permanet CO inspection.
|
Zoning Approval | 12/12/2016 | 12/12/2016 | 12/12/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Other | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Jim Storey
|
|
|
Tom-fire caulking above ceiling Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### ceillings ok all but rated walls
|
BLD-Other | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | FAIL |
Jim Storey
|
|
|
Above ceiling // Tom Phone #: ###-#### provide listings for through pentrations
|
BLD-Ceiling Grid Inspection | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | CANC |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
BLD-Conference | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Jim Storey
|
|
|
tom ###-####
|
BLD-Framing/Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### walked project with contractor
|
BLD-Framing/Rough-in | 9/9/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Concrete | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
OVERRIDE | | | 8/1/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/1/2016 | | DONE |
|
|
|
NO plan mod fees due
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2016 | | DONE |
|
|
|
No plan mod fees due as per Tim Woodard
|
Routing - PLAN CHECK | 7/11/2016 | | 8/1/2016 | | PASS |
Tim L. Woodard
|
|
|
2nd Plan Mod for minor Exterior Changes. Approved by DR and PW. No fees due OK to re-issue. TLW
|
Plan assigned to (TLW) | 7/11/2016 | | 8/1/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 7/11/2016 | | 7/27/2016 | | PASS |
Brian Murphy
|
|
|
revised drainage plan.
|
BLD-Conference | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Jim Storey
|
|
|
Fire Wall questions - Tom Phone #: ###-#### 9:00 appt
|
BLD-Conference | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | DEFR |
Jim Storey
|
|
|
Fire Wall questions - Tom Phone #: ###-####
|
Routing - Design Review | 7/11/2016 | | 7/12/2016 | | PASS |
Sarah Schafer
|
|
|
|
Plan Modification Accepted | | | 7/11/2016 | | DONE |
Christina Prado
|
|
|
Per LCA - Plan mod to update civil drawings
|
Routing - PUBLIC WORKS | 7/11/2016 | | 7/11/2016 | | PASS |
Rachael Beierle
|
|
|
|
BLD-Foundation | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Phil Shearer
|
|
|
Dave Phone #: ###-####. Pending MTI inspection
|
BLD-Footing | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-####placed w si
|
BLD-Footing | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### with si
|
BLD-Wall cover | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Wall Bracing | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | DEFR |
Jim Storey
|
|
|
Tom Phone #: ###-#### out of time
|
BLD-Foundation | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Jim Storey
|
|
|
Rebar // Tom Phone #: ###-####wip/si
|
BLD-Footing | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Jim Storey
|
|
|
Spread footing & stemwall with 10AM pour - Tom Phone #: ###-####w/si
|
BLD-Other | 4/26/2016 | 4/27/2016 | 4/28/2016 | P | PASS |
Jim Storey
|
|
|
slab on grade - Tom Phone #: ###-####si pending out of time
|
BLD-Foundation | 4/19/2016 | 4/19/2016 | 4/20/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Storey
|
|
|
Tom-spread footing and pier pads Phone #: ###-#### placed w/si
|
BLD-Footing | 4/8/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Dave Phone #: ###-####
|
BLD-Foundation | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Tom Phone #: ###-####pwsi
|
BLD-Footing | 3/31/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### placed w si
|
BLD-Foundation | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PART |
Jim Storey
|
|
|
would like call ahead; Tom Phone #: ###-#### wall ok pend s
|
BLD-Foundation | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | PART |
Mike Jordan
|
|
|
Tom Phone #: ###-####. West concrete wall and column pad footings at main building. COlumn pad footings need rings at 3 inches on center and crossties. Special inspector to verify repair.
|
BLD-Footing | 3/21/2016 | 3/22/2016 | 3/22/2016 | A | DEFR |
Mike Jordan
|
|
|
Tom// 1pm pour time Phone #: ###-####. Special inspector on site.
|
BLD-Footing | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | CANC |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Foundation | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PART |
Jim Storey
|
|
|
10:30 pour; Tom Phone #: ###-####pwsi
|
BLD-Footing | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | FAIL |
Jim Storey
|
|
|
Tom Phone #: ###-#### fill without compaction/ rebar in the dirt bottom and sides of foottings
|
BLD-Foundation | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PART |
Jim Storey
|
|
|
Wall // Tom Phone #: ###-#### pending si reports
|
Place hold on job | 2/24/2016 | | 2/29/2016 | | DONE |
Brittany Hill
|
|
|
FIRE REVIEW FEES DUE ON BLD15-03937 & BLD15-03938-- DO NO RE-ISSUE THIS PERMIT WITHOUT THOSE FEES BEING PAID
|
CHANGE STATUS TO (ISS) | | | 2/29/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 2/29/2016 | | DONE |
|
|
|
|
BLD-Footing | 2/23/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####pending si
|
OVERRIDE | | | 2/24/2016 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE
All requirements met for Plan Mod
Must pay all fees prior to changing status to ISS
|
Routing Off Site - STRUCTURAL | 1/26/2016 | | 2/24/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 1/25/2016 | | 2/24/2016 | | PASS |
Tim L. Woodard
|
|
|
new plan mod in e plan review
|
Routing - PLAN CHECK | 1/26/2016 | | 2/24/2016 | | PASS |
Tim L. Woodard
|
|
|
|
BLD-Footing | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### pending si
|
Routing - MECHANICAL | 1/26/2016 | | 1/28/2016 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 1/25/2016 | | DONE |
|
|
|
e plan review
|
Override - Parcel Holds | | | 12/22/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/22/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/22/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 12/11/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 12/11/2015 | | DONE |
|
|
|
all requirements met-see ACHD letter in documents-inspection required***3 permits**need ACHD all other requirements have been met
|
Plan assigned to (TLW) | 8/13/2015 | | 12/10/2015 | | PASS |
Tim L. Woodard
|
|
|
1st review complete - School District
|
Routing - PLAN CHECK | 11/20/2015 | | 12/10/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 11/20/2015 | | 12/10/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2015 | | DONE |
|
|
|
|
Routing PW Environmental | 10/13/2015 | | 11/20/2015 | | PASS |
Rick Christenson
|
|
|
Approved Flammable interceptor.
|
Routing PW Sewer Design | 10/13/2015 | | 11/20/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Approved in E-Plan. TLW
|
Plan resubmittals received | | | 11/20/2015 | | DONE |
|
|
|
|
Routing PW Environmental | 10/13/2015 | | 11/20/2015 | | PASS |
Rick Christenson
|
|
|
Approved in E-Plan. TLW
|
Routing - PLAN CHECK | 10/13/2015 | | 11/20/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/13/2015 | | 11/20/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 10/13/2015 | 10/13/2015 | 10/14/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - MECHANICAL | 10/13/2015 | | 10/14/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 10/13/2015 | | DONE |
Jason Blais
|
|
|
Received resubmittals via ePlanReview. Rerouted resubmittal plans out for review.
|
Routing - PUBLIC WORKS | 10/13/2015 | | 10/13/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 10/13/2015 | | 10/13/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(BOISE SCHOOL DISTRICT OPERATIONS & MAINTENANCE BUILDING) New 50,500 square feet operations and maintenance facility for the Boise School District. One main operations / maintenance / office building, one storage building and one air open shed building.
|
Routing - Design Review | 10/13/2015 | | 10/13/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning
|
Routing PW Sewer Design | 10/13/2015 | | 10/13/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Route to Impact Fee Review | 9/15/2015 | 9/18/2015 | 9/17/2015 | | PASS |
Stephanie Jensen
|
|
|
|
Routing PW Solid Waste | 8/13/2015 | | 9/14/2015 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan Review
|
1st review completed | | | 9/14/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/13/2015 | | 9/14/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 8/13/2015 | | 9/14/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 8/31/2015 | | 8/31/2015 | | PASS |
Bill VanDegrift
|
|
|
updated interceptor ok
|
Routing PW Environmental | 8/13/2015 | | 8/21/2015 | | FAIL |
Rick Christenson
|
|
|
Wash bay and trough drains need to be connected to an approved 1500 gallon flammable liquids interceptor.
|
Routing - MECHANICAL | 8/13/2015 | | 8/21/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 8/13/2015 | | 8/20/2015 | | PASS |
Daryl Spivey
|
|
|
provide an approved flammable liquids interceptor per public works pretreament requirements
|
Routing PW Drainage | 8/14/2015 | | 8/19/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 8/13/2015 | 8/13/2015 | 8/18/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Sewer Design | 8/13/2015 | | 8/17/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Show detail for point of connection to public force main. Ball valve and check valve need to be installed on the service branch within close proximitiy to connection to the public force main.
Contact Public Works 48 hours prior to making connection to schedule inspection.
|
Routing PW Sewer Rating | 8/13/2015 | | 8/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 8/13/2015 | | 8/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/13/2015 | | 8/14/2015 | | FAIL |
Evan Jenkins
|
|
|
SWPPP Narrative (Document) is blank. Might have been an upload issue. Please re-upload SWPPP document for 2nd review.
Evan Jenkins 794.3958
|
Routing PW Drainage | 8/13/2015 | | 8/14/2015 | | CANC |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 8/13/2015 | | 8/14/2015 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Routing - Design Review | 8/13/2015 | | 8/14/2015 | | FAIL |
Andrea Tuning
|
|
|
Condition 1g required the applicant to extend the concrete foundation approximately 3’4” in height and add vertical elements located at the corners of the main building adjacent to the office portion of the building. It appears the wainscot is only 3-feet in height and the vertical elements that were required at the corner of the main building adjacent to the office have not been added.
|
Intake Approval | | | 8/13/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 8/13/2015 | | 8/13/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 8/13/2015 | | 8/13/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Street Lights | 8/13/2015 | | 8/13/2015 | | PASS |
Mike D Hedge
|
|
|
|
Application received | | | 8/6/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 6 2015 8:54AM
|