Permit Information
Permit NumberBLD15-02773
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 11789 W EXECUTIVE DR
Project NameDFS
Customer Number 
ePlanReviewNo
Description
(DIVERSIFIED FLUID SOLUTIONS – DFS – OFFICE AREA) The fire sprinkler system is used for building area increase and for fire area. To remodel an existing 1,850 square foot area within an existing 36,500 square foot tenant space located within an existing 51,500 square foot building. Work is to include interior nonbearing walls, interior doors, office cubicles, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. This tenant space already has a Certificate of Occupancy. This is a scope of work permit. A new Certificate of Occupancy need not be issued. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such system. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/20/2018 DONE
Drawings taken to records
Third Notice 11/14/201512/10/2015 DONE
Second Notice 10/22/201511/9/2015 DONE
Mailed 11-10-15
First Notice9/22/20159/22/201510/12/2015 DONE
DetailsMike Jordan
Mailed 10-13-15
BLD-Final9/21/20159/22/20159/22/2015PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Casey Calico
DOC - Permit Finaled9/22/20159/22/20159/22/2015PPASS
DetailsMike Jordan
DOC - Permit Finaled9/22/20159/22/20159/22/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection9/21/20159/22/20159/22/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Framing/Rough-in9/3/20159/3/20159/3/2015PPASS
DetailsMike Jordan
Inspection requested via web by Casey Calico. Interior steel stud framed walls for new ofices ok.
Issue PAID IN FULL permit  8/13/2015 DONE
Plan assigned to (CJW)8/6/20158/6/20158/11/2015 PASS
DetailsCarl Westfall
DIVERSIFIED FLUID SOLUTIONS (Aug 10 - 3 days) paper - level 1
Routing - PLAN CHECK8/6/2015 8/11/2015 PASS
DetailsCarl Westfall
Drawings approved
1st review completed  8/11/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/11/2015 DONE
Permit Ready to Issue  8/11/2015 DONE
applicant is GC but we need the GC form- ALL REQUIRMENTS MET 8-13-15 ///CEV
Inspection Record Card- Bld  8/11/2015 DONE
Telephone call  8/11/2015 DONE
Left a message informing him that the permit is ready and the fee amount due. Also informed him that we just need him to fill out a 302
Routing - PUBLIC WORKS8/6/2015 8/6/2015 PASS
DetailsJennifer Bruner
Routing - Addressing  8/6/2015 PASS
Intake Approval  8/6/2015 PASS
Plans ACCEPTED BY PLAN TECH  8/6/2015 DONE
Recd Pcfee & Taken To Pln CK  8/6/2015 DONE
Application received 8/6/2015