BLD-Final | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Tony Young
|
|
|
Chad Phone #: ###-####
|
DOC - Permit Finaled | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Framing/Rough-in | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PASS |
Tony Young
|
|
|
Chad Phone #: ###-####
|
BLD-Wall Bracing | 9/8/2015 | 9/9/2015 | 9/9/2015 | A | PASS |
Jim Sly
|
|
|
Chad Phone #: ###-####
|
BLD-Footing | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | PASS |
Phil Shearer
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 8/19/2015 | 8/19/2015 | 8/19/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/12/2015 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/7/2015 | 8/7/2015 | 8/12/2015 | A | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 8/7/2015 | | 8/12/2015 | | DONE |
Tisha Gallop
|
|
|
walk-in routed to erosion 8/7
|
1st review completed | | | 8/12/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/12/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/11/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/7/2015 | | 8/10/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP designated.
|
Routing Walk-In (Zoning) | 8/7/2015 | 8/7/2015 | 8/7/2015 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (PW Hillside) | 8/7/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Application received | | 8/7/2015 | | | |
|
|
|
|