Telephone call | | | 11/24/2015 | | DONE |
|
|
|
Spoke with Kevin about TVR INC's final value. They put in 2,200 and he only had 500. He said he was going to give them a call and get back to me. BLH
|
First Notice | 10/29/2015 | 10/29/2015 | 11/9/2015 | | DONE |
Mike Jordan
|
|
|
Mailed 11-10-15
|
BLD-Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Mike Jordan
|
|
|
Kent Phone #: ###-####
|
DOC - Permit Finaled | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide ADA hardware for the pocket door, repair the exit signs and provide annual inspection for the fire extinguishers. Also need the project related fire sprinkler permit finaled.
|
BLD-Ceiling Grid Inspection | 10/14/2015 | 10/15/2015 | 10/15/2015 | P | PART |
Mike Jordan
|
|
|
Kent Phone #: ###-####. ceiling grid ok, pending fire sprinkler rough in inspection.
|
BLD-Framing/Rough-in | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-#### ok to cover after other trades ok
|
Issue PAID IN FULL permit | | | 8/25/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/25/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 8/7/2015 | 8/7/2015 | 8/12/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 8/13 Artisan Optics Build Room
|
Routing - PLAN CHECK | 8/7/2015 | | 8/12/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Plan Reviewer's activity | | | 8/12/2015 | | DONE |
Javier Guzman
|
|
|
Spoke with Wesley Steele and requested clarification on the removal of the CMU wall if it was bearing and he replied it was for sound, a generator that was in the room.
|
Routing - PLAN CHECK | 8/12/2015 | | 8/12/2015 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/12/2015 | | DONE |
|
|
|
**ALL REQUIREMENTS MET**need GC & rev cert of val
|
1st review completed | | | 8/12/2015 | | DONE |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 8/7/2015 | | 8/10/2015 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 8/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 7 2015 11:17AM
|
Intake Approval | | | 8/7/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 8/7/2015 | | 8/7/2015 | | PASS |
Emily Dixon
|
|
|
Suite 150 added.
|