BLD-Aging Inspection | 9/6/2016 | 9/6/2016 | 9/12/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/7/2016 | 9/7/2016 | 9/12/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/22/2016 | 4/22/2016 | 4/25/2016 | | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/9/2015 | 12/9/2015 | 12/9/2015 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | PASS |
Dave Hannah
|
|
|
John-would like as late as possible Phone #: ###-####
|
BLD-Framing/Rough-in | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | NR |
Dave Hannah
|
|
|
Call 30 minutes before // Jon Phone #: ###-####
|
BLD-Footing | 10/16/2015 | 10/19/2015 | 10/19/2015 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
PubWorks Subgrade Approval | 10/19/2015 | 10/19/2015 | 10/19/2015 | | DONE |
Jason C. Taylor
|
|
|
letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (BLD) | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
David Ferguson
|
|
|
|
Plan Modification Accepted | | | 10/16/2015 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/16/2015 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/16/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/16/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/16/2015 | | DONE |
|
|
|
Plan Mod
|
Plan Modification Accepted | | | 10/16/2015 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/29/2015 | 9/29/2015 | 9/30/2015 | P | PASS |
Tisha Gallop
|
|
|
plan modification
|
Plan assigned to (LEG) Tisha | 9/29/2015 | | 9/30/2015 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
|
|
|
1 hr review fee for building
|
Inspection Record Card- Bld | | | 9/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2015 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2015 | | DONE |
|
|
|
called Katelynn to let know plan mod is ready
|
CHANGE STATUS TO (ISS) | | | 9/30/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/30/2015 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 9/29/2015 | 9/29/2015 | 9/29/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plan Modification Accepted | | | 9/29/2015 | | DONE |
|
|
|
interior plan modification
|
BLD-Footing | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Jim Sly
|
|
|
Jon Phone #: ###-#### New footings OK ....and soils test OK.
|
Routing Walk-In (PW Hillside) | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | PASS |
Jason C. Taylor
|
|
|
No new footings or slabs shown. No requirements from PW Hillside. JCT
|
Routing Walk-In (Zoning) | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 8/10/2015 | 8/10/2015 | 8/10/2015 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 8/10/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/10/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 8/10/2015 | | DONE |
|
|
|
|
1st review completed | | | 8/10/2015 | | DONE |
David Ferguson
|
|
|
|
Application received | | 8/10/2015 | | | |
|
|
|
|