Permit Information
Permit NumberBLD15-02821
StatusFinaled
Name THE EWING COMPANY INC
Site Address 3201 W AIRPORT WAY
Project NameBOISE AIRPORT
Customer Number 
ePlanReviewYes
Description
(PASSENGER BOARDING BRIDGE AT GATE 21 – BOISE AIRPORT – CONCOURSE B EXTENSION) The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction of the concourse building. To construct a fixed 60 foot long elevated passenger boarding bridge to connect Concourse B Extension to the fixed end of a relocated passenger boarding bridge at Gate 21 (which has the capacity to telescope and rotate about the fixed end). Work is to include a new 5 foot diameter concrete drilled pier foundation (at least 14 feet in depth), a relocated steel rotunda column and steel base plate, a relocated passenger boarding bridge, a new 60 foot long fixed passenger boarding bridge, a new concrete slab on grade, etc. The design for the new 60 foot long fixed elevated passenger boarding bridge is a deferred submittal item (the design live load of the floor should be at least 100 pounds per square foot). Special Inspection is required for soils, concrete, anchor bolts, and welding. The existing concrete drilled pier foundation next to the concourse will be used to support one end of the new fixed elevated passenger boarding bridge. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The aircraft passenger boarding bridge, including the fixed portion, shall comply with NFPA 415. Where applicable, the fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/21/2016 DONE
Second Notice 10/20/201611/15/2016 DONE
Mailed 11-16-16
First Notice9/16/20169/16/201610/10/2016 DONE
DetailsJim Storey
mailed 10-11-16
BLD-Final9/15/20169/16/20169/16/2016APASS
DetailsJim Storey
Call for access - Benji Phone #: ###-#### n/a on ele and plm listed equment
DOC - Permit Finaled9/16/20169/16/20169/16/2016PPASS
DetailsJim Storey
FIRE-Final Inspection9/15/20169/15/20169/15/2016PPASS
DetailsJim Page
Previously noted items have been addressed/repaired. No fire sprinklers, no fire alarms, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final7/7/20167/8/20167/8/2016ANR
DetailsJim Storey
Benji// please call for access Phone #: ###-#### pending fire rfi
FIRE-Final Inspection7/7/20167/7/20167/7/2016PFAIL
DetailsTroy Cobbley
Per my interpretation of the drawings/scope of work atleast two exit signs are required, two fire extinguishers, new emergency lighting at the plane end of the tunnel and testing of the new lighting at the concourse end of the tunnel. Contractor is going to contact my supervisor to see if the intent is for the entire tunnel or just their new section.
BLD-Foundation4/29/20165/3/20165/3/2016APART
DetailsJim Storey
inspection will be on the airport inside the SIDA area so if you don''t have a SIDA badge I will have to escort you to the job. The airport will not let us start work before 9:00 AM so please schedule inspection after that time. Phone #: ###-#### Inspection requested via web by doug stanbrough insp. performed by si pending report
Inspection Record Card- Bld  1/22/2016 DONE
Issue PAID IN FULL permit  1/22/2016 DONE
Expiration Notice1/14/20162/5/20161/14/2016 DONE
DetailsBrittany Hill
Plan assigned to (CJW)8/17/20158/17/20159/18/2015 PASS
DetailsCarl Westfall
BOARDING BRIDGE - BOISE AIRPORT (Sept 4 - 15 days) Level 3 TI - ePlanReview
Routing - PLAN CHECK9/10/2015 9/18/2015 DONE
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  9/18/2015 DONE
Permit Ready to Issue  9/18/2015 DONE
**MET 1-21-16** Needs; GC Form and Rev Cert of Value
Routing - FIRE9/11/2015 9/16/2015 PASS
DetailsKatie Marron
Revised report attached to case.
Plan resubmittals received  9/16/2015  
Revised Specifications for Fire Code complaince received and uploaded.
Plan resubmittals received  9/10/2015 DONE
Plan resubmittals requested  9/4/2015 DONE
1st review completed  9/4/2015 DONE
Routing - PLAN CHECK8/17/2015 9/4/2015 PASS
DetailsCarl Westfall
Drawings approved
Routing Off Site - STRUCTURAL8/17/2015 8/21/2015 PASS
DetailsCarl Westfall
Chris Holladay
Routing - FIRE8/17/20158/17/20158/20/2015 FAIL
DetailsScott Arellano
Report attached to case and emailed to architect.
Routing - Addressing8/17/2015 8/17/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/17/2015 8/17/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment8/17/2015 8/17/2015 PASS
DetailsEvan Jenkins
Routing - Design Review8/17/2015 8/17/2015 PASS
DetailsSarah Schafer
Sarah Schafer - exterior passenger bridge work

Extension of the passenger bridge approved through the building permit, no zoning certificate required.
Intake Approval  8/17/2015 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Pending Assignment by JCB8/17/2015 8/17/2015 DONE
DetailsJason Blais
Plan Reviewer's activity  8/13/2015 DONE
DetailsAdele J Schaffeld-Griffin
See revised check list for locaion of missing information in original pre screen check. See note on check list for information on P&Z zoning certificate.
Intake Approval  8/11/2015 FAIL
DetailsAdele J Schaffeld-Griffin
See check list for missing items for pre screen.
Application received  8/10/2015 DONE
Application submitted via PDS Online on Aug 10 2015 2:40PM