Second Notice | | 4/22/2016 | 5/23/2016 | | DONE |
|
|
|
|
First Notice | | 3/27/2016 | 4/12/2016 | | DONE |
|
|
|
mailed 4-13-16
|
Zoning Approval | 3/17/2016 | 3/17/2016 | 3/17/2016 | | DONE |
Carlos Velazquez
|
|
|
zoning approval was giving on 12/3/15 as per Sarah Schafer; it was put under the wrong permit #BLD15-03501 which is for "Early Start ONLY"
|
Permanent Occupancy | | | 3/17/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/17/2016 | | DONE |
|
|
|
|
BLD-Final | 12/9/2015 | 12/9/2015 | 12/9/2015 | P | PASS |
Tony Young
|
|
|
would like call ahead; Levi Phone #: ###-####
|
FIRE-Final Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | PASS |
Jim Page
|
|
|
No fire sprinklers for project, no fire alarms for project. Life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | CANC |
Jim Page
|
|
|
Inspection cancelled per conversation with Levi, phone number ###-####, will reschedule for later date.
|
FIRE-Final Inspection | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | FAIL |
Jim Page
|
|
|
Door hardware on all doors is of the round knob type, door hardware needs to be changed to single action type door handles. Thumb-turn deadbolt located on west side exit door needs to be removed. Signage reading "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED” needs to be installed on front main entry, tenant is allowed one double keyed deadbolt, currently two deadbolts are installed on front main entry (East side entry). Maximum occupancy sign needs to be installed. City approved plans and small documentation not readily avaiable at time of inspection.
|
BLD-Framing/Rough-in | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PART |
Dave Hannah
|
|
|
would like call ahead; Levi Phone #: ###-#### ok to cover int framing
|
Issue PAID IN FULL permit | | | 11/12/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/12/2015 | | DONE |
|
|
|
|
Routing - Design Review | 10/7/2015 | | 10/7/2015 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing - PLAN CHECK | 10/7/2015 | | 10/7/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2015 | | DONE |
|
|
|
***ALL REQUUIRMENTS MET 11-12-15 /CEV Needs; Revised Certificate of Value ONLY
|
Plan assigned to (AJS) | 8/14/2015 | | 10/7/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed 9/10 Level 3 TI - Hyde Park Coffie Shop
|
Routing - PLAN CHECK | 9/23/2015 | | 9/24/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
waiting on request for ADA parking and C of A, okay to issue early start.
|
Routing - Design Review | 9/23/2015 | | 9/23/2015 | | FAIL |
Matthew A Halitsky
|
|
|
Certificate of Appropriateness required for exterior changes.
|
Routing - PLAN CHECK | 9/4/2015 | | 9/8/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 8/31/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - C.D.H | 8/14/2015 | | 8/31/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/14/2015 | | 8/31/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
failed to send back to cathy per her request to upload revised drawings.
|
Routing - PLANNING | 8/14/2015 | | 8/31/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing PW Environmental | 8/14/2015 | | 8/28/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Rating | 8/14/2015 | | 8/14/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 8/14/2015 | | 8/14/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/14/2015 | | 8/14/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - FIRE | 8/14/2015 | | 8/14/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLUMBING | 8/14/2015 | | 8/14/2015 | | PASS |
Daryl Spivey
|
|
|
Lav faucet to comply with ASSE 1070 requirements.
|
Intake Approval | | | 8/13/2015 | | PASS |
|
|
|
By Adele
|
Application received | | | 8/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2015 12:05PM
|
Intake Approval | | | 8/11/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
See check list for missing information required for submittal.
|
Plan Reviewer's activity | | | 8/11/2015 | | DONE |
|
|
|
Plan intake review approved
|