Permit Information
Permit NumberBLD15-02836
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3081 S BROOKRIDGE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone B; Permit for the construction of a new 2280 sq. ft., two story (first story 1066 sq. ft., second story 1222 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 141 sq. ft. of covered patio’s/porches and 696 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/19/20167/20/20167/20/2016APASS
DetailsPhil Shearer
Clint Phone #: ###-####
DOC - Permit Finaled7/20/20167/20/20167/20/2016PPASS
DetailsPhil Shearer
BLD-Energy code compliance5/16/20165/17/20165/17/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/12/20165/13/20165/13/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall Bracing4/8/20164/11/20164/11/2016PPASS
DetailsPhil Shearer
Joseph Phone #: ###-####
BLD-Foundation2/10/20162/10/20162/10/2016PPASS
DetailsPhil Shearer
Alvero Phone #: ###-####
BLD-Footing2/9/20162/9/20162/9/2016PPASS
DetailsPhil Shearer
Avarro Phone #: ###-####
Issue PAID IN FULL permit  9/18/2015 DONE
OVERRIDE  9/2/2015  
Plan assigned to (BJM)8/25/20158/25/20159/2/2015 DONE
DetailsBrian McGowan
due 8/25
1st review completed  9/2/2015 DONE
DetailsBrian McGowan
Case Summary (BLD)  9/2/2015 DONE
DetailsBrian McGowan
Routing - PLAN CHECK9/2/2015 9/2/2015 PASS
DetailsBrian McGowan
Routing - PLAN CHECK9/2/2015 9/2/2015 PASS
DetailsJavier Guzman
Brian did the Review
PLANS/APPL TAKEN TO FRONT DESK  9/2/2015 DONE
Permit Ready to Issue  9/2/2015 DONE
requirements met
Inspection Record Card- Bld  9/2/2015 DONE
Telephone call  9/2/2015 DONE
DetailsChristina Prado
Called Tahoe to advise permit is ready and gave fees due
Routing - PLAN CHECK8/18/2015 8/28/2015 FAIL
DetailsBrian McGowan
Updated Engineering needed and has been requested
Plan assigned to (LEG) Tisha8/11/2015 8/25/2015 DEFR
DetailsTisha Gallop
8/25
Routing - MECHANICAL8/12/2015 8/18/2015 PASS
DetailsTroy James
Routing - PLANNING8/12/2015 8/12/2015 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS  8/12/2015 PASS
Routing - Addressing8/11/2015 8/11/2015 PASS
DetailsEmily Dixon
Plans ACCEPTED BY PLAN TECH  8/11/2015 DONE
Intake Approval  8/11/2015 PASS
Recd Pcfee & Taken To Pln CK  8/11/2015 DONE
Application received 8/11/2015