Print Statement | | | 3/15/2017 | | DONE |
|
|
|
|
First Notice | 2/17/2017 | 2/17/2017 | 3/9/2017 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Jim Storey
|
|
|
Richard Phone #: ###-####per planreview notes
|
DOC - Permit Finaled | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | PASS |
Jim Storey
|
|
|
|
(F) Reprint permit | | | 1/31/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/31/2017 | | DONE |
|
|
|
Plan Mod
|
OVERRIDE | | | 1/30/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 1/20/2017 | 1/20/2017 | 1/30/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 1/30/2017 | | 1/30/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan mod to remove rated finish material for ceiling and walls, to be installed under TI permit
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/30/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
Plan Modification Accepted | | | 1/20/2017 | | DONE |
Christina Prado
|
|
|
Received request from architecture firm to modify the exterior wall construction
|
BLD-Final | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | FAIL |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Submit plan mod to modify scope of work showing the removal of the 1hr. ceiling assembly from the shell scope of work. THis will have to completed on the tenant improvement work. Aslo the west exit door exterio landing needs to be at the same elevation as the interior slab.
|
Zoning Approval | 12/6/2016 | 12/6/2016 | 12/6/2016 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Remove the thumbturn deadbolt as discussed prior to a building inspection
|
BLD-Framing/Rough-in | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Dave Hannah
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PART |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Repairs to 1hr. soffit ok. ok to cover soffit. Architect to provide percent of unprotected openings on 1hr. wall. (windows).
|
BLD-Conference | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | DONE |
Mike Jordan
|
|
|
Richard Phone #: ###-####
|
BLD-Final | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | NR |
Jim Storey
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PART |
Jim Storey
|
|
|
Richard Phone #: ###-#### c/n on site
|
BLD-Wall Bracing | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PASS |
Mike Jordan
|
|
|
call for access; Richard Phone #: ###-####
|
BLD-Foundation | 3/7/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/4/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Perimeter footings.
|
Issue PAID IN FULL permit | | | 2/25/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2016 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2016 | | DONE |
|
|
|
Spoke with Glenn and recommended that he send a request to Jason B for an extension since it looks like the review went a bit longer.
|
OVERRIDE | | | 2/23/2016 | | |
|
|
|
|
Routing - PLAN CHECK | 2/4/2016 | | 2/23/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2016 | | DONE |
Christina Prado
|
|
|
Need RP for issuance
|
Plan assigned to (TLW) | 12/22/2015 | | 2/23/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 2/4/2016 | | |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 2/1/2016 | 2/4/2016 | 2/2/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 2/1/2016 | | 2/1/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/22/2016 | | |
|
|
|
|
Routing - PLAN CHECK | 12/22/2015 | | 1/22/2016 | | FAIL |
Tim L. Woodard
|
|
|
Need rated wall assembly. TLW
|
Routing PW Sewer Design | 12/22/2015 | | 1/13/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Building pad is served with existing 4" sewer service.
|
Routing PW Drainage | 12/22/2015 | | 12/31/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 12/22/2015 | | 12/29/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 12/22/2015 | | 12/28/2015 | | PASS |
Megan Durrell
|
|
|
Approved in eplan. TLW
|
Routing - Erosion and Sediment | 12/22/2015 | | 12/23/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
A new office building - shell only totaling 3,826 sq. ft.
|
Routing - FIRE | 12/22/2015 | 12/22/2015 | 12/22/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Design Review | 12/22/2015 | | 12/22/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Street Lights | 12/22/2015 | | 12/22/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing - PLANNING Land Div | 12/22/2015 | | 12/22/2015 | | PASS |
Dave Abo
|
|
|
Lot 1, Block 1 of Honeymoon Cove Subdivision
|
Routing - PLUMBING | 12/22/2015 | | 12/22/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 12/22/2015 | | 12/22/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/22/2015 | | 12/22/2015 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 12/22/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 12/22/2015 | | 12/22/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 8/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2015 11:17AM
|
Intake Approval | | | 8/11/2015 | | FAIL |
|
|
|
Glenn,
Please provide structural calculations stamped and signed by the engineer.
Best regards,
Tim Woodard
twoodard@cityofboise.org
|