BLD-Final | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | DONE |
Tony Young
|
|
|
Requesting a re-inspect on our Final Inspection. Please call, Kim, if access into house is required. Thank you! Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Tony Young
|
|
|
c of o issued,, left at front desk at 2nd floor city hall for pick up.
|
OVERRIDE | | | 6/20/2016 | | |
|
|
|
|
PubWorks Occupancy Approval | 6/20/2016 | 6/20/2016 | 6/20/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
Plan assigned to (BJM) | 6/8/2016 | 6/8/2016 | 6/20/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/8/2016 | | 6/20/2016 | | PASS |
Brian McGowan
|
|
|
Sheets taken to Jason's office
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/20/2016 | | DONE |
|
|
|
No fees per Brian Mc
|
CHANGE STATUS TO (ISS) | | | 6/20/2016 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/16/2016 | | 6/16/2016 | | PASS |
Jason C. Taylor
|
|
|
sheets are as-built. No changes or approval required.
|
Plan Modification Accepted | | | 6/8/2016 | | DONE |
|
|
|
Three packets labled Moore Residence, three copies of sheets L1.1 and L1.5. Taken to Brian Mc
|
BLD-Final | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | NR |
Tony Young
|
|
|
Final inspection needed. Please call Kim for access code Thx Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Final | 6/1/2016 | 6/3/2016 | 6/3/2016 | A | NR |
Tony Young
|
|
|
Final inspection needed. Please call Kim for access code Thx Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Final | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | NR |
Tony Young
|
|
|
Final inspection needed. Please call Kim for access code at ###-####. Thx Phone #: ###-#### Inspection requested via web by Kim Winkle,, need hillside approval,, needs tempered glass w/in 24" door
|
BLD-Final | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | NR |
Tony Young
|
|
|
Final inspection needed. Please call Kim for access code at ###-####. Thx Phone #: ###-#### Inspection requested via web by Kim Winkle,, needs hillside,, pump final
|
BLD-Final | 5/24/2016 | 5/26/2016 | 5/25/2016 | P | CANC |
Tony Young
|
|
|
Garage access code 2468. Grading inspection should be completed Thursday am with Jason Taylor. REady for final. Thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Grading Inspection | 5/24/2016 | 5/26/2016 | 5/25/2016 | A | CANC |
Tony Young
|
|
|
Need erosion control and grading and drainage inspection with Jason Taylor. Please coordinate for Thursday am. Thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Energy code compliance | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Tony Young
|
|
|
Framing final please. Call steve with questions 850.8424. Plans on site near fireplace. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall cover | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | PART |
Tony Young
|
|
|
Framing final please. Call steve with questions 850.8424. Plans on site near fireplace. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, soffits ok,, work in progress
|
BLD-Conference | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Tony Young
|
|
|
Framing final please. Call steve with questions 850.8424. Plans on site near fireplace. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, frame, soffit ok
|
BLD-Framing/Rough-in | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####,, verify hillside reqts
|
BLD-Conference | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####,, verify hillside reqts,, ok ,, normal wui
|
BLD-Framing/Rough-in | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PEND |
Tony Young
|
|
|
Steve Phone #: ###-####,, needs a conf on site,, possible wui issues?
|
BLD-Foundation | 12/8/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 12/4/2015 | 12/4/2015 | 12/4/2015 | A | NR |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | PASS |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, footings for house and detached garage ok
|
PubWorks Subgrade Approval | 11/25/2015 | 11/25/2015 | 11/25/2015 | | DONE |
Jason C. Taylor
|
|
|
***Residence and Garage Footings only, NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plan assigned to (BJM) | 8/31/2015 | 8/31/2015 | 11/20/2015 | | DONE |
Brian McGowan
|
|
|
1st review 9/9...due 9/1 L2 hillside
|
BLD-Conference | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | CANC |
Tony Young
|
|
|
Please call Steve with questions at ###-#### Phone #: ###-#### Inspection requested via web by Kim Winkle
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 11/17/2015 | 11/17/2015 | 11/18/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 11/17/2015 | | 11/18/2015 | | PASS |
Evan Jenkins
|
|
|
ESC site map and narrative submitted. Valid PD and RP designated. Site preparation inspection required.
|
Routing - PLAN CHECK | 11/18/2015 | | 11/18/2015 | | PASS |
Tisha Gallop
|
|
|
per BJM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/18/2015 | | DONE |
Brian McGowan
|
|
|
|
Override - Parcel Holds | | | 11/18/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 11/18/2015 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | | | 11/18/2015 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2015 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2015 | | DONE |
|
|
|
called Steve- told him permit is ready for pick up
|
Issue PAID IN FULL permit | | | 11/18/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 11/17/2015 | | 11/17/2015 | | PASS |
Brent Moore
|
|
|
|
Routing PW Grading-Hillside | 11/17/2015 | | 11/17/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 11/17/2015 | | 11/17/2015 | | PASS |
Rachael Beierle
|
|
|
|
Plan resubmittals received | | | 11/12/2015 | | DONE |
|
|
|
resubmittals received 3 sheets of L1.1 & L1.5-took to Brian McGowan
|
Routing PW Grading-Hillside | 11/5/2015 | | 11/5/2015 | | FAIL |
Jason C. Taylor
|
|
|
See notes below:
2. Need a defined channel (borrow ditch) placed on the east side of the access road as you come up the property all the way to the tie in with the 15” CMP pipe. This swale/channel should have enough capacity for the concentrated flows and erosion protection for scour. There is currently an erosion problem that is affecting the neighbor’s property with run-on from the site, over the road, and down to their property. Also,may need to update erosion plans to include this area.
|
Plan resubmittals received | | | 11/2/2015 | | DONE |
|
|
|
received (3) copies of grading & drainage plan (L1.1)
|
Routing PW Grading-Hillside | 10/26/2015 | | 10/28/2015 | | FAIL |
Jason C. Taylor
|
|
|
See notes below:
1. Remove note #5 & #6 from plans as they do not pertain to this building.
2. Need a defined channel (borrow ditch) placed on the east side of the access road as you come up the property all the way to the tie in with the 15” CMP pipe. This swale/channel should have enough capacity for the concentrated flows and erosion protection for scour. There is currently an erosion problem that is affecting the neighbor’s property with run-on from the site, over the road, and down to their property. Also,may need to update erosion plans to include this area.
3. Place rip-rap at end of 15” cmp pipe for scour/erosion protection.
4. Where are the 10’ rock walls going? I only see 4’ tall walls? Also, please fix the TW/BW at the north end of the retaining wall (Callout #5) as it has an elevation of 283.
|
Routing - FIRE | 10/26/2015 | 10/26/2015 | 10/26/2015 | | PASS |
Scott Arellano
|
|
|
Attached fire comments to case.
|
Plan resubmittals received | | | 10/14/2015 | | DONE |
|
|
|
received (3) sets of Boulder Retaining Wall Calculations
|
Plan resubmittals received | | | 10/12/2015 | | DONE |
|
|
|
received (3) sets of; Grading & Drainage Plan (L1.1, L1.5), Erosion Control Plan (L2.1, L2.5)
|
Meeting | | | 9/29/2015 | | DONE |
|
|
|
Meeting between applicant and Fire Marshal regarding Fire Department Vehicle Access, Fire Sprinklers, and Fire hyrdrant location. See Fire Code plan review report for details.
|
Routing - PLAN CHECK | 8/19/2015 | | 9/11/2015 | | FAIL |
Brian McGowan
|
|
|
Home must have Automatic Fire Sprinklers or meet Fire access requirements. Plans must be provided showing either.
|
Routing PW Grading-Hillside | 9/10/2015 | | 9/10/2015 | | FAIL |
Jason C. Taylor
|
|
|
Need geotechncial recomendations for building setbacks from slope. Jason Taylor ###-####.
|
1st review completed | | | 9/9/2015 | | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (LEG) Tisha | 8/11/2015 | | 8/31/2015 | | DEFR |
Tisha Gallop
|
|
|
9/1 L2 hillside
|
Routing - FIRE | 8/18/2015 | 8/11/2015 | 8/19/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant.
|
Routing - MECHANICAL | 8/13/2015 | | 8/18/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/18/2015 | | 8/18/2015 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted. Valid PD and RP designated. Site preparation inspection required.
|
Routing - PLANNING | 8/12/2015 | | 8/13/2015 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 8/11/2015 | | 8/12/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/11/2015 | | 8/12/2015 | | PASS |
Beverly Mountain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/11/2015 | | DONE |
|
|
|
|
Intake Approval | | | 8/11/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/11/2015 | | DONE |
|
|
|
|
Application received | | 8/11/2015 | | | |
|
|
|
|