BLD-Final | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Dave Hannah
|
|
|
Drew Phone #: ###-####
|
DOC - Permit Finaled | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Dave Hannah
|
|
|
|
OVERRIDE | | | 6/2/2016 | | |
|
|
|
|
PubWorks Occupancy Approval | 6/2/2016 | 6/2/2016 | 6/2/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
CHANGE STATUS TO (ISS) | | | 6/2/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 6/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/2/2016 | | DONE |
|
|
|
plan mod fees due - DO NOT RE-ISSUE
|
BLD-Final | 5/31/2016 | 6/1/2016 | 6/1/2016 | P | NR |
Dave Hannah
|
|
|
Looking to get our final inspection. I would like to meet you onsite if schedules permit. Please give me a call if you have any questions.
thanks, Drew Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse needs hillside finals and revised plans showing finished basement
|
Plan assigned to (BJM) | 6/1/2016 | 6/1/2016 | 6/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/1/2016 | | 6/1/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/1/2016 | | DONE |
|
|
|
change in basement detail
|
BLD-Wall Bracing | 4/8/2016 | 4/8/2016 | 4/9/2016 | P | PASS |
Dave Hannah
|
|
|
Looking for interior sheer wall Sheetrock inspection. The plans are in the locked mail box onsite and the code is 1027 please give me a call with any questions. Thanks Drew Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Framing/Rough-in | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | DONE |
Dave Hannah
|
|
|
All the paperwork and permitted set of plans are in the black mail box on the corner of the lot. The lock box code is 1027
Thanks Drew Moorhouse Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Energy code compliance | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Dave Hannah
|
|
|
All the paperwork and permitted set of plans are in the black mail box on the corner of the lot. The lock box code is 1027
Thanks Drew Moorhouse Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Framing/Rough-in | 3/18/2016 | 3/18/2016 | 3/21/2016 | P | PART |
Dave Hannah
|
|
|
Give me a Call if you have questions.
thanks, Drew Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by David Moorhouse ok to insulate c/n on site
|
Plan Modification Accepted | | | 2/18/2016 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 2/18/2016 | | 2/18/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 12/8/2015 | 12/8/2015 | 12/8/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 12/4/2015 | 12/4/2015 | 12/4/2015 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
Routing PW Grading-Hillside | 12/4/2015 | | 12/4/2015 | | PASS |
Jim Wyllie
|
|
|
Received letter from geotechnical engineer approving sugrade for patio and pier footings at front entry and spread footings at guest bedroom and fireplace footing south of great room. Footing inspection for items referenced above may be scheduled with the building department.
Jim Wyllie / ###-####
|
BLD-Foundation | 11/12/2015 | 11/13/2015 | 11/13/2015 | P | PASS |
Dave Hannah
|
|
|
Darren Phone #: ###-####
|
BLD-Footing | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-####
|
PubWorks Subgrade Approval | 10/26/2015 | 10/26/2015 | 10/26/2015 | | DONE |
Jason C. Taylor
|
|
|
**ALL FOOTINGS , NO COLUMNS****A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Inspection Record Card- Bld | | | 10/14/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/14/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/9/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/3/2015 | 9/3/2015 | 10/9/2015 | | DONE |
Brian McGowan
|
|
|
FIRST REVIEW COMPLETED. due 9/23 L2 ePlan
|
Routing PW Grading-Hillside | 10/9/2015 | | 10/9/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2015 | | DONE |
Christina Prado
|
|
|
All requirments met
|
Routing - PUBLIC WORKS | 9/2/2015 | | 10/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLAN CHECK | 10/2/2015 | | 10/2/2015 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 10/2/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 9/30/2015 | | 9/30/2015 | | FAIL |
Jason C. Taylor
|
|
|
See notes in ePlan.
|
1st review completed | | | 9/15/2015 | | FAIL |
Brian McGowan
|
|
|
EPLAN
|
Routing - PLAN CHECK | 9/2/2015 | | 9/15/2015 | | PASS |
Brian McGowan
|
|
|
EPLAN
|
Routing PW Grading-Hillside | 9/2/2015 | | 9/9/2015 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. jct
|
Routing - MECHANICAL | 9/8/2015 | | 9/8/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 9/2/2015 | | 9/4/2015 | | FAIL |
Troy James
|
|
|
need to show ventilation design
and mechanical equipment oversized.
|
Plan assigned to (LEG) Tisha | 9/2/2015 | | 9/3/2015 | | DEFR |
Tisha Gallop
|
|
|
9/23 L2 ePlan
|
Routing - Erosion and Sediment | 9/2/2015 | | 9/3/2015 | | PASS |
Evan Jenkins
|
|
|
(ESC Site Prep Insection and Approval Required Prior to Earth Disturbance)
WUI Zone A; Permit for the construction of a new 5,490 sq. ft., two story with a basement (first story 2,833 sq. ft., second story 595 sq. ft., basement level 2,062 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 944 sq. ft. of covered patio/porch and a 2,028 sq. ft. attached garage
|
Routing - FIRE | 9/2/2015 | 9/2/2015 | 9/2/2015 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for fire department vehicle access and water supply. No comments required.
|
Plans ACCEPTED BY PLAN TECH | | | 9/2/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/2/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/2/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 9/2/2015 | | 9/2/2015 | | PASS |
Leon Letson
|
|
|
CFH15-00051 DO NOT issue util 9/4/15 please
|
Routing - Addressing | 9/2/2015 | | 9/2/2015 | | PASS |
Emily Dixon
|
|
|
|
Application received | | | 8/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 12 2015 1:08AM
|