Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-02907
StatusFinaled
Name THE CHRISTENSEN CORPORATION
Site Address 950 W BANNOCK ST Unit: 270
Project NamePacificad Unit Suite 270
Customer Number 
ePlanReviewNo
Description
(PACIFICAD – BANNER BANK BUILDING – 2ND STORY UNIT 270 ) The fire sprinkler system is used for high rise and for story increase. Permit is to remodel an existing 1,607 square foot office tenant space on the 2nd story of a high-rise building by adding 185 sq. ft. from adjacent tenant space to make a total of 1,792 sq. ft. tenant space. Work is to include: removal and installation at select location of Nordwall demountable partitions at the old room #206 removal of 16’ wall, wall at new room #206 close door opening, wall at old room #206 wall 5’, wall at new room #206 new door opening and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Print Statement  10/23/2015 DONE
Second Notice 9/25/201510/12/2015 DONE
DetailsCandy A. Nichols
mailed letter
First Notice 9/10/20159/15/2015 DONE
Mailed 9/16/15
BLD-Final8/28/20158/31/20158/31/2015APASS
DetailsDave Hannah
Phone #: 8415809 >> Inspection requested via mobile web by Mike
Permanent Occupancy  8/31/2015 DONE
DetailsChristina Prado
FIRE-Final Inspection8/28/20158/28/20158/28/2015PPASS
DetailsJim Page
Life fire safety passed/complete
Permit Ready to Issue  8/28/2015 DONE
All requirements met
Print Occupancy Form  8/28/2015 DONE
Telephone call  8/28/2015 DONE
called Marva- told her permit fees and permit is ready for pick up
Issue PAID IN FULL permit  8/28/2015 DONE
Plan assigned to (JG)8/17/20158/17/20158/27/2015 PASS
DetailsJavier Guzman
1st review completed, 8/21 Pacificad
Routing - PLAN CHECK8/27/2015 8/27/2015 PASS
DetailsJavier Guzman
Case Summary (BLD)  8/27/2015 DONE
DetailsJavier Guzman
Plan Reviewer's activity  8/27/2015 DONE
DetailsJavier Guzman
Spoke with Jason Blais and he said it was ok for this project to be on 8x11 plan sheets
PLANS/APPL TAKEN TO FRONT DESK  8/27/2015 DONE
Routing - PLAN CHECK8/18/2015 8/19/2015 FAIL
DetailsJavier Guzman
emailed applicant review report
1st review completed  8/19/2015 FAIL
DetailsJavier Guzman
Routing - Addressing8/17/2015 8/18/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/18/2015 8/18/2015 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  8/17/2015 DONE
Intake Approval  8/17/2015 PASS
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  8/17/2015 DONE
Application received 8/17/2015