Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD15-02909
StatusIssued
Name ASSOCIATED CONSTRUCTION INC
Site Address 1375 S BROADWAY AVE
Project NameMcDonalds
Customer Number 
ePlanReviewYes
Description
(MCDONALDS) Permit for interior and exterior improvements to an existing McDonalds with work to include the removal of existing mansard roof sections, removal and replacement of existing storefronts and doors, construction of a new drive through, new servive counters, remodel of the existing restrooms, removal and replacement of of main area lighting with energy efficient LED lighting and installation of related interior and exterior finishes. This building is not fire sprinklered. There is no increase in occupant load therefor fire sprinklered are not required. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/28/2016 DONE
FIRE-Final Inspection1/29/20161/29/20161/29/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher to be installed per conversation with on site point of contact, Clyde phone number ###-####. Occupancy placard to be installed per conversation with POC. Life fire safety inspection passed/complete.
BLD-Final1/28/20161/29/20161/29/2016ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clyde Dewey
Print Occupancy Form  1/29/2016 DONE
BLD-Ceiling Grid Inspection12/22/201512/23/201512/23/2015APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clyde Dewey ok to drop tile upon ele and hvac insp. aproved
BLD-Framing/Rough-in11/5/201511/6/201511/6/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clyde Dewey
BLD-Concrete11/2/201511/3/201511/3/2015PPASS
DetailsJim Storey
this is for the sono tubs in the drive thru Phone #: ###-#### Inspection requested via web by Clyde Dewey
BLD-Footing10/28/201510/29/201510/29/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clyde Dewey
BLD-Conference10/9/201510/12/201510/12/2015PPASS
DetailsJim Storey
Clyde Phone #: ###-####
Issue PAID IN FULL permit  10/9/2015 DONE
(F) Reprint permit  10/9/2015 DONE
OVERRIDE  10/5/2015  
Permit Ready to Issue  10/5/2015 DONE
DetailsChristina Prado
***MET 10-9-15 BLH*** Need GC, RP & Revised certificate of value for issuance-- RP met on 10-9-15 KRS
Plan assigned to (CDM)9/14/20159/14/201510/4/2015 PASS
DetailsCarl D Madsen
Level 3 TI - ePlanReview - McDonalds
Routing Off Site - C.D.H9/14/2015 10/4/2015 PASS
DetailsCarl D Madsen
No review required
Routing PW Solid Waste9/14/2015 10/4/2015 PASS
DetailsMegan Durrell
1st review completed  10/4/2015 DONE
Routing - Design Review10/4/2015 10/4/2015 PASS
DetailsAndrea Tuning
Signed off per E-plan
PLANS/APPL TAKEN TO FRONT DESK  10/4/2015 DONE
Routing - PLAN CHECK9/14/2015 10/4/2015 PASS
DetailsCarl D Madsen
Routing - Design Review9/14/2015 9/30/2015 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH15-00253
Routing PW Drainage9/14/2015 9/25/2015 PASS
DetailsBrian Murphy
no REVIEW NEED NEW PAVEMENT LESS THAN1000 SQ FEET
Routing - FIRE9/14/20159/14/20159/17/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing PW Environmental9/14/2015 9/17/2015 PASS
DetailsRick Christenson
Any remodel to kitchen needs Pretreatment Review.
Routing - PLUMBING9/14/2015 9/16/2015 PASS
DetailsBill VanDegrift
plumbing is confined to the restroom remodel. If kitchen is to be reconfigured plumbing plans will be required.
Routing - Design Review9/15/2015 9/15/2015 FAIL
DetailsAndrea Tuning
Install 6 bicycle parking spaces.
Install three accessible spaces.
Install three new Class II trees within the three new planter islands proposed on the site near the new drive through lane.
Routing PW Sewer Rating9/14/2015 9/15/2015 PASS
DetailsJennifer Bruner
Routing - Addressing9/14/2015 9/14/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/14/2015 9/14/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment9/14/2015 9/14/2015 PASS
DetailsAndy J. Long
ESC site plan and narrative submitted and approved. Vallid PD, will designate RP when contractor selected.
Pending Assignment by JCB9/14/2015 9/14/2015 DONE
DetailsJason Blais
Intake Approval  9/11/2015 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Intake Approval  8/27/2015 FAIL
8-27-15 Please provide the completed central distict health form as required per the checklist under electronic submittal.
Application received  8/17/2015 DONE
Application submitted via PDS Online on Aug 17 2015 4:16PM