Case Summary (BLD) | | | 3/28/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/29/2016 | 1/29/2016 | 1/29/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher to be installed per conversation with on site point of contact, Clyde phone number ###-####. Occupancy placard to be installed per conversation with POC. Life fire safety inspection passed/complete.
|
BLD-Final | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clyde Dewey
|
Print Occupancy Form | | | 1/29/2016 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clyde Dewey ok to drop tile upon ele and hvac insp. aproved
|
BLD-Framing/Rough-in | 11/5/2015 | 11/6/2015 | 11/6/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clyde Dewey
|
BLD-Concrete | 11/2/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Jim Storey
|
|
|
this is for the sono tubs in the drive thru Phone #: ###-#### Inspection requested via web by Clyde Dewey
|
BLD-Footing | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clyde Dewey
|
BLD-Conference | 10/9/2015 | 10/12/2015 | 10/12/2015 | P | PASS |
Jim Storey
|
|
|
Clyde Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/9/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/5/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
Christina Prado
|
|
|
***MET 10-9-15 BLH*** Need GC, RP & Revised certificate of value for issuance-- RP met on 10-9-15 KRS
|
Plan assigned to (CDM) | 9/14/2015 | 9/14/2015 | 10/4/2015 | | PASS |
Carl D Madsen
|
|
|
Level 3 TI - ePlanReview - McDonalds
|
Routing Off Site - C.D.H | 9/14/2015 | | 10/4/2015 | | PASS |
Carl D Madsen
|
|
|
No review required
|
Routing PW Solid Waste | 9/14/2015 | | 10/4/2015 | | PASS |
Megan Durrell
|
|
|
|
1st review completed | | | 10/4/2015 | | DONE |
|
|
|
|
Routing - Design Review | 10/4/2015 | | 10/4/2015 | | PASS |
Andrea Tuning
|
|
|
Signed off per E-plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2015 | | 10/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 9/14/2015 | | 9/30/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00253
|
Routing PW Drainage | 9/14/2015 | | 9/25/2015 | | PASS |
Brian Murphy
|
|
|
no REVIEW NEED NEW PAVEMENT LESS THAN1000 SQ FEET
|
Routing - FIRE | 9/14/2015 | 9/14/2015 | 9/17/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing PW Environmental | 9/14/2015 | | 9/17/2015 | | PASS |
Rick Christenson
|
|
|
Any remodel to kitchen needs Pretreatment Review.
|
Routing - PLUMBING | 9/14/2015 | | 9/16/2015 | | PASS |
Bill VanDegrift
|
|
|
plumbing is confined to the restroom remodel. If kitchen is to be reconfigured plumbing plans will be required.
|
Routing - Design Review | 9/15/2015 | | 9/15/2015 | | FAIL |
Andrea Tuning
|
|
|
Install 6 bicycle parking spaces.
Install three accessible spaces.
Install three new Class II trees within the three new planter islands proposed on the site near the new drive through lane.
|
Routing PW Sewer Rating | 9/14/2015 | | 9/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/14/2015 | | 9/14/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/14/2015 | | 9/14/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/14/2015 | | 9/14/2015 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative submitted and approved. Vallid PD, will designate RP when contractor selected.
|
Pending Assignment by JCB | 9/14/2015 | | 9/14/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 9/11/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Madsen and plan review fees paid.
|
Intake Approval | | | 8/27/2015 | | FAIL |
|
|
|
8-27-15 Please provide the completed central distict health form as required per the checklist under electronic submittal.
|
Application received | | | 8/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2015 4:16PM
|