Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-02922
StatusFinaled
Name DATUM CONSTRUCTION MANAGEMENT INC
Site Address 10518 W FAIRVIEW AVE
Project NameArea A
Customer Number 
ePlanReviewYes
Description
**(AREA A)** Permit is to remodel a vanilla 905 sq. ft. tenant space. Approval contingent upon adhering to the approved plans on file. Work to include: new construction of interior non-bearing walls to create an office, a conference room, a hallway, relocate existing light fixtures and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/20/20151/11/2016 DONE
Mailed 1-12-16
First Notice 11/12/201512/10/2015 DONE
Mailed 12-11-15
Permanent Occupancy  11/2/2015 DONE
BLD-Final10/28/201510/29/201510/30/2015PPASS
DetailsJim Sly
Jim Phone #: ###-####
FIRE-Final Inspection10/29/201510/30/201510/30/2015APASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarms, life fire safety passed/complete.
BLD-Framing/Rough-in10/13/201510/14/201510/14/2015PPASS
DetailsJim Sly
Jim Phone #: ###-####
Issue PAID IN FULL permit  10/12/2015 DONE
Print Occupancy Form  10/12/2015 DONE
Plan assigned to (JG)9/8/20159/8/20159/28/2015 PASS
DetailsJavier Guzman
Pending PW, 10/05 Level 3 TI - ePlanReview - AREA A
Routing - Addressing9/25/2015 9/28/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/25/2015 9/28/2015 PASS
DetailsJennifer Bruner
1st review completed  9/28/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/28/2015 DONE
Permit Ready to Issue  9/28/2015 DONE
NEED GC form and Certificate of value
Routing - PLAN CHECK9/8/2015 9/25/2015 PASS
DetailsJavier Guzman
Routing - FIRE9/8/20159/8/20159/15/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Intake Approval  9/8/2015 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Pending Assignment by JCB9/8/2015 9/8/2015 DONE
DetailsJason Blais
Intake Approval  8/27/2015 FAIL
A key plan showing where the space is located in the building is still required
Intake Approval  8/24/2015 FAIL
A form 304 is indicated as being provided however there is no form 304 upladed in the documents.
Please provide a key plan indicating the location of the tenant space in the building.
Application received  8/18/2015 DONE
Application submitted via PDS Online on Aug 18 2015 2:36PM