Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-02923
StatusFinaled
Name Tommy Ahlquist
Site Address 13901 W WAINWRIGHT DR
Project NameAlliance Soft Tissue Center
Customer Number 
ePlanReviewNo
Description
(ALLIANCE SOFT TISSUE CENTER) Permit is to remodel an existing 1,595 square foot office space. This office space was previously occupied under BLD12-01694 by “STAT PADS”. Work includes: demo existing walls to enlarge one existing office, relocate one wall to expand entry area, create new accessible counter, new accessible doors / hardware, minor electrical, minor mechanical, and interior finishes in accordance with Chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 10/11/201511/9/2015 DONE
Mailed 11-10-15
Permanent Occupancy  10/1/2015 DONE
DetailsChristina Prado
BLD-Final9/28/20159/30/20159/30/2015PPASS
DetailsJim Sly
Matt Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection9/28/20159/30/20159/30/2015APASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  9/3/2015 DONE
Permit Ready to Issue  8/31/2015 DONE
need GC and rev cert of val
Print Occupancy Form  8/31/2015 DONE
Telephone call  8/31/2015 DONE
Spoke with Brad informing him that the permit is ready just need a 302 and 306 from the GC before issuing the permit and to put the final fees in
Plan assigned to (TLW)8/21/2015 8/30/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/21/2015 8/30/2015 PASS
DetailsTim L. Woodard
Routing - Addressing8/21/2015 8/30/2015 PASS
DetailsEmily Dixon
Approved on Plans. TLW
1st review completed  8/30/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/30/2015 DONE
Case Summary (BLD)  8/30/2015 DONE
Routing - PUBLIC WORKS8/21/2015 8/21/2015 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  8/21/2015 DONE
Intake Approval  8/21/2015 PASS
Recd Pcfee & Taken To Pln CK  8/21/2015 DONE
Application received  8/18/2015 DONE
Application submitted via PDS Online on Aug 18 2015 2:38PM