BLD-Final | 9/3/2015 | 9/4/2015 | 9/4/2015 | A | PASS |
Dave Hannah
|
|
|
Final can be done at anytime. Thanks, Rich. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Subgrade Approval | 9/2/2015 | 9/2/2015 | 9/2/2015 | | DONE |
Jason C. Taylor
|
|
|
***3 COLUMN PADS***A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 8/31/2015 | 9/1/2015 | 9/1/2015 | P | PASS |
Dave Hannah
|
|
|
MTI will be there to do the subgrade inspection at 1 if you want to join the party. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Routing Walk-In (PW Hillside) | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/18/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 8/18/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 8/18/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/18/2015 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/18/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/18/2015 | | | |
|
|
|
|