BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Sam Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 1/22/2019 | 1/22/2019 | 1/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | NR |
Brandon Shaw
|
|
|
Need PW to approve the roof storm drainage system...
|
BLD-Aging Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Other | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Brandon Shaw
|
|
|
sofit- Sam Phone #: ###-####
|
BLD-Other | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Brandon Shaw
|
|
|
Cancel per Sam softits- Sam Phone #: ###-####
|
BLD-Other | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Under deck and covered deck area
|
BLD-Energy code compliance | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Energy code compliance | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Shear corrections SAT... As per walk thu... Add straps at breaks in double top plates Tripple ply grider to bear down to foundation See red paint OK to insulate
|
BLD-Framing/Rough-in | 8/17/2018 | 8/21/2018 | 8/21/2018 | A | FAIL |
Brandon Shaw
|
|
|
Address to be visible form the street... Need trades rough in approvals... No air/foam seal... Wall bracing failed a) Hold down and straps to be as per plans b) Per S1.1, details 5 & 6, 2x6 walls to be 16" O.C. c) Anchor bolts to be not more than 12" from ends of sill plates See red paint
|
Plan Modification Accepted | | | 7/20/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 7/20/2018 | | 7/20/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Telephone call | | | 5/14/2018 | | DONE |
|
|
|
Jordan with Quality Heating requested a copy of the manual J's so i emailed it to him
|
Fees Due Hold | 3/22/2018 | | 3/23/2018 | | DONE |
Brittany Hill
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/23/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/23/2018 | | DONE |
|
|
|
|
BLD-Conference | 3/21/2018 | 3/21/2018 | 3/21/2018 | A | PEND |
Bob Archibald
|
|
|
Recieved request for permit reactivation. Permit may be reactivated for 1/2 of original fee (only footings inspections have been completed).
|
Meeting | | | 3/21/2018 | | DONE |
|
|
|
customer came in-put fee in so they could get a check cut and come back-Bob's email says 1/2 the orig building permit
|
Permit EXPIRED | | | 1/18/2018 | | DONE |
|
|
|
Expired by limitations
|
(F) Reprint permit | | | 12/21/2017 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 5/24/2016 | 5/24/2016 | 5/24/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Foundation | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Phil Shearer
|
|
|
J.R. Phone #: ###-####
|
BLD-Foundation | 12/23/2015 | 12/24/2015 | 12/24/2015 | A | PASS |
Phil Shearer
|
|
|
J.R. Phone #: ###-####
|
BLD-Footing | 12/11/2015 | 12/14/2015 | 12/14/2015 | P | PART |
Tony Young
|
|
|
J.R. Phone #: ###-####,, crawl area,, work in progress,, will pour 12/15,, will blanket forms tonight
|
BLD-Foundation | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | PASS |
Phil Shearer
|
|
|
JR Phone #: ###-####
|
BLD-Foundation | 12/1/2015 | 12/2/2015 | 12/2/2015 | P | CANC |
Phil Shearer
|
|
|
FIrst thing PM please, would like to pour @ 2 - JR Phone #: ###-####
|
BLD-Footing | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | NR |
Phil Shearer
|
|
|
Pouring at 1 - JR Phone #: ###-####
|
BLD-Footing | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | CANC |
Phil Shearer
|
|
|
Pouring at 1 - JR Phone #: ###-####
|
BLD-Footing | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | CANC |
Phil Shearer
|
|
|
Pouring at 3 - JR Phone #: ###-####
|
BLD-Footing | 11/17/2015 | 11/18/2015 | 11/18/2015 | A | CANC |
Phil Shearer
|
|
|
Pouring at 3 - JR Phone #: ###-####
|
BLD-Foundation | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PASS |
Phil Shearer
|
|
|
Pouring at 3 - JR Phone #: ###-####
|
BLD-Footing | 11/4/2015 | 11/5/2015 | 11/6/2015 | P | PART |
Phil Shearer
|
|
|
JR Phone #: ###-####-- pour time is 330 Basement only
|
PubWorks Subgrade Approval | 11/6/2015 | 11/6/2015 | 11/6/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/8/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/30/2015 | | |
|
|
|
|
Routing PW Grading-Hillside | 9/29/2015 | | 9/30/2015 | | PASS |
Jason C. Taylor
|
|
|
per ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2015 | | DONE |
|
|
|
All Requirements Met
|
Plan assigned to (LEG) Tisha | 8/25/2015 | | 9/30/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 9/17; plan check, hillside (need 2012 retaining wall calcs)
|
Routing - PLAN CHECK | 9/29/2015 | | 9/30/2015 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 9/29/2015 | | 9/29/2015 | | PASS |
Brent Moore
|
|
|
|
Routing - PLANNING | 9/29/2015 | | 9/29/2015 | | PASS |
Brent Moore
|
|
|
|
Plan resubmittals received | | | 9/25/2015 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 9/17/2015 | | FAIL |
|
|
|
pending approval from Plan Check and Hillside PW
|
Routing - PLAN CHECK | 8/25/2015 | | 9/17/2015 | | FAIL |
Tisha Gallop
|
|
|
see changemarks
|
Routing - MECHANICAL | 9/1/2015 | | 9/1/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/25/2015 | | 8/31/2015 | | FAIL |
Troy James
|
|
|
no manual j report-
emailed applicant
|
Routing - FIRE | 8/25/2015 | 8/25/2015 | 8/26/2015 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for fire department vehicle access and water supply. No comments required.
|
Routing PW Grading-Hillside | 8/25/2015 | | 8/26/2015 | | FAIL |
Jason C. Taylor
|
|
|
No geotechnical report was uploaded with submittal. PW cannot review plans until geotechnical report is submitted. Jason Taylor ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2015 | | DONE |
|
|
|
|
Intake Approval | | | 8/25/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/25/2015 | | DONE |
|
|
|
|
Routing - Addressing | 8/25/2015 | | 8/25/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/25/2015 | | 8/25/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/25/2015 | | 8/25/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbing Activities)
Permit for the construction of a new 4,864 sq. ft., one story with a basement level (main story 2,807 sq. ft., basement level 2,057 sq. ft.) single family dwelling with 5 bedrooms, 4 & 1/2 bathrooms, approximately 201 sq. ft. of covered patio/porch and a 1,465 sq. ft. attached garage
|
Application received | | | 8/18/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 18 2015 10:16PM
|