BLD-Aging Inspection | 5/5/2016 | 5/5/2016 | 5/10/2016 | | PEND |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/9/2016 | 5/9/2016 | 5/10/2016 | A | CANC |
Dave Hannah
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Aging Inspection | 5/4/2016 | 5/4/2016 | 5/10/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/20/2015 | 12/21/2015 | 12/22/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs
|
BLD-Framing/Rough-in | 12/17/2015 | 12/17/2015 | 12/18/2015 | P | PART |
Dave Hannah
|
|
|
Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacob house only ok to insulate but do not cover antill mec rough in is done
|
BLD-Framing/Rough-in | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | CANC |
Dave Hannah
|
|
|
As early as possible Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs
|
BLD-Framing/Rough-in | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | NR |
Dave Hannah
|
|
|
Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs still needs mec rough ins
|
BLD-Framing/Rough-in | 12/10/2015 | 12/11/2015 | 12/11/2015 | P | NR |
Dave Hannah
|
|
|
As late as possible Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs needs mec r/i and air seal installed
|
BLD-Wall Bracing | 11/19/2015 | 11/19/2015 | 11/20/2015 | P | PASS |
Dave Hannah
|
|
|
Duillermo Phone #: ###-#### garage ok to cover ext
|
BLD-Wall Bracing | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Dave Hannah
|
|
|
Guillermo Phone #: ###-####
|
BLD-Footing | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Dave Hannah
|
|
|
Jerrod Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/1/2015 | | |
|
|
|
|
Telephone call | | | 9/1/2015 | | DONE |
|
|
|
Spoke with Buck informing him that the permit is ready and the fee amount that is due
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/1/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 8/21/2015 | | 8/31/2015 | | DONE |
Tisha Gallop
|
|
|
passed 8/28; missed ESC
|
Routing - PLAN CHECK | 8/25/2015 | | 8/28/2015 | | PASS |
Tisha Gallop
|
|
|
routed to esc
|
Routing - Erosion and Sediment | 8/28/2015 | | 8/28/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid RP and PD designated. Site has surface water of Boise City Canal passing through it. Site preparation inspection required.
|
Routing - MECHANICAL | 8/21/2015 | | 8/25/2015 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (BLD) | 8/24/2015 | 8/24/2015 | 8/24/2015 | P | CANC |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Matthew A Halitsky
|
|
|
|
Routing Walk-In (BLD) | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | CANC |
Tisha Gallop
|
|
|
routed plans
|
1st review completed | | | 8/21/2015 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 8/21/2015 | | | |
|
|
|
|