BLD-Final | 5/24/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Mike Jordan
|
|
|
Grading inspection with Jason Taylor Thursday am. Final inspection and C of O PM. Garage code is 0713. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Grading Inspection | 5/24/2016 | 5/26/2016 | 5/25/2016 | A | CANC |
Dave Hannah
|
|
|
Need erosion control and grading and drainage inspection with Jason Taylor. Please coordinate for Thursday am. Thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
PubWorks Occupancy Approval | 5/25/2016 | 5/25/2016 | 5/25/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 2/22/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
Dave Hannah
|
|
|
Framing final and insulation approval. Plans are on site by power panel. Call steve with any question or comments. thanks. Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PART |
Dave Hannah
|
|
|
ok to insulate c/n on site
|
BLD-Conference | 2/18/2016 | 2/22/2016 | 2/22/2016 | A | DONE |
Dave Hannah
|
|
|
Framing Inspection. Call Steve Hanson with questions 850.8424. Plans on HVAC platform. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Framing/Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | NR |
Dave Hannah
|
|
|
Plans are on site near fireplace. home is open for inspection. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Foundation | 1/13/2016 | 1/13/2016 | 1/13/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Temp Occupancy Appr | 1/12/2016 | 1/12/2016 | 1/12/2016 | | DONE |
Jason C. Taylor
|
|
|
**GARAGE FOOTINGS ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 1/7/2016 | 1/7/2016 | 1/7/2016 | P | CANC |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/17/2015 | 11/17/2015 | 11/18/2015 | P | PART |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron basement ftgs ok to place concrete
|
PubWorks Subgrade Approval | 11/18/2015 | 11/18/2015 | 11/18/2015 | | DONE |
Jason C. Taylor
|
|
|
**Basement Area only**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | CANC |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 10/19/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/16/2015 | | |
|
|
|
|
Plan assigned to (DAF) | 10/14/2015 | 10/14/2015 | 10/16/2015 | | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 8/31/2015 | 8/31/2015 | 10/16/2015 | | PASS |
David Ferguson
|
|
|
due 9/16 L2 (Note: Jason in PW has a hold on this project for geotech issues)
|
Routing PW Grading-Hillside | 10/14/2015 | | 10/16/2015 | | PASS |
Jason C. Taylor
|
|
|
Before any footings or load bearing column pads (interior or exterior) are poured, the soils engineer (Dave Cram or Elizabeth Brown at Materials Testing & Inspection) shall inspect and provide written approval (soils engineer only) that the foundation subgrade soil conditions are as indicated in the approved soils report. This report shall approve the native subgrade condition, native soil compaction, structural fill compaction, under drain approval, and foundation drain approval (additional letter may be submitted after foundations are poured but prior to backfill activities). The Building Department will not perform a footing inspection until after the soil engineer’s letter for the footing subgrade has been approved by Boise City Public Works.
|
Routing - PUBLIC WORKS | 10/16/2015 | | 10/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLAN CHECK | 10/16/2015 | | 10/16/2015 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/16/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2015 | | DONE |
|
|
|
All Requirements Met
|
Inspection Record Card- Bld | | | 10/16/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2015 | | DONE |
|
|
|
called Steve- told him permit is ready for pick up and fees due
|
Plan resubmittals received | | | 10/14/2015 | | DONE |
|
|
|
received (3) sets of; Landscape Plan (L3.1), Grading/Drainage (L1.1, L1.5), Erosion/Sediment Plan (L2.1, L2.5)
|
Routing - PLAN CHECK | 10/14/2015 | | 10/14/2015 | | DONE |
David Ferguson
|
|
|
Routed resubs. to Jason Taylor in PW Hillside.
|
Routing PW Grading-Hillside | 9/17/2015 | | 10/8/2015 | | FAIL |
Jason C. Taylor
|
|
|
Per conditions by thrid party geotechnical engineer. Need revised grading plans (3) submitted for approval by PW. Jason Taylor ###-####
|
Routing Off Site - STRUCTURAL | 9/28/2015 | | 10/8/2015 | | PASS |
Jason C. Taylor
|
|
|
Sent to John Barker at CH2M Hill for 3rd party evaluation. See conditons of approval. JCT
|
Case Summary (BLD) | | | 10/7/2015 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 9/16/2015 | | 9/16/2015 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 9/16/2015 | | DONE |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 9/15/2015 | | DONE |
|
|
|
received two copies of sheets electrical 12, electrical 11, and section 7- put on Dave's desk
|
1st review completed | | | 9/11/2015 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | | | 9/11/2015 | | FAIL |
David Ferguson
|
|
|
Missing 3 details - designer will provide next week.
|
Routing PW Grading-Hillside | 8/26/2015 | | 9/8/2015 | | FAIL |
Jason C. Taylor
|
|
|
Need third party geotechnical review prior to approval from PW or Building Department. Jason Taylor ###-####.
|
Routing - FIRE | 9/2/2015 | 8/26/2015 | 9/3/2015 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for fire department vehicle access and water supply. No comments required.
|
Routing - Erosion and Sediment | 9/2/2015 | | 9/2/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A; Permit for the construction of a new 3496 sq. ft., two story (first story 1838 sq. ft., basement is 1658 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 543sq. ft. of covered patio’s/porches and 798 sq. ft. attached garage
|
Routing - MECHANICAL | 8/27/2015 | | 9/2/2015 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 8/26/2015 | | 8/31/2015 | | DEFR |
Tisha Gallop
|
|
|
9/16 L2
|
Routing - PUBLIC WORKS | 8/26/2015 | | 8/27/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 8/27/2015 | | 8/27/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 8/27/2015 | | 8/27/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 8/26/2015 | | 8/26/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/26/2015 | | DONE |
|
|
|
|
Intake Approval | | | 8/26/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/26/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2015 | | DONE |
|
|
|
emailed Steve that we need the narratives when he comes in with the 2 sets of grading and drainage. Plans are on Candy's desk
|
Application received | | 8/24/2015 | | | |
|
|
|
|