First Notice | 8/25/2016 | 8/25/2016 | 9/12/2016 | | DONE |
Mike Jordan
|
|
|
Mailed 9-13-16
|
FIRE-Final Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Mike Jordan
|
|
|
TJ Phone #: ###-####
|
DOC - Permit Finaled | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Mike Jordan
|
|
|
job site visit. Review special inspection reports.
|
BLD-Foundation | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. reinforcement for interior slab on grade.
|
BLD-Concrete | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | DONE |
Jim Storey
|
|
|
will pour at 1:00 call Jeff if you have questions. Phone #: ###-####placed w/si
|
BLD-Wall Bracing | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PART |
Mike Jordan
|
|
|
Rebar // TJ Phone #: ###-####. Work in progress, Perimeter concrete walls. pending special inspection.
|
BLD-Footing | 1/8/2016 | 1/11/2016 | 1/11/2016 | A | PART |
Mike Jordan
|
|
|
TJ Phone #: ###-####. south footing. Work in progress. ok pending special inspection.
|
BLD-Footing | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PART |
Mike Jordan
|
|
|
TJ Phone #: ###-####. Work in progress on mat footing.
|
OVERRIDE | | | 12/4/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 10/21/2015 | 10/21/2015 | 12/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Darigold New Engine Room
|
Issue PAID IN FULL permit | | | 12/4/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/24/2015 | | 12/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/4/2015 | | DONE |
Christina Prado
|
|
|
***ALL MET*** Need ACHD, ***MET*** RP, GC & Reviced certificate of vlaue for issuance
|
Routing - Design Review | 12/2/2015 | | 12/2/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 11/24/2015 | | 11/27/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 11/23/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
applicant submitted for phase 2 under the foundation permit. deleted sheets and sent project back. needs separeate permit.
|
Routing Off Site - STRUCTURAL | 11/10/2015 | | 11/16/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 11/10/2015 | | 11/16/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 11/6/2015 | 11/9/2015 | 11/10/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Design Review | 11/10/2015 | | 11/10/2015 | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to provide a total of 118 parkign spaces with 5 of those spaces being accessible. All ADA spaces must have the appropriate access aisle.
|
Plan Reviewer's activity | | | 11/9/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
sent email questions on review comments from applicant to engineer.
|
Routing - PLAN CHECK | 10/21/2015 | | 11/6/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PUBLIC WORKS | 10/21/2015 | | 11/6/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing Off Site - STRUCTURAL | 10/21/2015 | | 11/6/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 11/6/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 10/21/2015 | | 10/26/2015 | | PASS |
|
|
|
For Site Utilities only. Phase II will have all P sheets and internal plumbing. TLW
|
Routing - FIRE | 10/21/2015 | 10/21/2015 | 10/21/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLANNING Land Div | 10/21/2015 | | 10/21/2015 | | PASS |
Dave Abo
|
|
|
Parcel is over 5 acres in size.
|
Routing - Addressing | 10/21/2015 | | 10/21/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - Erosion and Sediment | 10/21/2015 | | 10/21/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(Foundation Only) A new engine room separate from the existing plant will be provided along with refrigeration upgrades that consist of changing the existing ammonia system into an ethylene glycol system.
|
Routing - Design Review | 10/21/2015 | | 10/21/2015 | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to provide a total of 118 parkign spaces with 5 of those spaces being accessible.
|
Intake Approval | | | 10/21/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 10/21/2015 | | 10/21/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 10/15/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following:
1. The energy code compliance section cannot be differed submittals because this is a new building please upload the items requested in this section
2. Mechanical, plumbing and electrical plans required because this is a new building, please upload plans with the items requested in these sections
3. Shallow injection well plans seepage bed 1 and seepage be 2 did not upload correctly, please re-upload these plans again.
|
Telephone call | | | 9/15/2015 | | DONE |
Rita DeYoung
|
|
|
customer is required to file for a DR prior to the building permit process.
|
Intake Approval | | | 8/31/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following items:
• Please provide a completed #502 Plan Intake Submittal Checklist
• The Checklist must be completed and all additional items requested from the checklist uploaded. The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Incomplete submittals will not be accepted.
|
Application received | | | 8/24/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2015 1:21PM
|
Routing - Design Review | 11/24/2015 | | | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to provide a total of 118 parkign spaces with 5 of those spaces being accessible. All ADA spaces must have the appropriate access aisle.
|