Permit Information
Permit NumberBLD15-03027
StatusFinaled
Name ARBOR FINISH CARPENTRY INC
Site Address 1407 S VISTA AVE
Project NameThistle and Poppy Salon
Customer Number 
ePlanReviewYes
Description
(THISTLE AND POPPY SALON) (CZC15-00195) This building does not have a fire sprinkler system. To remodel an existing 1,584 square foot former office building (850 square feet 1st story and 734 square feet basement) to be used as a hair salon. Work is to include interior nonbearing walls, upgrading 2 restrooms to be accessible to the disabled, an interior stairway, exterior concrete steps, and an exterior circular concrete ramp accessible to the disabled. Some structural work will be done to redirect the gravity load path of the roof structure. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/20/20164/12/2016 DONE
First Notice 2/29/20163/10/2016 DONE
Mailed 3-11-16
BLD-Final2/19/20162/19/20162/19/2016PPASS
DetailsPhil Shearer
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
BLD-Final2/18/20162/19/20162/19/2016AFAIL
DetailsPhil Shearer
would like call ahead; Chris Phone #: ###-####. Handrall on stairs, Grab bar in bathroom.
Permanent Occupancy  2/19/2016 DONE
FIRE-Final Inspection2/17/20162/18/20162/18/2016APASS
DetailsTroy Cobbley
Life safety passed. Per plan review the exit signs and emergency lights shown on the plans are not required. Contractor did not install.
Zoning Approval2/18/20162/18/20162/18/2016 DONE
DetailsLeon Letson
BLD-Concrete2/8/20162/9/20162/9/2016ADONE
DetailsDave Hannah
Need an inspection for concrete ramp and have some questions on ADA handrail on ramp. Please call Julio (###-####) half an hour before inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
BLD-Concrete2/4/20162/5/20162/5/2016ADONE
DetailsPhil Shearer
I need an inspection for concrete forms for the handicap ramp in front of the building. Phone #: ###-#### Inspection requested via web by Chris Eby
OVERRIDE  2/4/2016  
Plan assigned to (CJW)1/12/20161/12/20162/4/2016 PASS
DetailsCarl Westfall
plan mod (Thistle and poppy)
Case Summary (BLD)  2/4/2016 DONE
Plan resubmittals received  2/4/2016 DONE
Workflow was received. It was initiated by Christina Prado. Ward did not sign off. The Applicant decided to cancel the plan mod and go with the original approved design.
Routing - PLAN CHECK2/4/2016 2/4/2016 PASS
DetailsCarl Westfall
Plan mod cancelled. Applicant decided to go with the original approved design.
PLANS/APPL TAKEN TO FRONT DESK  2/4/2016 DONE
Permit Ready to Issue  2/4/2016 DONE
DetailsChristina Prado
All requirements met, not fees
CHANGE STATUS TO (ISS)  2/4/2016 DONE
DetailsChristina Prado
Routing - PLANNING1/14/2016 1/19/2016 PASS
DetailsLeon Letson
6 parking spaces provided in accordance with CZC15-00195. Applicant has opted to locate 4 standard parking spaces along northern portion of property. Field verified by Planning on 2-12-2016.
Plan resubmittals requested  1/19/2016 DONE
Routing - PLAN CHECK1/12/2016 1/14/2016 PASS
DetailsCarl Westfall
1st plan mod approved
Routing - PLUMBING1/14/2016 1/14/2016 PASS
DetailsBill VanDegrift
1) asse 1070 mixing valve required at new public lavs
2) additional cross connection protection may be required, hair sinks, etc.
Plan Modification Accepted  1/12/2016 DONE
ePlanReview workflow received
Plan Modification Accepted  1/12/2016 DONE
DetailsChristina Prado
Plan mod requested by Architect to make changes to ADA ramp provided
BLD-Framing/Rough-in12/3/201512/3/201512/3/2015PPASS
DetailsPhil Shearer
The lock box code is 1407. Please call me if you have any issues or questions. Phone #: ###-#### Inspection requested via web by Chris Eby
Print Occupancy Form  10/21/2015 DONE
Issue PAID IN FULL permit  10/21/2015 DONE
OVERRIDE  10/16/2015  
Plan assigned to (CJW)9/17/20159/17/201510/16/2015 PASS
DetailsCarl Westfall
(1st done) THISTLE AND POPPY SALON (Oct 7 - 15 days) - level 3
PLANS/APPL TAKEN TO FRONT DESK  10/16/2015 DONE
Permit Ready to Issue  10/16/2015 DONE
DetailsChristina Prado
Need GC, RP , ACHD & Revised certificate of value for issuance
Routing - PLAN CHECK10/14/2015 10/15/2015 PASS
DetailsCarl Westfall
Drawings approved with redlines.
Routing - Erosion and Sediment10/15/2015 10/15/2015 PASS
DetailsEvan Jenkins
(THISTLE AND POPPY SALON) (CZC15-00195) This building does not have a fire sprinkler system. To remodel an existing 1,584 square foot former office building (850 square feet 1st story and 734 square feet basement) to be used as a hair salon. Work is to include interior nonbearing walls, upgrading 2 restrooms to be accessible to the disabled, an interior stairway, exterior concrete steps, and an exterior circular concrete ramp accessible to the disabled. Some structural work will be done to redirect the gravity load path of the roof structure.
Routing - MECHANICAL10/15/2015 10/15/2015 PASS
DetailsTroy James
Plan resubmittals received  10/14/2015 DONE
1st review completed  10/13/2015 DONE
Plan resubmittals requested  10/13/2015 DONE
Routing - PLAN CHECK9/17/2015 10/13/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - PLANNING9/17/2015 9/22/2015 PASS
DetailsLeon Letson
Leon Letson - CZC15-00195. Parking Lot striping must be field verified prior to C of O.
Routing - FIRE9/17/20159/17/20159/21/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing - MECHANICAL9/17/2015 9/21/2015 FAIL
DetailsTroy James
Routing - PLUMBING9/17/2015 9/21/2015 PASS
DetailsBill VanDegrift
1) ASSE 1070 required at lavs
2) AVB required at the hair sinks
Routing - PUBLIC WORKS9/17/2015 9/18/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment9/17/2015 9/18/2015 FAIL
DetailsEvan Jenkins
ESC Waiver Request Letter Required Describing work. ESC Permit Required. Evan Jenkins 794.3958
Routing PW Sewer Rating9/18/2015 9/18/2015 PASS
DetailsJennifer Bruner
Routing PW Drainage9/18/2015 9/18/2015 PASS
DetailsBrian Murphy
NO REVIEW REQUIREE
Plan Reviewer's activity  9/17/2015 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
Routing - Addressing9/17/2015 9/17/2015 PASS
DetailsEmily Dixon
Intake Approval  9/17/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Pending Assignment by JCB9/17/2015 9/17/2015 DONE
DetailsJason Blais
Application received  8/24/2015 DONE
Application submitted via PDS Online on Aug 24 2015 5:25PM