Second Notice | | 3/20/2016 | 4/12/2016 | | DONE |
|
|
|
|
First Notice | | 2/29/2016 | 3/10/2016 | | DONE |
|
|
|
Mailed 3-11-16
|
BLD-Final | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | PASS |
Phil Shearer
|
|
|
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
|
BLD-Final | 2/18/2016 | 2/19/2016 | 2/19/2016 | A | FAIL |
Phil Shearer
|
|
|
would like call ahead; Chris Phone #: ###-####. Handrall on stairs, Grab bar in bathroom.
|
Permanent Occupancy | | | 2/19/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per plan review the exit signs and emergency lights shown on the plans are not required. Contractor did not install.
|
Zoning Approval | 2/18/2016 | 2/18/2016 | 2/18/2016 | | DONE |
Leon Letson
|
|
|
|
BLD-Concrete | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | DONE |
Dave Hannah
|
|
|
Need an inspection for concrete ramp and have some questions on ADA handrail on ramp. Please call Julio (###-####) half an hour before inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
|
BLD-Concrete | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | DONE |
Phil Shearer
|
|
|
I need an inspection for concrete forms for the handicap ramp in front of the building. Phone #: ###-#### Inspection requested via web by Chris Eby
|
OVERRIDE | | | 2/4/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 1/12/2016 | 1/12/2016 | 2/4/2016 | | PASS |
Carl Westfall
|
|
|
plan mod (Thistle and poppy)
|
Case Summary (BLD) | | | 2/4/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/4/2016 | | DONE |
|
|
|
Workflow was received. It was initiated by Christina Prado. Ward did not sign off. The Applicant decided to cancel the plan mod and go with the original approved design.
|
Routing - PLAN CHECK | 2/4/2016 | | 2/4/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod cancelled. Applicant decided to go with the original approved design.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/4/2016 | | DONE |
Christina Prado
|
|
|
All requirements met, not fees
|
CHANGE STATUS TO (ISS) | | | 2/4/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 1/14/2016 | | 1/19/2016 | | PASS |
Leon Letson
|
|
|
6 parking spaces provided in accordance with CZC15-00195. Applicant has opted to locate 4 standard parking spaces along northern portion of property. Field verified by Planning on 2-12-2016.
|
Plan resubmittals requested | | | 1/19/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/12/2016 | | 1/14/2016 | | PASS |
Carl Westfall
|
|
|
1st plan mod approved
|
Routing - PLUMBING | 1/14/2016 | | 1/14/2016 | | PASS |
Bill VanDegrift
|
|
|
1) asse 1070 mixing valve required at new public lavs
2) additional cross connection protection may be required, hair sinks, etc.
|
Plan Modification Accepted | | | 1/12/2016 | | DONE |
|
|
|
ePlanReview workflow received
|
Plan Modification Accepted | | | 1/12/2016 | | DONE |
Christina Prado
|
|
|
Plan mod requested by Architect to make changes to ADA ramp provided
|
BLD-Framing/Rough-in | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Phil Shearer
|
|
|
The lock box code is 1407. Please call me if you have any issues or questions. Phone #: ###-#### Inspection requested via web by Chris Eby
|
Print Occupancy Form | | | 10/21/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/21/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/16/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 9/17/2015 | 9/17/2015 | 10/16/2015 | | PASS |
Carl Westfall
|
|
|
(1st done) THISTLE AND POPPY SALON (Oct 7 - 15 days) - level 3
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2015 | | DONE |
Christina Prado
|
|
|
Need GC, RP , ACHD & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 10/14/2015 | | 10/15/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines.
|
Routing - Erosion and Sediment | 10/15/2015 | | 10/15/2015 | | PASS |
Evan Jenkins
|
|
|
(THISTLE AND POPPY SALON) (CZC15-00195) This building does not have a fire sprinkler system. To remodel an existing 1,584 square foot former office building (850 square feet 1st story and 734 square feet basement) to be used as a hair salon. Work is to include interior nonbearing walls, upgrading 2 restrooms to be accessible to the disabled, an interior stairway, exterior concrete steps, and an exterior circular concrete ramp accessible to the disabled. Some structural work will be done to redirect the gravity load path of the roof structure.
|
Routing - MECHANICAL | 10/15/2015 | | 10/15/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 10/14/2015 | | DONE |
|
|
|
|
1st review completed | | | 10/13/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/13/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/17/2015 | | 10/13/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - PLANNING | 9/17/2015 | | 9/22/2015 | | PASS |
Leon Letson
|
|
|
Leon Letson - CZC15-00195. Parking Lot striping must be field verified prior to C of O.
|
Routing - FIRE | 9/17/2015 | 9/17/2015 | 9/21/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing - MECHANICAL | 9/17/2015 | | 9/21/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 9/17/2015 | | 9/21/2015 | | PASS |
Bill VanDegrift
|
|
|
1) ASSE 1070 required at lavs
2) AVB required at the hair sinks
|
Routing - PUBLIC WORKS | 9/17/2015 | | 9/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/17/2015 | | 9/18/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Request Letter Required Describing work. ESC Permit Required. Evan Jenkins 794.3958
|
Routing PW Sewer Rating | 9/18/2015 | | 9/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Drainage | 9/18/2015 | | 9/18/2015 | | PASS |
Brian Murphy
|
|
|
NO REVIEW REQUIREE
|
Plan Reviewer's activity | | | 9/17/2015 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 9/17/2015 | | 9/17/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 9/17/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Pending Assignment by JCB | 9/17/2015 | | 9/17/2015 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 8/24/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2015 5:25PM
|