Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberBLD15-03029
StatusFinaled
Name 302 DESIGNS LLC
Site Address 1010 S LA POINTE ST
Project NameThe Lift
Customer NumberBLD15-03507
ePlanReviewYes
Description
(THE LIFT) Remodel to combine 2 tenant office spaces into one new restaurant tenant space per approved plans. Work to include interior demolition, new exterior work, new exterior patio, new interior walls, interior finish, new ADA restrooms, new commercial kitchen with Type I hood, plumbing work, mechanical work, and electrical work. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/23/2016 DONE
Telephone call  9/23/2016 DONE
Spoke with Jay to go over the values sent back, some were much lower and others much higher. He stated that he would get with the tenant and contractor to get the correct values and will resend the final values in.
First Notice 8/19/20169/13/2016 DONE
DetailsCandy A. Nichols
Permanent Occupancy  8/9/2016 DONE
BLD-Final8/5/20168/5/20168/5/2016PPASS
DetailsJim Storey
Please call Chris 30 min. prior to going out Phone #: ###-####
Zoning Approval8/5/20168/5/20168/5/2016 DONE
DetailsSarah Schafer
as per attached approval by Sarah Schafer; okay to sign-off and release bond
Zoning Approval8/3/20168/3/20168/3/2016 PASS
DetailsSarah Schafer
Approved per DRH15-00362. Sidewalks, parking and right-of-way improvements were not completed.
PubWorks Occupancy Approval8/2/20168/2/20168/2/2016 DONE
DetailsTiffany Lowery
BLD-Aging Inspection6/14/20166/14/20166/14/2016 PASS
DetailsJim Storey
Temporary Occupancy5/11/20168/9/20165/11/2016 DONE
DetailsCandy A. Nichols
Jason B ok'd 90 extension on temp c of o good thru Aug 9th
BLD-Aging Inspection4/11/20164/11/20164/11/2016 NR
DetailsJim Storey
work to begin in may
Temporary Occupancy2/10/20165/10/20162/10/2016 DONE
DetailsCandy A. Nichols
PubWorks Temp Occupancy Appr2/10/20162/10/20162/10/2016 DONE
DetailsBrian Murphy
temp OK
BLD-Final2/10/20162/10/20162/10/2016PPART
DetailsDave Hannah
Please call half an hour prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby ok for temp occ needs to complete ext work


as per David H. inspection was called in on the wrong permit-see permit BLD15-03507
BLD-Ceiling Grid Inspection2/10/20161/28/20162/10/2016PPASS
DetailsJim Sly
Please call a half hour prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
Plan Reviewer's activity  2/10/2016 DONE
DetailsAdele J Schaffeld-Griffin
All inspections completed under BLD15-03507
FIRE-Final Inspection2/10/20162/9/20162/9/2016PDONE
DetailsJim Page
as per Jim Page-final was called in on the demo not this permit-see BLD15-03507 for sign off
Zoning Approval Temp2/5/20162/5/20162/5/2016 PASS
DetailsJosh Wilson
180-day temp occ. Bond is in place for landscaping and concrete flat work.
BLD-Conference2/10/20161/29/20161/29/2016PDONE
DetailsJim Storey
see notes in BLD15-03507
BLD-Conference2/10/20161/28/20161/28/2016PCANC
DetailsJim Storey
see notes in BLD15-03507
BLD-Conference2/10/20161/28/20161/28/2016PCANC
DetailsJim Storey
see notes in BLD15-03507
BLD-Conference2/10/20161/28/20161/28/2016PCANC
DetailsJim Sly
I just have a few A.D.A questions. Please call a half hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Chris Eby Inspection cancelled from web by: Chris Eby
BLD-Wall cover2/10/201612/10/201512/10/2015PPASS
DetailsMike Jordan
We need a framing inspection for approval to cover walls. Please give me a call half an hour before the inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
BLD-Framing/Rough-in2/10/201612/10/201512/10/2015PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Chris Eby
BLD-Conference2/10/201612/1/201512/1/2015PPASS
DetailsJim Storey
I want to go over ADA compliance for the bathrooms.
Please give me a call 30 minutes prior to the conference. My name is Chris Eby. Phone #: ###-#### Inspection requested via web by Chris Eby
OVERRIDE  11/10/2015  
Plan assigned to (AJS)9/25/20159/25/201511/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 3 TI - ePlanReview - The Lift
Issue PAID IN FULL permit  11/10/2015 DONE
Print Occupancy Form  11/10/2015 DONE
Routing PW Drainage11/10/2015 11/10/2015 PASS
DetailsBrian Murphy
Routing - PLAN CHECK11/10/2015 11/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/10/2015 DONE
Permit Ready to Issue  11/10/2015 DONE
NEED RP, GC form, and certificate of value
Routing - MECHANICAL11/6/2015 11/6/2015 PASS
DetailsTroy James
Routing - PLAN CHECK11/6/2015 11/6/2015 FAIL
DetailsAdele J Schaffeld-Griffin
approved pending drainage sign off
Routing PW Drainage11/6/2015 11/6/2015 FAIL
DetailsBrian Murphy
Routing PW Flood Plain10/23/2015 10/30/2015 PASS
DetailsJim Wyllie
Project improvements do not meet "substantial improvement" definition. Floodplain building conditions do not apply. Jim Wyllie / ###-####
Routing - PLAN CHECK10/23/2015 10/29/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Drainage10/23/2015 10/29/2015 FAIL
DetailsBrian Murphy
NEEDS WORKING SYSTEM O/ S TRAP
Routing PW Environmental9/25/2015 10/29/2015 PASS
DetailsRick Christenson
Needs 1500 Gallon Exterior Grease Interceptor. MopSink connected to interceptor.
Routing - MECHANICAL10/29/2015 10/29/2015 FAIL
DetailsTroy James
uploaded new plans and completed review
Routing - PLANNING10/23/2015 10/27/2015 PASS
DetailsSusan Riggs
This does not approve andy construction, fencing, tables, or landscaping in the right-of-way with our a license agreement from ACHD.
Routing - MECHANICAL10/23/2015 10/26/2015 FAIL
DetailsTroy James
No response to mechanical comments.
Routing - PUBLIC WORKS10/23/2015 10/23/2015 PASS
DetailsJennifer Bruner
1st review completed  10/21/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK9/25/2015 10/21/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Drainage9/25/2015 10/7/2015 FAIL
DetailsBrian Murphy
NEED SEEPAGE BED INFO
Routing - PLANNING9/25/2015 9/30/2015 FAIL
DetailsCody Riddle
Susan Riggs - CAA-00167

Fail: A lic. agreement from ACHD is required for the patio in the ROW, prior to issuance of permit. Emailed applicant. CER
Routing Off Site - C.D.H9/25/2015 9/29/2015 PASS
DetailsAdele J Schaffeld-Griffin
signe off by Lori Badigian at CDH in e plan
Routing PW Sewer Rating9/25/2015 9/29/2015 PASS
DetailsJennifer Bruner
Routing - FIRE9/25/20159/25/20159/28/2015 PASS
DetailsScott Arellano
Report attached to case.
Routing PW Street Lights9/25/2015 9/28/2015 PASS
DetailsMike D Hedge
No new street lights required.
Routing - MECHANICAL9/25/2015 9/28/2015 FAIL
DetailsTroy James
Routing - PLUMBING9/25/2015 9/28/2015 PASS
DetailsBill VanDegrift
ASSE 1070 mixing valve at hand sinks
Routing - Design Review9/25/2015 9/25/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00362
Routing - Addressing9/25/2015 9/25/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/25/2015 9/25/2015 PASS
DetailsJennifer Bruner
Pending Assignment by JCB9/25/2015 9/25/2015 DONE
DetailsJason Blais
Routing - Erosion and Sediment9/25/2015 9/25/2015 PASS
DetailsEvan Jenkins
(THE LIFT) Remodel to combine 2 tenant office spaces into one new restaurant tenant space per approved plans. Work to include interior demolition, new exterior work, new exterior patio, new interior walls, interior finish, new restrooms, new commercial kitchen with Type I hood, plumbing work, mechanical work, and electrical work.
Intake Approval  9/23/2015 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Intake Approval  9/21/2015 FAIL
DetailsAdele J Schaffeld-Griffin
9/21/15 Please see mark ups on check list. Only 1 of the items missing was addressed.
Intake Approval  9/21/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please upload the completed check list. A pre screen will be done once received.
Please see change mark on documents.

9/8/15
Please re upload your documents (checklist) to read left to right. Please name the files the same in order for them to version. Please see electronic submittal standards for requirements. Once the uploading is correct I will begin the pre screen.

9/10/15- see mark ups on check list sheets for additional items needed.

9/21/15 Please see mark ups on check list. Only 1 of the items missing was addressed.

9/21/15 Please see mark ups on check list. Only 1 additional item missing was addressed. Please see all items that are marked as missing or needing addressed.
Intake Approval  9/10/2015 FAIL
DetailsAdele J Schaffeld-Griffin
9/10/15- see mark ups on check list sheets for additional items needed.
Intake Approval  9/8/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please upload the completed check list. A pre screen will be done once received.
Please see change mark on documents.
Intake Approval  9/8/2015 FAIL
DetailsAdele J Schaffeld-Griffin
9/8/15
Please re upload your documents (checklist) to read left to right. Please name the files the same in order for them to version. Please see electronic submittal standards for requirements. Once the uploading is correct I will begin the pre screen.
Application received  8/24/2015 DONE
Application submitted via PDS Online on Aug 24 2015 8:27PM
BLD-Conference2/10/20162/10/2016 P 
Routing PW Flood Plain9/25/2015   FAIL
DetailsJim Wyllie
NEED SEEPAGE BED INFO