Permit Information
Permit NumberBLD15-03146
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron B 2 / 3
Customer NumberC23941
ePlanReviewNo
Description
Micron Building 2 and 3 - (C23941) – B 2 & 3 Remodel to existing H-5 Area that is actual split into two separate buildings to comply with building area provisions To remodel the entire 39,000 square foot first floor area and a large area of the second floor. These buildings are sprinklered based on “H” occupancy requirements. The work includes: construction of new interior partitions, installation of new lighting, installation of new plumbing, installation of new HEPA ceiling system, installation of new mechanical, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20168/12/20168/12/2016APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Frederick Sand
DOC - Permit Finaled8/12/20168/12/20168/12/2016PPASS
DetailsJim Storey
FIRE-Final Inspection8/9/20168/10/20168/10/2016APASS
DetailsJim Page
Fire sprinkler inspections are complete, fire alarm inspections are complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Final Inspection6/16/20166/16/20166/16/2016APART
DetailsJim Page
Final life fire safety inspection performed for Building 3 Level 1 office area, fire sprinklers are complete for this area, fire alarms are complete for this area, life fire safety inspection complete for this area.
FIRE-Conference6/15/20166/16/20166/16/2016ADONE
DetailsJim Page
Fire conference complete.
BLD-Conference6/15/20166/16/20166/15/2016ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Frederick Sand Inspection cancelled from web by: Frederick Sand
BLD-Conference6/10/20166/13/20166/13/2016APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Frederick Sand firestop/ door sm seals/closer/si final letter/exit signage
BLD-Conference5/26/20165/31/20166/1/2016ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Frederick Sand Inspection cancelled from web by: Frederick Sand
BLD-Conference3/31/20164/1/20164/1/2016APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Frederick Sand maintane exit pathwats clear to mustring areas/ fire stopping 6 in oc at mesh/ collor atchments to wall listing
BLD-Conference3/4/20163/7/20163/7/2016APASS
DetailsJim Storey
Meet in 25 and review the prints and head to the project. Phone #: ###-#### Inspection requested via web by Greg Kirkes
BLD-Ceiling Grid Inspection3/4/20163/7/20163/7/2016APASS
DetailsJim Storey
ceiling grid inspection to cover. call for meeting place. Phone #: ###-#### Inspection requested via web by Greg Kirkes office area ok
BLD-Conference3/4/20163/4/20163/4/2016ACANC
DetailsMike Jordan
ceiling grid inspection to cover. call for meeting place. Phone #: ###-#### Inspection requested via web by Greg Kirkes
BLD-Conference2/29/20163/2/20163/2/2016ACANC
DetailsJim Storey
Meet at Greg''s cube Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
(F) Reprint permit  3/2/2016 DONE
(F) Reprint permit  3/2/2016 DONE
DetailsChristina Prado
Inspection Record Card- Bld  3/2/2016 DONE
DetailsChristina Prado
(F) Reprint permit  3/1/2016 DONE
Print Occupancy Form  3/1/2016 DONE
Permit Ready to Issue  2/29/2016 DONE
All Met
Issue PAID IN FULL permit  2/29/2016 DONE
DetailsChristina Prado
Routing - FIRE2/26/20162/26/20162/26/2016 PASS
DetailsKatie Marron
Attached comment to plans.
PLANS/APPL TAKEN TO FRONT DESK  2/26/2016 DONE
Case Summary (BLD)  2/26/2016 DONE
Plan assigned to (TLW)2/18/2016 2/26/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/18/2016 2/26/2016 PASS
DetailsTim L. Woodard
This was actually for the structural resubmittal only and passed our outsource engineer today.
Plan resubmittals received  2/26/2016 DONE
Two copies of sheets revision 2 and revision 3. Taken to Tim W
Plan assigned to (TLW)9/14/2015 2/26/2016 PASS
DetailsTim L. Woodard
1st Review Completed
Routing - PLAN CHECK2/26/2016 2/26/2016 PASS
DetailsTim L. Woodard
Approved with architectural resubmittals. TLW
Routing - PLAN CHECK11/13/2015 2/26/2016 FAIL
DetailsTim L. Woodard
Only recieved structural resubs, no architectural. TLW
Plan resubmittals received  2/25/2016 DONE
received contractor responses for building review and fire review
Plan resubmittals received  2/18/2016 DONE
Four copies of Structural Calculations and four copies of sheets a building 3 first floor, 1 building 2 first floor, 1 building 2 second floor, 0 building 2, 0 building 2. Taken to Tim
Routing Off Site - STRUCTURAL11/19/2015 11/24/2015 FAIL
DetailsTim L. Woodard
Comments emailed to Micron and Architect/Engineer. TLW
Plan resubmittals received  11/13/2015 DONE
Three copies of Structural Calculations. Taken to Tim W
Routing - FIRE10/8/2015 10/16/2015 FAIL
DetailsKatie Marron
Comments attached to case and emailed to Paul Marcolina.
1st review completed  10/16/2015 FAIL
Failed Plan Check and Fire
Routing - PLAN CHECK10/1/2015 10/7/2015 FAIL
DetailsTim L. Woodard
Refer to attached Plan Review Report. TLW
Routing - MECHANICAL9/22/2015 10/1/2015 PASS
DetailsTroy James
Routing Off Site - STRUCTURAL9/16/2015 10/1/2015 PASS
DetailsTim L. Woodard
Routing - PLUMBING  9/28/2015 PASS
DetailsDaryl Spivey
per plans and ISPC
Routing - PUBLIC WORKS9/17/2015 9/23/2015 PASS
DetailsJennifer Bruner
Routing PW Environmental9/17/2015 9/23/2015 PASS
DetailsTerry Alber
Any sewer discharge must comply w/ existing pretreatment permit.
Routing - Design Review9/16/2015 9/18/2015 PASS
DetailsSarah Schafer
Approved.
Routing - Addressing  9/17/2015 PASS
Routing PW Sewer Rating9/17/2015 9/17/2015 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  9/14/2015 DONE
Intake Approval  9/14/2015 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  9/14/2015 DONE
no fees collected at intake
Application received  9/1/2015 DONE
This permit was created on the web by Paul Marcolina
Plan assigned from Web9/1/20159/11/2015