Second Notice | | 7/24/2016 | 7/27/2016 | | DONE |
|
|
|
This permit finaled on the web by Jeff Tonkin
|
First Notice | 6/17/2016 | 6/17/2016 | 7/14/2016 | | DONE |
Jim Sly
|
|
|
Mailed 7-15-16
|
BLD-Final | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Jim Sly
|
|
|
|
Plan assigned to (AJS) | 4/20/2016 | 4/20/2016 | 6/17/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
no plans recieved yet/ no plan mod request removed by Tucker with HC company. would like final scheduled
|
Letter of compliance/Occupancy | | | 6/17/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/17/2016 | | DONE |
|
|
|
as per Alex DeYoung; change status
|
BLD-Final | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PEND |
Jim Sly
|
|
|
For part temp only // Tucker Phone #: ###-#### Leaving Permit open.......They may modify plan and do some more work.........On approval from P.D.S.
|
Telephone call | | | 6/7/2016 | | DONE |
|
|
|
Tucker requested a temp c of o but this permit does not get a c of o so no temp is required-however i did explain to Tucker that if they decide not to do the modification that Brad will need to contact Adele to requet the modification be changed back to issued
|
Plan Modification Accepted | | | 4/20/2016 | | DONE |
Christina Prado
|
|
|
Plan Modification to reconfigure the doors for security
|
BLD-Final | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Sly
|
|
|
Jason Phone #: ###-#### OK for Temp. Occ. OK for perm. Occ. when Electrical Perms.
|
FIRE-Final Inspection | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Sprinkler Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | FAIL |
Troy Cobbley
|
|
|
Repair the "request to exit" buttons on the two east doors.
|
FIRE-Final Inspection | 2/5/2016 | 2/5/2016 | 2/5/2016 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the access controled egress doors meet all six of the requriements of IFC as noted in red on the plans sheet 2. The fire alarm interconnect was tested and passed today.
|
BLD-Ceiling Grid Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/2/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 9/11/2015 | 9/11/2015 | 10/28/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - HP Bldg 8
|
Routing - PLAN CHECK | 10/28/2015 | | 10/28/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/28/2015 | | DONE |
Christina Prado
|
|
|
***Met 10-29-15 blh*** Need GC & Revised Certificate of Value for issuance
|
1st review completed | | | 9/30/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/11/2015 | | 9/30/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 9/11/2015 | 9/11/2015 | 9/17/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing - PLUMBING | 9/11/2015 | | 9/15/2015 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 9/11/2015 | | 9/14/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2015 | | 9/11/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Pending Assignment by JCB | 9/11/2015 | | 9/11/2015 | | DONE |
Jason Blais
|
|
|
|
Routing PW Sewer Rating | 9/11/2015 | | 9/11/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 9/4/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by David Ferguson and plan review fees paid.
|
Application received | | | 9/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 2 2015 7:56AM
|