BLD-Final | 9/19/2016 | 9/20/2016 | 9/21/2016 | P | PASS |
Dave Hannah
|
|
|
Russ Phone #: ###-####// please call before
|
DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/24/2016 | 8/24/2016 | 8/25/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/23/2016 | 8/23/2016 | 8/25/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Footing | 4/7/2016 | 4/11/2016 | 4/11/2016 | A | PASS |
Dave Hannah
|
|
|
Russ-Deck Phone #: ###-####
|
BLD-Conference | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | DONE |
Dave Hannah
|
|
|
Russ Phone #: ###-####
|
BLD-Footing | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Dave Hannah
|
|
|
Russ Phone #: ###-####
|
PubWorks Subgrade Approval | 4/5/2016 | 4/5/2016 | 4/5/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (BLD) | 3/2/2016 | 3/2/2016 | 3/2/2016 | A | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 3/2/2016 | 3/2/2016 | 3/2/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/2/2016 | | 3/2/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/2/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/2/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/2/2015 | 9/2/2015 | 9/2/2015 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/2/2015 | 9/2/2015 | 9/2/2015 | A | FAIL |
David Ferguson
|
|
|
Needs engineered footings for Hillside. Needs fire treated lumber or heavy timber for WUI.
|
1st review completed | | | 9/2/2015 | | FAIL |
David Ferguson
|
|
|
|
Application received | | 9/2/2015 | | | |
|
|
|
|