Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-03155
StatusFinaled
Name POCHOP RUSSELL
Site Address 965 N HAINES ST
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A and Hillside - Scope of work is to replace the existing 120 sq.ft. rear deck with a larger 220 sq. ft. deck. The new deck will be built to meet the WUI district requirements by using a combination of heavy timbers, fire-retardant treated lumber and Trex Transcend railing and decking material. The work will be performed per the approved drawings, local codes and stamped approved engineering. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20169/20/20169/21/2016PPASS
DetailsDave Hannah
Russ Phone #: ###-####// please call before
DOC - Permit Finaled9/21/20169/21/20169/21/2016APASS
DetailsDave Hannah
BLD-Aging Inspection8/24/20168/24/20168/25/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/23/20168/23/20168/25/2016 PEND
DetailsDave Hannah
BLD-Footing4/7/20164/11/20164/11/2016APASS
DetailsDave Hannah
Russ-Deck Phone #: ###-####
BLD-Conference4/6/20164/7/20164/7/2016ADONE
DetailsDave Hannah
Russ Phone #: ###-####
BLD-Footing4/5/20164/5/20164/5/2016PPASS
DetailsDave Hannah
Russ Phone #: ###-####
PubWorks Subgrade Approval4/5/20164/5/20164/5/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Routing Walk-In (BLD)3/2/20163/2/20163/2/2016APASS
DetailsDavid Ferguson
Plan assigned to (DAF)3/2/20163/2/20163/2/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/2/2016 3/2/2016 PASS
DetailsDavid Ferguson
Inspection Record Card- Bld  3/2/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  3/2/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/2/2016 DONE
Permit Ready to Issue  3/2/2016 DONE
Issue PAID IN FULL permit  3/2/2016 DONE
Routing Walk-In (Zoning)9/2/20159/2/20159/2/2015ADONE
DetailsSue Cummings
Routing Walk-In (BLD)9/2/20159/2/20159/2/2015AFAIL
DetailsDavid Ferguson
Needs engineered footings for Hillside. Needs fire treated lumber or heavy timber for WUI.
1st review completed  9/2/2015 FAIL
DetailsDavid Ferguson
Application received 9/2/2015