BLD-Final | 3/4/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/30/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | FAIL |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Provide king stud at end of double LVL in garage by furnace and end nail. Add (2) 2x6 studs under 2 ply girder truss at bearing in garage. Complete fireblocking at ceiling level at decorative columns. Roll blocl all trusses with heels greater than 9 inches at all bearing points. Ok to insulate. Correction notice posted.
|
BLD-Framing/Rough-in | 11/23/2015 | 11/24/2015 | 11/24/2015 | A | NR |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Electrical rough in inspection has failed.
|
BLD-Wall Bracing | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Wall Bracing | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | FAIL |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Provide approved set of plans. Correction notice posted.
|
BLD-Foundation | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
CHANGE STATUS TO (ISS) | | | 10/20/2015 | | DONE |
|
|
|
plan mod fees paid
|
OVERRIDE | | | 10/16/2015 | | |
|
|
|
|
BLD-Footing | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PART |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
Plan assigned to (BJM) | 10/14/2015 | 10/14/2015 | 10/16/2015 | | DONE |
Brian McGowan
|
|
|
new floor plans
|
Routing - PLAN CHECK | 10/14/2015 | | 10/16/2015 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2015 | | DONE |
|
|
|
plan mod fee due- do NOT re-issue
|
BLD-Footing | 10/14/2015 | 10/14/2015 | 10/14/2015 | P | NR |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Plan resubmittals received | | | 10/14/2015 | | DONE |
|
|
|
plan mod work flow activiated-4 of the rooms will have taller ceilings so will change the roof structure-but will not change outside roof structure appearance
|
BLD-Footing | 10/13/2015 | 10/13/2015 | 10/13/2015 | P | NR |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. pad not excavated, no forms or workers on site.
|
Issue PAID IN FULL permit | | | 10/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/25/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/14/2015 | 9/14/2015 | 9/25/2015 | | DONE |
Brian McGowan
|
|
|
1st review complete 9/18
|
Routing - PLAN CHECK | 9/22/2015 | | 9/25/2015 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/25/2015 | | DONE |
|
|
|
all requirments met
|
Routing - MECHANICAL | 9/22/2015 | | 9/24/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/22/2015 | | DONE |
|
|
|
|
1st review completed | | | 9/18/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/3/2015 | | 9/18/2015 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 9/3/2015 | | 9/16/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLAN CHECK | 9/15/2015 | | 9/15/2015 | | PASS |
Tisha Gallop
|
|
|
per BJM
|
Plan assigned to (LEG) Tisha | 9/3/2015 | | 9/14/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 9/3/2015 | | 9/4/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 9/3/2015 | | 9/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/3/2015 | | 9/4/2015 | | PASS |
Beverly Mountain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/3/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/3/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/3/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 2 2015 12:42PM
|