Permit Information
Permit NumberBLD15-03164
StatusFinaled
Name GREENWOOD INVESTMENTS
Site Address 1879 E RIDGECREST DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan Modification for rock retaining wall along West side of Property. Height of proposed wall ranges form 3' to 6' above finished grade. Engineering for a total wall height up to 8' (includes the 1' toe bury at base) has been provided. All work to be done according to plans, notes, engineering and local codes. **BJM** Applicant to pay $904.25 for geotech services. **DAF** WUI Zone "A", class "A" roof required. Permit for the construction of a new 3,205 sq. ft., two story (main level 1,817 sq. ft., finished basement 1,388 sq. ft.) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 596 sq. ft. of covered patio/porch and a 698 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/201811/7/201811/7/2018APASS
DetailsBrandon Shaw
Garage code for entry is: 3412 Phone #: ###-#### Inspection requested via web by James Greenwood
DOC - Permit Finaled11/7/201811/7/201811/7/2018PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval11/6/201811/6/201811/6/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Other8/30/20188/30/20188/30/2018PDEFR
DetailsDave Hannah
Roof storm water drainage inspection.
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Aging Inspection6/8/20186/8/20186/11/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection6/7/20186/7/20186/11/2018 PEND
DetailsDave Hannah
BLD-Energy code compliance1/24/20181/24/20181/24/2018APASS
DetailsDave Hannah
BLD-Wall cover1/23/20181/23/20181/24/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Energy code compliance1/23/20181/23/20181/24/2018PPASS
DetailsDave Hannah
Fire blocking complete at top plate of lower level. Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Framing/Rough-in1/23/20181/23/20181/24/2018PPASS
DetailsDave Hannah
The truss sheets in book are updated. Older truss sheets on table under 2x4. Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Framing/Rough-in1/19/20181/19/20181/19/2018PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood c/n on site ok to insulate
BLD-Energy code compliance1/19/20181/19/20181/19/2018PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood air seal ok
BLD-Other12/12/201712/13/201712/14/2017PPASS
DetailsDave Hannah
fire rated soffit inspection, ladders in garage for access. Phone #: ###-#### Inspection requested via web by James Greenwood
CHANGE STATUS TO (ISS)  7/7/2017 DONE
as per Brian McGowan and Jason T ok to change status back to issue
BLD-Other4/26/20174/26/20174/26/2017APEND
DetailsDave Hannah
fire rated soffit inspection// Luke ###-####
Plan assigned to (BJM)4/20/20174/20/20174/26/2017 DONE
DetailsBrian McGowan
PLAN MOD RECIEVED 4/20/17- As per Jason Taylor, only the Grading Plan for retaining walls is needed. No modifications were made for Plan Check.
Routing - PLAN CHECK4/20/2017 4/26/2017 PASS
DetailsBrian McGowan
PLAN MOD RECIEVED 4/20/17- As per Jason Taylor, only the Grading Plan for retaining walls is needed. No modifications were made for Plan Check.
Plan resubmittals received  4/20/2017 DONE
Three copies of sheets CG-101,CG-102,CG-501, C-1.0, C-1.1, C-1.2, C-2.0 and C-2.1 taken to Brian Mc
Plan Modification Accepted  12/14/2016 DONE
new manual j report
Routing - MECHANICAL12/14/2016 12/14/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing11/21/201611/21/201611/22/2016PPASS
DetailsDave Hannah
Shear // Jim Phone #: ###-#### ok to cover but needs fl to fl strapes
(F) Reprint permit  10/17/2016 DONE
CHANGE STATUS TO (ISS)  10/17/2016 DONE
plan mod fees paid
Plan assigned to (BJM)9/27/20169/27/201610/14/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK10/11/2016 10/14/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  10/14/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  10/14/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  10/14/2016 DONE
PLEASE DO NOT RE ISSUE
Telephone call  10/14/2016 DONE
called Jim to let know permit is ready and what the fees are
Routing - PLANNING10/12/2016 10/13/2016 PASS
DetailsColleen T Carroll
Routing PW Grading-Hillside10/11/2016 10/12/2016 PASS
DetailsJason C. Taylor
Modified grading plan approved. Retaining walls on West side approved for construction. JCT
Plan Modification Accepted  10/11/2016 DONE
modifications turned in for plan sheet (C-1.2)
Routing - PLAN CHECK9/29/2016 10/6/2016 FAIL
DetailsBrian McGowan
See Jason Taylor notes. Grading plan did not change to show new proposed elevations.
Routing PW Grading-Hillside9/28/2016 9/29/2016 FAIL
DetailsJason C. Taylor
Grading plan will need to be revised to show "Top of Wall" and "Bottom of Wall" elevations. Engineering is for a 8' tall wall that will not meet planning setback standards. JCT
Telephone call  9/27/2016 DONE
Spoke with Jim informing him that since his permit has already been issued, the plans he turned in would fall under a plan modification and we would need the 522 app.
Plan Modification Accepted  9/27/2016 DONE
One sheet C-2.0 taken to Brian Mc
BLD-Foundation9/13/20169/13/20169/13/2016PPASS
DetailsPhil Shearer
BLD-Foundation8/18/20168/19/20168/19/2016APEND
DetailsPhil Shearer
BLD-Footing8/16/20168/16/20168/16/2016PPASS
DetailsPhil Shearer
JR Phone #: ###-####
BLD-Footing8/15/20168/16/20168/16/2016ACANC
DetailsPhil Shearer
JR Phone #: ###-####
BLD-Foundation7/24/20167/25/20167/25/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Footing7/15/20167/18/20167/18/2016APART
DetailsDave Hannah
J.R. Phone #: ###-#### ok to pour basemen ftgs
BLD-Footing7/12/20167/15/20167/15/2016PNR
DetailsJim Storey
Contact: JR Poulsen Phone #: ###-#### Inspection requested via web by James Greenwood need pw sign off
PubWorks Subgrade Approval7/15/20167/15/20167/15/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  5/13/2016 DONE
Extend Review Timeline  3/17/2016 DONE
1st 180 days granted by Jason B. See documents
Telephone call  3/16/2016 DONE
Left another message recommending to email Jason B requesting an extension which would give them an extra 180 if they are not ready to pick up the permit.
Telephone call  3/16/2016 DONE
customer returned call from Brittany-he will email Jason B for an extension
Telephone call  3/10/2016 DONE
Left a message for Jim informing him that the permit is 9 days past its expiration date and recommended that if they are not ready to pick up the permit to send a extension request to Jason B
OVERRIDE  3/7/2016  
Plan assigned to (BJM)9/15/20159/15/20153/7/2016 DONE
DetailsBrian McGowan
!st Review Completed-Failed-Grading Plan doesn't match Architectural Plans-due 9/24 L2
Routing - PLAN CHECK12/4/2015 3/7/2016 FAIL
DetailsBrian McGowan
Needs to Pass PW Hillside first
Routing - PLAN CHECK2/17/2016 3/7/2016 FAIL
DetailsBrian McGowan
Needs to pass PW Hillside
Inspection Record Card- Bld  3/7/2016 DONE
Telephone call  3/7/2016 DONE
Left a message for Jim informing him that the permit is ready to be picked up and the fee amount that is due
Routing - PLAN CHECK3/4/2016 3/7/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  3/7/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/7/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/7/2016 DONE
requirements met
Routing PW Grading-Hillside3/3/2016 3/4/2016 PASS
DetailsJim Wyllie
Jason T passed for hillside, but did not sign off on routing sheet. Sent to JEW for review and sign off while JT is out of the office.
Routing - PUBLIC WORKS  3/4/2016 PASS
Routing PW Sewer Rating  3/4/2016 PASS
Routing PW Sewer Design3/3/2016 3/3/2016 PASS
DetailsMike Sheppard
Routing PW Grading-Hillside2/26/2016 2/26/2016 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  2/19/2016 DONE
received extra copy of grading plan
Routing PW Grading-Hillside2/11/2016 2/17/2016 FAIL
DetailsJason C. Taylor
Need extra copy of grading plan set for approval. JCT
Routing - PUBLIC WORKS2/17/2016 2/17/2016 FAIL
DetailsJennifer Bruner
Please see PW Grading-Hillside
Plan resubmittals received  2/4/2016 DONE
resubmittlas recieved the extra paperwork Jason Taylor requested. 2 sets of sheets C-1.0, C-1.1, -1.2, -2.0, C-2.1-took to Brian McGowan
Routing PW Sewer Design1/14/2016 1/14/2016 FAIL
DetailsBeverly Mountain
FAILED SEWER DESIGN - must build new main sewer behind house before plans can be issued. bam See Mike Sheppard
Routing PW Grading-Hillside12/14/2015 12/14/2015 FAIL
DetailsJason C. Taylor
Sent email to enginer and owner with specific edits needed for this site. JCT
Routing - PUBLIC WORKS12/14/2015 12/14/2015 FAIL
DetailsRachael Beierle
FAILED HILLSIDE. CONTACT JASON @ 3946
Plan resubmittals received  12/4/2015 DONE
received (2) copies of engineering letter
Routing - PLAN CHECK12/3/2015 12/3/2015 FAIL
DetailsBrian McGowan
Hillside Lot, Special Report designated it as a Site Class E. Engineering was done as a Site Class D.
Emailed Jim Greenwood about the situation on 12-1-15
Plan resubmittals received  11/30/2015 DONE
resubmittals received 2 sets of sheet 13 & 14-took to Brian McGowan
Plan resubmittals received  11/17/2015 DONE
resubmittals received 2 eng calcs & 2 sets of each sheet 1-14 & C-1.2-took to Brian M
Routing - PLAN CHECK9/16/2015 10/14/2015 FAIL
DetailsBrian McGowan
Additional engineering required, specific deck details requested, grading plan at man door in garage issues.
Plan resubmittals received  10/12/2015 DONE
received two copies of sheet 2 and sheet 9- put with plans on Brian's desk
Plan resubmittals received  10/8/2015 DONE
received two copies of sheets C-1.2, 9, 2, and engineering- put with plans on Brian's desk
1st review completed  9/22/2015 FAIL
DetailsBrian McGowan
The grading plan and the proposed structure does not correspond.
Routing - PLAN CHECK9/3/2015 9/22/2015 FAIL
DetailsBrian McGowan
grading plan does not match structure
Routing - Erosion and Sediment9/15/2015 9/16/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

Permit for the construction of a new 3,205 sq. ft., two story (main level 1,817 sq. ft., finished basement 1,388 sq. ft.) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 596 sq. ft. of covered patio/porch and a 698 sq. ft. attached garage
Routing - FIRE9/16/2015 9/16/2015 PASS
DetailsScott Arellano
No comments attached.
Routing - MECHANICAL  9/15/2015 PASS
Plan assigned to (LEG) Tisha9/3/2015 9/15/2015 DEFR
DetailsTisha Gallop
Routing - PLANNING9/8/2015 9/10/2015 PASS
DetailsTed Vanegas
Routing PW Grading-Hillside  9/8/2015 FAIL
Need third party geotechnical review prior to approval from PW or Building Department. Jason Taylor ###-####.
Routing - Addressing9/3/2015 9/8/2015 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS9/3/2015 9/8/2015 FAIL
DetailsJennifer Bruner
See hillside.
Telephone call  9/3/2015 DONE
called Jim -left message- he needs to bring in one more grading and drainage plan per JCT- explained I can't start the review process until he submits that plan
Plans ACCEPTED BY PLAN TECH  9/3/2015 DONE
Intake Approval  9/3/2015 PASS
Recd Pcfee & Taken To Pln CK  9/3/2015 DONE
Application received 9/2/2015