BLD-Final | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PASS |
Tony Young
|
|
|
Dean Phone #: ###-####
|
DOC - Permit Finaled | 12/6/2016 | 12/6/2016 | 12/6/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
Elevation Cert Rec'd-Final | | | 12/6/2016 | | DONE |
|
|
|
Elevation Certificate based upon "Finished Construction" received. Okay to issue building occupancy.
Jim Wyllie / ###-####
|
Zoning Approval | 12/2/2016 | 12/2/2016 | 12/2/2016 | | DONE |
Andrea Tuning
|
|
|
|
Override - Condition Holds | | | 12/2/2016 | | |
|
|
|
|
BLD-Aging Inspection | 11/25/2016 | 11/25/2016 | 12/1/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/24/2016 | 11/24/2016 | 12/1/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | PASS |
Tony Young
|
|
|
Dean Phone #: ###-####
|
BLD-Energy code compliance | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PEND |
Tony Young
|
|
|
Dean Phone #: ###-####,, not all the way complete
|
BLD-Energy code compliance | 7/7/2016 | 7/12/2016 | 7/12/2016 | P | PART |
Tony Young
|
|
|
Dean Phone #: ###-####,, late pm or Wed am// seal ok
|
BLD-Framing/Rough-in | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Tony Young
|
|
|
Dean Phone #: ###-####
|
Elevation Cert Rec'd-Midconst | | | 7/7/2016 | | DONE |
|
|
|
Elevation Certificate base upon "Building Under Construction" has been submitted. Okay to schedule a framing inspection.
Jim Wyllie / ###-####
|
BLD-Other | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Tony Young
|
|
|
soffit,, Dry wall // Dean Phone #: ###-####,, work in progress,, ok
|
BLD-Wall cover | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PART |
Tony Young
|
|
|
Dry wall // Dean Phone #: 941- one half of lower side is done on soffits
|
BLD-Conference | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Tony Young
|
|
|
Verify setbacks adjacent to school property.,, measures about 15' or more
|
BLD-Wall Bracing | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | PASS |
Tony Young
|
|
|
Dean Phone #: ###-####
|
Plan Modification Accepted | | | 5/6/2016 | | DONE |
|
|
|
new manual j reports
|
Routing - MECHANICAL | 5/6/2016 | | 5/6/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Conference | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Dave Hannah
|
|
|
Dean Phone #: ###-#### unit seperation
|
BLD-Conference | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Tony Young
|
|
|
Dean Phone #: ###-####,, frame ?s
|
BLD-Footing | 2/23/2016 | 2/24/2016 | 2/24/2016 | P | PASS |
Tony Young
|
|
|
Dean Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/29/2016 | | DONE |
|
|
|
|
Telephone call | | | 12/2/2015 | | DONE |
|
|
|
Spoke with Dean informing him that this permit ready to be picked up and the fee amount that is due. He asked if it's ok to pick up in two weeks and I informed him that he has until March 1st before they expire.
|
OVERRIDE | | | 12/1/2015 | | |
|
|
|
|
OVERRIDE | | | 12/1/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 10/23/2015 | | 12/1/2015 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 12/1/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/1/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (LEG) Tisha | 9/3/2015 | | 12/1/2015 | | DONE |
Tisha Gallop
|
|
|
*routed to floodplan 11/17; 1st review 9/23, 2nd plan check 10/7; duplex & floodplain
|
Routing - PUBLIC WORKS | 11/23/2015 | | 11/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | 11/17/2015 | | 11/20/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PLAN CHECK | | | 10/23/2015 | | PASS |
Tisha Gallop
|
|
|
|
Routing PW Flood Plain | 10/21/2015 | | 10/22/2015 | | FAIL |
Jim Wyllie
|
|
|
Corrected Elevation Certificate needs to be submitted. Elevation Certificate shall specify type and capacity of flood vents. Elevation information shown on the Elevation Certificate must also be shown on the building plans. Elevations can be shown on a typical section of the building foundation. All new electrical and mechanical equipment shall be installed above the bsae flood level. Two additional Elevation Certificates will be required: One prior to receiving a framing inspection and one based upon finished construction. This information is shown on a letter to Mr. Hill dated 10-21-15. Jim Wyllie / ###-####
|
Plan resubmittals received | | | 10/21/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/19/2015 | | DONE |
|
|
|
Four copies of sheet 11, 10, 5 and 2. Taken to Tisha
|
Routing - PLAN CHECK | 10/6/2015 | | 10/7/2015 | | FAIL |
Tisha Gallop
|
|
|
need continuous 1hr rated wall at stair corridor and WUI A requirements
|
Plan resubmittals received | | | 10/6/2015 | | DONE |
|
|
|
received (2) copies of; Foundation (pg.2), Upper Floor (pg.5), and Roof (pg.10)
|
Routing PW Flood Plain | 9/23/2015 | | 10/6/2015 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate is not correct. Jim Wyllie / ###-####
|
1st review completed | | | 9/23/2015 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/16/2015 | | 9/23/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 9/9/2015 | | 9/16/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/9/2015 | | 9/9/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PUBLIC WORKS | 9/8/2015 | | 9/9/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/3/2015 | | 9/8/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/3/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/3/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/3/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 9/3/2015 | | | |
|
|
|
|